HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 43.pdfForm ApprovalU.S.Department ofEnergy
Energy Information Administration Month.^Year.
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip
Email
Boise ID 83707
chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact
Title
Address
Randy Henderson
Operations Finance Leader
Box 70
City/State/Zip
Email
Boise
rhenderson@idahopower com
ID 83707
Phone (208)388-2290 Fax (208)388-2521
Report For
/)wX>Y,ofoi <2|44—Idaho Power CoCompanyName
Plant Name
Plant ID
Plant Address
Plant City
tEvanderAndrewsPowerComplex
7953 Plant County
1 862 N W Mt Home Hwy Dist Rd
Mountain Home Plant State ID
?s NoYesRegulated
wForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923?xYes No
CHP
[CHP Efficiency
f
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration ]yionth:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:7953 Evander Andrews Power Complex
Form EIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?Was Fuel purchased this month?Yes x No
Cost per UnitContractInformationPurchases
Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Quantity
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)
A 9?VVARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
445.7SNG57,269 382.2*
r
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year 2Q\4
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
V
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 57269 1 PL F F?Yes ?Yes
fx]No [x |No
/
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Coal Mine InformationPurchases(From Schedule 2,Part A)
Coal Mine Coal Mine
Name
Coal Mine
County
Coal Mine Coal Mine
State
QuantityPurchaseEnergy
SourceFuelSupplier MSHA ID TypeType
4
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Boiler Id Boiler Status Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Prime Mover Energy
Source
Quantity
Consumed
Ash
Content,
(coal only,to
nearest 0.1 %)
Code
Specify other fuel:
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Gross Generation Net GenerationReport
Month
Generator
(MWh)(MWh)Id
9'
Form ApprovalU.S.Department of Energy
Energy Information Administration y[om|r
Monthly EIA923 Power Plant Operations Report
9 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Energy
Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh)
\A3\\GT GTNG57,269 Mcf 1.0000 Y 5,499 5,409
Specify other fuel:
A2
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Prime
Mover
EIA USE
ONLY
Energy
Source
Units Average Heat Content EIA USE
(High Healing Value)ONLY
(Group code)
Generator Generator
Status
NetGross
Generation
Report
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 9 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Monlh.^Year,
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/
Year Stocks
Fuel Balance Comments for AdjustmentsEnergy
Source
CAB D E F G H
NO Mcf 57,269 057,269 0
0I
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity ofFuel Shipped to PlantPlantIDPlantNameFuelType
A B C D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 P'ant:7953 Evander Andrews Power Complex
OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
ItemSchedulePart
Approx $784k of trasport/reservation fees included for all 3 plants.62
Changes in Ownership (Provide name of purchaser and date sold.)
1\(
v>
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
9 Year:2014 plant:7953 Evander Andrews Power Complex
U.S.Department ofEnergy
Energy Information Administration Mont^.OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Prime Equipment
Fuel Schedule Mover ID
Purchase
Override CommentRangesErrorNumber&DescriptionSupplierRptMonthType
£/
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 p,ant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE!.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit DateContact
Title JointVenture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
chobbs@idahopower.com (208)388-5614 Fax (208)433-5180EmailPhone
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
ID 83707City/State/Zip Boise
Email rhenderson@idahopowercom Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name
Plant Name
Idaho Power Co
Bennett Mountain
Plant ID 55733
1015 West Hays St,
Plant County Elmore
,atv aPlantAddress
Plant City Mountain Home Plant State ID
o'
?X Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?DMYes No -.1CHP0
CHP Efficiency
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
??Was Fuel purchased this month?NoYes
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy
Source Liquids:Barrels
Gases:MCF
(MMYY)
%
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
?Yes ?Yes
?No ?No
*1
t
VI
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Coal Mine InformationPurchases(From Schedule 2,Part A)
Coal Mine
County
Coal Mine
Slate
Coal Mine
Type
Coal Mine
Name
Quantity Coal MinePurchaseEnergy
SourceFuelSupplier MSHA IDType
\
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Prime Mover Boiler Td Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshReport
Month Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel;
hh/
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Td (MWh)(MWh)
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh)
3 3i\i,152,816GTNG Mcf 1 .0000 GT 4,998 908f
Specify other fuel:
A(h
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
9 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Units Average Heat Content EJA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
EIA USE
ONLY
(Group code)
Energy
Source
Generator Generator
Status
Gross
Generation
Net
GenerationReport
Month
Report
Month ID
Code Code (MWh)ID (MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 plaTlt:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year.2014 Plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Units Purchases Adjustment to
Stocks
End ofMonth/
Year Stocks
Fuel BalanceEnergyPreviousMonth/
Ycar Stocks
Consumption Comments for Adjustments
Source
A B C D F G HE
NG Mcf 52,816 52,8160
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 p1ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity offuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity of Fuel Shipped to PlantPlantIDPlantNameFuelType
C DAB
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Approx $784k of trasport/reservation fees included for all 3 plants.2 6
Changes in Ownership (Provide name of purchaser and date sold.)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
9 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormELA-923
ERRORS
Prime Equipment
Fuel Schedule Mover ID
Purchase
Ranges Override CommentRptMonthSupplierErrorNumber&DescriptionType
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:9 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit DateContact
Title Joint Venture Accountant
Address PO Box 70
Cily/State/Zip
Email
Boise ID 83707
chobbs@idahopower.com Phone Fax (208)433-5180(208)388-5614
Supervisor of Contact Person for Survey
Randy HendersonContact
Title
Address
Operations Finance Leader
Box 70
City/State/Zip
Email
Boise
rhenderson@idahopower com
ID 83707
Phone Fax (208)388-2521(208)388-2290
Report For
Company Name
Plant Name
Idaho Power Co
ILangleyGulchPowerPlant
Plant County
Interstate 84 and Highway 30
New Plymouth
Yes
Plant ID 57028 PAYETTE
Plant Address
Plant City Plant State ID
*1 ?NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?sYes No
CHP
ACHPEfficiency
V v
Form ApprovalU.S.Department of Energy
Energy Information Administration Monttr
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?Was Fuel purchased this month?Yes x No
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy
Source Liquids:Barrels
Gases:MCF
(MMYY)
0/\VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S 445.7NG1,123,834 382.2V
rv/
Vy
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year.2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form E1A-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 1123834 1 PL FF?Y"?Yes
71 No 17]No
/
V/
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Coal Mine
State
Purchase Energy
Source
Quantity Coal Mine
Name
Coal Mine Coal Mine Coal Mine
County
Fuel Supplier Type MSHA ID Type
A
/
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Quantity
Consumed
Avg Heat
Content.
(High Heating Value)
(MMBlu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshPrimeMoverBoilerStatusUnitsBoilerIdEnergy
Source
E1A USE
ONLY
(Group Code)
Report
Month Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
h/
V/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity I0MW or Above
Generation
Gross Generation Net GenerationGeneratorReport
Month (MWh)td (MWh)
If
/
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 Plant;57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource(Yes/No)(MWh)Code (MWh)
Specify other fuel:
A
/
V
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Energy
Source
Quantity
Consumed
Units Average Heat Content EfA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
Net
GenerationReport
Month
Report
Month ID
(Group code)Code ID (MWh)(MWh)
15 1 0*1,7720.000
r
CT 3 167,931IICAIOPNG0McfIIGTGOP
f)f\1123834 McfCT1IGTGNG 1.000 CA STG11 OP
?
J
V/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant;57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers ofa single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Gross Generation (MWh)Prime
Mover
Energy UnitCode
(nuclear units)
Net Generation (MWh)
Source
*
v \
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 p,anF 57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B,
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Units Previous Month/
Year Stocks
Adjustment to
Stocks
End of Month/
Year Stocks
Fuel Balance Comments for AdjustmentsEnergyPurchasesConsumption
Source
A B C F G HDE
0NGMcf1,123,834 1,123,834 0
0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity of Fuel Shipped to PlantFuelTypePlantIDPlantName
C DAB
\V/
V
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:
Monthly E1A923 Power Plant Operations Report
9 Year 2014 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Approx $784k of trasport/reservation fees included for all 3 plants.62
Changes in Ownership (Provide name ol purchaser and date sold.)
V\/
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
9 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType RptMonth Supplier ErrorNumber &Description Ranges Override Comment
/
\y