Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 46.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:7953 Evander Andrews Power Complex Month:JQ OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. 3SCHEDULE1.IDENTIFICATION cSurveyContact ^JbSubmitBy Submit Date Cheryl HobbsContact A3iJointVentureAccountantTitle Accept By Accept Date PO Box 70Address City/Statc/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Boise ID 83707 Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home Plant ID 7953 Plant Address Plant City Plant State ID 0CHPYes No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X YesRegulated No by Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:10 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0,1 cents Gases:MCF %->\y1 "465.8 y 321 4VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S SNG 16,001 irsNG542252.4 249.3 \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:7953 Evander Andrews Power Complex Month:]() OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Coal.Pet Coke,Oil Natural GasCoalOnly Coal,Pet Coke and Oil Only Supplier Contract Type Sulfur ContentContract Expiration Date Energy Heat Content Ash Mercury Firm or Content tnterrapt- Predominant Mode Secondary ModeSourceContent Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percentweight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% perunit 0.01%0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG I F PL VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG I F PL CP Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plarit;7953 Evander Andrews Power Complex Month JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Energy Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG VARIOUS (NATURAL GAS SPOT PURCtIASLS ONLY) S NG o^r Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2012 plant;7953 Evander Andrews Power Complex Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Source Quantity Type Of SulfurAvgHeat Content, (as burned) (MMBtu per ton, barrel,orMcf) Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify S) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p,ant:7953 Evander Andrews Power Complex Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Quantity Type OfUnitsEnergy Source Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) \ 'GT NG 16,543 Mcf 1 .0000 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify "C Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as slocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please entera comment) b 16,543McfNG16,543 0 0 <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p,ant;7953 Evander Andrews Power Complex Month:JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRTME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) "07 1,009 (MWh) 910GT X Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Source Unit Code Gross Generation (MWh)Net Generation (MWh) o U.S.Department of Energy Energy Information Administration Form ApprovalEIA923PowerPlantOperationsReport 2012 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 12/31/2013 Year: Form EIA-923 Month JO SCHEDULE 9.COMMENTS Schedule Part Item Comments Contains Reservation Fee26 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plarit:55733 Bennett Mountain Month:JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION X- Survey Contact Submit By Submit Date Accept By Accept Date vibiCherylHobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise chobbs@idahopower.coni ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Bennett Mountain 55733 Plant County Elmore 1015 West Hays St. Mountain Home Plant State ID j X |NoCHP ¦i Yes For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923jX|YesRegulated No 7-,|l2t/lZ- Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p|ant:55733 Bennett Mountain Month:]() OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) (N J No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF \n.2v |321.4 £2 iVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NG 29,105 465.8I 49 1VARIOUS(NATURAL GAS SPOT I'Ultt'l 1ASES ONLY) S NG 986 252.4 X Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Natural GasCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur Content AshHeat Content Mercury Firm or Content Interrupl- Predominant Secondary ModeContentMode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 1 F PL IVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NG F PL 2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month 10 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal MineEnergy Source Coal Mine Coal Mine Name Coal Mine State Coal Mine CountyMSHAIDType (MMYY) NGVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S VARIOUS (NATURAL GAS SPOT PURCHASESONLY1 S NG v Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:1Q OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce sleam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Source Quantity Type Of SulfurAvgHeat Content, (as bumcd) (MMBPi perton, barrel,orMcf) Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify *3? Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month:JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Source -NOT Mcf30,091NO 1 .001 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify <P or Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month:10 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form, Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of CurrentMonth's Receipts Prior Month's Ending Stocks Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment)Units McfNG 30,091 30,091 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:1Q OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generatorsat steam-electric organic-fueled plants with a total steant turbine capacity of 10 megawatts and above.Report generation forall other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,gcolhcrmal,or other energy sources on SCHEDULE 5.1'ARTS IS or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month J 0 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) iYJ)1,838 (MWh) 1,776GT%\ vT Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:JQ OMBNo.1905-0129 Approval Expires 12/31/2013FonnEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Source Unit Code Gross Generation (MWh)Net Generation (MWh) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant;55733 Bennett Mountain Month 10 OMB No.1905-0129 Approval Expires 12/3 1/201 3FormEIA-923 SCHEDULE 9.COMMENTS Schedule ItemPart Comments 2 6 Contains reservation fee. <£=> Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant;55733 Bennett Mountain Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code V Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:]Q OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Contact Cheryl Hobbs QTitleJointVentureAccountant PO Box 70 Accept By Accept Date jlfel Address City/State/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Guy Colpron Title Engineering Leader P O Box 70Address City/State/Zip Email Boise gcolpron@idahopower.com ID 83707 (208)388-2784 Fax (208)388-6689Phone Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho PowerCo Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth 57028 PAYETTE Plant State ID HCHPYes No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X j YesRegulated No Hp-in- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month.JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete forAll Fuels Receipts All Fuels Cost per Unit All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF fl/ 250,186 9-fj 321.4! T 249Jj VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 465.8 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY] S NG 8,472 252.4 V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant;57028 Langley Gulch Power Plant Month JO OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Sulfur ContentHeat Content Ash Mercury Firm or Content Interrupl- Prcdominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% perunit 0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY! S NG F PL VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 1 F PL c \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p'ant:57028 Langley Gulch Power Plant Month:]Q OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Coal Mine Type If you have provided the MSHA ID number,leave these items blankCompleteforAllFuels Supplier Contract Type Contract Expiration Date Energy Source Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine CountyMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG VARIOUS (NATURAL GAS SPOT PURCHASESONLY>_ S NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p,ant:57028 Langley Gulch Power Plant Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id QuantityEnergy Source Type Of Avg Heat Content, (as burned) (MMBtu pertan, barrel,or Mcf) Sulfur Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) CA 1 OP NG 0 Mcf 0 If Energy source reported is OTH,OBS.OBG,OBL,or OG, please specify s: Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2012 plant:57028 Langley Gulch Power Plant Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check,)Was steam produced for purposes other than electric power generation duringthis reporting period? Prime Mover Type OfUnitsEnergyQuantity Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Source \ 258,658 1.U0UUCTNGMcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify c v Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:JQ OMBNo.1905-0129 Approval Expires 12/3 1/20 1 3FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that camiot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Comment (if balance is not zero please enter a comment)Balance Units MyNGMcf258,658 258,658 00 c¦\^2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:10 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fitel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation) Complete a separate row for each Generator ID (sec page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) CA STG OP C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:1Q OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.arc on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) 24,008CT25,018 % c Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:10 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source tor nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)NetGeneration (MWh)Energy Source C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:57028 Langley Gulch Power Plant Month:JQ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Contains reservation fee.2 6 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p|ant:57028 Langley Gulch Power Plant Month:]() OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code