HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 42.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the inslructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
Cily/Statc/Zip
Email
Boise
chobbs@idaliopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
City/State/Zip
Email
Boise ID 83707
rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
O-PReportFor
JCompanyName
Plant Name
Idaho Power Co
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Dist Rd
Mountain Home
Plant ID 7953
Plant Address
Plant City Plant State ID
-zxNo|CHP Yes
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
m YesRegulated No
^i <*nV ^
c
v<J
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month 9
Form EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0,1 cents
Gases:MCF
\181,430 ¥VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
NGS 378,3
1
e
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plarit:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality of Fuels Received Fuel Transportation
Natural Gas
Only
Coal,Pet Coke,OilAllFuels Coal Only Coal,Pet Coke and Oil
Supplier Contract Type Sulfur Content Ash PredominantContract
Expiration
Date
Energy
Source
Heat
Content
Mercury Firm or
Content Jnterrupt-
Sccondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus(MMYY)Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0 01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY;
S NG 1 F PL
<9.
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants SO megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine Coal Mine
Name
Energy
Source
Coal Mine
State
Coal Mine
CountyMSHAIDType
(MMYY)
Various (natural gas spot
PURCHASES ONLYJ
S NG
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
?(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshPrimeBoilerStatus
Mover Id
Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Units Content,
(coal only,to
nearest 0.1 %)
Source
?
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant 7953 Evander Andrews Power Complex
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu perton,
barrel,or Met)
Source
GT NG 181,430 Mcf 1.000[1
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
0NGMcf181,430 181,430 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with Jess than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,orother energy sources 011 SCHEDULE 5.PARTS B or C,
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3,Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each GeneratorID (see page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
&<p
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month:9
Form EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
6 '^l,0GT 16,591
<0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY,gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy UnitCode Gross Generation (MWh)Net Generation (MWh)
Source
<5
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule ItemPart Comments
L Approx $799k Transport/Reservation fees are included for all three plants62
<3
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant;7953 Evander Andrews Power Complex
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error Description/
Override Comment
Error
NurnTypeTypeId
Code
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl Hobbs
Joint Venture Accountant
Contact
Title
PO Box 70Address
Boise
chobbs@idahopower com
City/Statc/Zip ID 83707
EmaiI Phone Fax (208)433-5180(208)388-5614
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Box 70
Contact
Title
Address 'V'J3*
id3°City/Stale/Zip Boise ID 83707
Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
Idaho Power Co
Bennett Mountain
55733
1015 West Hays St.
Mountain Home
Company Name
Plant.Name
Plant ID Plant County Elmore
Plant Address
/Plant City Plant State ID
f)ht0CHPYesNo
/idForcontactdetailgotohttp://www.eia.doe.goV/oss/forms.html#eia-923
:iRegulatedXYes CNo
P
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
¦N 'No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Costper Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Solids:Tons
(MMYY)Liquids:Barr els Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
L
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transpoitation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Energy Heat
Content
Sulfur Content Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Blus Percent weight
to nearest
0.01%
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtusJ 0.01%
per unit 0.01%
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Coal MineEnergy
Source
Coal Mine
Type
Coal Mine
Name
Coal Mine
State
Coal Mine
CountyMSHAID
(MMYY)
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during Ihis reporting period?
Prime Boiler
Mover Id
Status Energy Quantity Sulfur AshTypeOfAvgHeat
Content,
(as bumcd)
(MMBtu per ton,
barrel,or Mcf)
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1 %)
]
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year.2013 Plant 55733 Bennett Mountain
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL '
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy
Source
Type Of Units Avg Heat
Content,
(as burned)
(MMBtuper ton,
barrel,or Mcf)
1.0000'GT NG 92,921 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that camiot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment ifthe balance does not equal zero.
Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (if balance is not zero please enter a comment)
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,arit:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B orC.
Generation reported on SCHEDULE 5,PartA corresponds to the fuel consumption reported on SCHEDULE 3.Part A,
Industrial or Commercial CTIP Plants may reportONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (sec page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
I
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
^8,383
(MWh)
p M23|GT
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation (MWh)Net Generation (MWh)Energy Unit Code
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
6 Approx S799fc Transport/Reservation fees are included for all three plants.2
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month;9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Schedule Prime
Mover
Fuel Equipment Supplier ErrorDescription/
Override Comment
Error
NuraTypeType
Code
Id
<P
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
Cily/State/Zip
Email
Boise
chobbs@idahopower.com
ID 83707
Phone Fax (208)433-5180(208)388-5614
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
76Box70Address
City/State/Zip Boise ID 83707
DEmai1rhenderson@idahopower,com (208)388-2290 Fax (208)388-2521Phone
Report For
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Company Name
Plant Name
Plant ID
Plant Address
Plant City
57028 PAYETTE
f I*Plant State ID
¦ok¦b
SCHPYes NoL For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
?Regulated X I Yes No
\°
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant 57028 Langley Gulch Power Plant
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier ContractType Contract
Expiration
Date
Quantity Commodity
Cost (coal,natural gas
Total Delivered
Cost
Energy
Source
Solids:Tons
Liquids:Barrels
Gases:MCF
(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
fb fVQ\.332.6
1 32t![
iVARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
Various (natural gas spot
I'UIU'I IASI S ONI Y)
S NG 109,161
i
383 6
hsNG 1,179,202 378.3
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information Quality ofFuels Received Fuel Transportation
Complete for All Fuels
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Sulfur ContentEnergy
Source
Heat
Content
Ash
Content
Mercury Firm or
Content fnterrapt-
Prcdominant Secondary
Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus(MMYY)Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
\
TVARIOUS(NATURAL GAS SPOT
PURCHASES ONLY;
VARIOUS (NATURAL GAS SPOT
PLIRCUASESQNLYI
S NG 1 PL
S NG 1 F PL
jr
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Coal Mine
Name
Contract Type Energy
Source
Coal Mine Coal Mine Coal Mine
State
Contract
Expiration
Date
Coal Mine
CountyMSHAIDType
(MMYY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
S NG
S NG
cA-
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check,)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
QuantityPrimeBoilerStatus
Mover Id
Energy Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Sulfur Ash
Source Units Content,
(coal only,to
nearest 0.1%)
Content,
(petroleum and
coal only,to
nearest 0.01%)
OP NOCAI 0 Mcf 0
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
(vT
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Source
\
1.0000§CT NG 1,288,363 Mcf
,
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Comment (ifbalance is not zero please enter a comment)Current Month's
Consumption
Current Month's
Ending Stocks
BalanceAdjustments
To Stocks
NG Mcf 1,288,363 1,288,363 0 0
<C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
2013 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 12/31/2013
Year:
Form EIA-923
Month:9
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B orC.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial orCommercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row foreach Generator ID (sec page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
0CASTGOP0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month 9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Gross Generation NetGenerationPrime
Mover (MWh)
\^J 181,557
(MWh)
\^J 178,191CT
*
5T
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Gross Genciation (MWh)Net Generation (MWh)Prime
Mover
Unil CodeEnergy
Source
c
c?
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Pari hem Comments
Approx $799k Trunsport'Rcscrviition fees are included for all three plants.62
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month:9
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
SchedulePurchase Prime
Mover
Equipment Supplier Error Description/
Override Comment
Fuel Error
NumIdTypeType
Code
c