Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 42.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the inslructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address Cily/Statc/Zip Email Boise chobbs@idaliopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone O-PReportFor JCompanyName Plant Name Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home Plant ID 7953 Plant Address Plant City Plant State ID -zxNo|CHP Yes For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 m YesRegulated No ^i <*nV ^ c v<J Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month 9 Form EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0,1 cents Gases:MCF \181,430 ¥VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NGS 378,3 1 e Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plarit:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural Gas Only Coal,Pet Coke,OilAllFuels Coal Only Coal,Pet Coke and Oil Supplier Contract Type Sulfur Content Ash PredominantContract Expiration Date Energy Source Heat Content Mercury Firm or Content Jnterrupt- Sccondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0 01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY; S NG 1 F PL <9. Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Energy Source Coal Mine State Coal Mine CountyMSHAIDType (MMYY) Various (natural gas spot PURCHASES ONLYJ S NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s ?(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshPrimeBoilerStatus Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Units Content, (coal only,to nearest 0.1 %) Source ? If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant 7953 Evander Andrews Power Complex Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu perton, barrel,or Met) Source GT NG 181,430 Mcf 1.000[1 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) 0NGMcf181,430 181,430 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with Jess than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,orother energy sources 011 SCHEDULE 5.PARTS B or C, Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3,Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each GeneratorID (see page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) &<p Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month:9 Form EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) 6 '^l,0GT 16,591 <0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY,gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy UnitCode Gross Generation (MWh)Net Generation (MWh) Source <5 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule ItemPart Comments L Approx $799k Transport/Reservation fees are included for all three plants62 <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;7953 Evander Andrews Power Complex Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NurnTypeTypeId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl Hobbs Joint Venture Accountant Contact Title PO Box 70Address Boise chobbs@idahopower com City/Statc/Zip ID 83707 EmaiI Phone Fax (208)433-5180(208)388-5614 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Box 70 Contact Title Address 'V'J3* id3°City/Stale/Zip Boise ID 83707 Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Bennett Mountain 55733 1015 West Hays St. Mountain Home Company Name Plant.Name Plant ID Plant County Elmore Plant Address /Plant City Plant State ID f)ht0CHPYesNo /idForcontactdetailgotohttp://www.eia.doe.goV/oss/forms.html#eia-923 :iRegulatedXYes CNo P Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) ¦N 'No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Costper Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barr els Cents per MMBtu,to the nearest 0.1 cents Gases:MCF L Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transpoitation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Heat Content Sulfur Content Ash Mercury Firm or Content Interrupt- Predominant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Blus Percent weight to nearest 0.01% Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtusJ 0.01% per unit 0.01% Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal MineEnergy Source Coal Mine Type Coal Mine Name Coal Mine State Coal Mine CountyMSHAID (MMYY) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during Ihis reporting period? Prime Boiler Mover Id Status Energy Quantity Sulfur AshTypeOfAvgHeat Content, (as bumcd) (MMBtu per ton, barrel,or Mcf) Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) ] If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2013 Plant 55733 Bennett Mountain Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL ' Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtuper ton, barrel,or Mcf) 1.0000'GT NG 92,921 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that camiot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,arit:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B orC. Generation reported on SCHEDULE 5,PartA corresponds to the fuel consumption reported on SCHEDULE 3.Part A, Industrial or Commercial CTIP Plants may reportONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) I Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) ^8,383 (MWh) p M23|GT Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation (MWh)Net Generation (MWh)Energy Unit Code Source Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 6 Approx S799fc Transport/Reservation fees are included for all three plants.2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month;9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Schedule Prime Mover Fuel Equipment Supplier ErrorDescription/ Override Comment Error NuraTypeType Code Id <P Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address Cily/State/Zip Email Boise chobbs@idahopower.com ID 83707 Phone Fax (208)433-5180(208)388-5614 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title 76Box70Address City/State/Zip Boise ID 83707 DEmai1rhenderson@idahopower,com (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Company Name Plant Name Plant ID Plant Address Plant City 57028 PAYETTE f I*Plant State ID ¦ok¦b SCHPYes NoL For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 ?Regulated X I Yes No \° Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant 57028 Langley Gulch Power Plant Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier ContractType Contract Expiration Date Quantity Commodity Cost (coal,natural gas Total Delivered Cost Energy Source Solids:Tons Liquids:Barrels Gases:MCF (MMYY)Cents per MMBtu,to the nearest 0.1 cents fb fVQ\.332.6 1 32t![ iVARIOUS (NATURAL GAS SPOT PURCHASES ONLY) Various (natural gas spot I'UIU'I IASI S ONI Y) S NG 109,161 i 383 6 hsNG 1,179,202 378.3 C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Quality ofFuels Received Fuel Transportation Complete for All Fuels Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Sulfur ContentEnergy Source Heat Content Ash Content Mercury Firm or Content fnterrapt- Prcdominant Secondary Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% \ TVARIOUS(NATURAL GAS SPOT PURCHASES ONLY; VARIOUS (NATURAL GAS SPOT PLIRCUASESQNLYI S NG 1 PL S NG 1 F PL jr c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Name Contract Type Energy Source Coal Mine Coal Mine Coal Mine State Contract Expiration Date Coal Mine CountyMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG S NG cA- Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check,)Did any boiler produce steam for purposes other than electric power generation during this reporting period? QuantityPrimeBoilerStatus Mover Id Energy Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Source Units Content, (coal only,to nearest 0.1%) Content, (petroleum and coal only,to nearest 0.01%) OP NOCAI 0 Mcf 0 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify (vT Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Source \ 1.0000§CT NG 1,288,363 Mcf , If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Comment (ifbalance is not zero please enter a comment)Current Month's Consumption Current Month's Ending Stocks BalanceAdjustments To Stocks NG Mcf 1,288,363 1,288,363 0 0 <C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report 2013 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 12/31/2013 Year: Form EIA-923 Month:9 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B orC. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial orCommercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row foreach Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) 0CASTGOP0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month 9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Gross Generation NetGenerationPrime Mover (MWh) \^J 181,557 (MWh) \^J 178,191CT * 5T Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Gross Genciation (MWh)Net Generation (MWh)Prime Mover Unil CodeEnergy Source c c? Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Pari hem Comments Approx $799k Trunsport'Rcscrviition fees are included for all three plants.62 c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month:9 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors SchedulePurchase Prime Mover Equipment Supplier Error Description/ Override Comment Fuel Error NumIdTypeType Code c