HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 40.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact
Title
Address
Cheryl Hobbs Submit Date
Joint Venture Accountant
PO Box 70
City/Slatc/Zip
Email
Boise
chobbs@idahopowcr.com
ID 83707
(208)388-5614Phone Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Box 70Address
City/Statc/Zip
Email
Boise
rhcndcrson@idahopower.com
ID 83707
(208)388-2290Phone Fax (208)388-2521
Report For
Company Name
Plant Name
Plant ID
Plant Address
Idaho Power Co
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Dist Rd
Mountain Home
u 0)\
7953
Wt.
Plant City Plant State ID
(3/7/*Yes ?NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.htnil#eia-923?x NoYes
CHP
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year.2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Contract Information Cost per UnitPurchases
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons
Liquids:Barrels
Gases:MCF
Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy
SourceTypeor
Tolling
Agreement (MMYY)
,-F»P(VARIOUS (NATURAL GAS SPOT PURCHASES
"NLY)
(VARIOUS (NATURAL GAS SPOT PURCHASES
NLY)
NO 9,405 206.3 203.3
f 1/29L4y495,118NO 254.7P1«
<D
V
V3
Form ApprovalU.S.Department of Energy
Energy Information Administration Momh.^Year 2016
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnct Content Unavailable Content
Chloride Content Contract Information
PredominantAverageHeatSulfurContent
Content
Ash Content Secondary Supply Delivery
Contract Contract
Type Type
Chloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBlus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
\NG ^9405VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
I PL F F?Yes ?Yes
[71 No [7]No
ANG 4951 18 PL F FCDYes?Yes
[7]No [71 No
<D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Quantity Coal Mine Coal Mine
State
Coal Mine
Type
Energy
Source
Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID
<9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month'
Monthly E1A923 Power Plant Operations Report
8 Year:2016 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Namcplate Capacity 10MW or Above
Fuel Consumption
Prime Mover Boiler Id Quantity
Consumed
E1A USE
ONLY
(Group Code)
Report
Month
Boiler Status Energy Units Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Ash
Content,
(coal only,to
nearest 0.1 %)
Code Source
Specify other fuel:
o
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month'
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Gross GenerationReport
Month
Generator Net Generation
Id (MWh)(MWh)
<3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
g Year:2016 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity ConsumedEnergy Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit
(Yes/No)
Gross Generation Net GenerationSourceCode(MWh)(MWh)
\1.0000 j |%4_!^ GT NG 504,523 Mcf GT Y 48,41 1
Specify other fuel:
o
s-
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^year.
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Energy
Source
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
C9
6c
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A CB D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
I
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year:2016
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Previous Month/
Year Stocks
Energy Purchases Consumption Adjustment to
Stocks
End ofMonth/Fuel Balance Comments for Adjustments
Source Year Stocks
A B C D E F G H
McfNG 504,523 504,523 0 0
o
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year 2016
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity of Fuel Shipped to PlantPlantIDPlantNameFuelType
B CA D
o
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Mcm^.
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
6 Approx $805k of transport/reservation costs included.2
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year:2016
Form EIA-923
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017
ERRORS
Prime Equipment
Type Fuel Schedule Mover
Purchase
Supplier Error Number &Description Ranges Override CommentRptMonthID
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title
Address
Joint Venture Accountant
PO Box 70
City/Slatc/Zip
Email
Boise
chobbs@idahopowcr.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy HendersonContact
Operations Finance LeaderTitle
Address Box 70
City/Statc/Zip
Email
Boise
rhcndcrson@idahopowcr.com
ID 83707
U(208)388-2290 Fax (208)388-2521Phone
|pu
Report For
Company Name
Plant Name
Idaho Power Co
Bennett Mountain
QYf-^Plant ID 55733 Plant County Elmore
Plant Address 1015 West Hays St.
Plant City Mountain Home Plant State ID
?Yes NoLXJRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#cia-923?Yes X No
CHP
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids;Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeor
Tolling
Source Gases:MCF
(MMYY)Agreement
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Quality of Fuels ReceivedContractInformation Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Conlncl Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
PredominantAshContent Secondary Supply Delivery
Contract Contract
Type Type
Chloride Mode ModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBlus)
per unit
Percent weight
lo nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Purchase Energy
Type Source
Fuel Supplier 0.01%
0.01%
n Yes I I Yes
?No ?No
L
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy Quantity
Source
Coal Mine Coal Mine
State
Coal Mine
Type
Coal Mine
Name
Coal Mine
CountyFuelSupplierTypeMSHAID
C
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.0 1 %)
Ash
Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration M0nt|,.
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh)
K $&{GT NG 301,500 Mcf 1 .0000 GT Y 28,868 28,775
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Month'
Monthly EIA923 Power Plant Operations Report
8 Year.2016 plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Energy Quantity
Consumed
Units Average Heat Content EIA USE
(High Healing Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
MonthSource ID Generation
(Group code)Code ID Code (MWh)(MWh)
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain
OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (M Wh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Monlh.
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/
Year Stocks
Fuel Balance Comments for Adjustments
Source
A B C D E F G II
\
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly E1A923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant
A B C D
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
Form ApprovalU.S.Department of Energy
Energy Information Administration Montir
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover Rpt Month Supplier Error Number &Description Ranges Override CommentID
^5^
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 Plant:57028 Langley Gulch Power Plant
OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit DateCherylHobbsContact
Joint Venture AccountantTitle
Address PO Box 70
ID 83707City/Statc/Zip Boise
Phone (208)388-5614 Fax (208)433-5180Emailchobbs@idahopower.com
Supervisor of Contact Person for Survey
Randy HendersonContact
Operations Finance LeaderTitle
Address Box 70
ID 83707City/Statc/Zip Boise
rhcndcrson@idahopowcr.com Fax (208)388-2521Phone(208)388-2290Email
Report For J.
Idaho PowerCoCompanyName
Plant Name
<jJOr»Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID PAYETTE57028
Plant Address
CAPlantStatePlantCityID
?NoYesRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923iYesu:i?No
CHP
V
Form ApprovalU.S.Department of Energy
Energy Information Administration month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeor
Tolling
Source Gases:MCF
Agreement (MMYY)
m.%\25,975VARIOUS(NATURAL GAS SPOT PURCHASES
iNLY)
Q 21)6.3 f 03.3SNGv
ftp 234.8134,882ARIOUS(NATURAL GAS SPOT PURCHASES
NLY)
S NG 268.7
:
I 254.7'J/291.4 ('ARIOUS (NATURAL GAS SPOT PURCHASES
INLY)
S NG 1,332,643
9 <?
c
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Quality of Fuels ReceivedContractInformation Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChlorideModeModeUnavailablePercentweight
to nearest
Type Type
Mode used to
transport fuel
over the
second longest
distance
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
s
I 1VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 25975 PL FEYesIIYes
71 No 171 No
\
i rwNG34882tSPL IIIYesIIYes
71 No 7]No
\F /S NG 1332643 t PL F?Yes I I Yes
E No 71 No
A
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant
OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy Quantity
Source
Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
CountyFuelSupplierTypeMSHAIDType
C-
Form ApprovalU.S.Department of Energy
Energy Information Administration Mont(v
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Prime Mover Boiler Id Boiler Status Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshE1AUSE
ONLY
(Group Code)
Report
Month
Energy
Code Source Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
c
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month'
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant
OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Gross Generation Net GenerationGenerator
Id (MWh)(MWh)
C V
Form ApprovalU.S.Department of Energy
Energy Information Administration Montir
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant
OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
GenerationFuelConsumption
Prime
Mover
Quantity Consumed Type Of UnitsEnergy Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh)
I
Specify other fuel:
C \
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant 57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Gcncralion Slatus
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Energy
Source
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(MWh)
202,182
(Group code)Code ID Code (MWh)
\o1y iw.345-i CA OP NG 0 Met 0.000 CT GTG OP
t\i CT NG1GTGOP 1393500 Mcf 1.000 I I CA STG OP 0 0
c \
Form ApprovalU.S.Department of Energy
Energy Information Administration Mcmttv
Monthly EIA923 Power Plant Operations Report
8 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Energy Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)
Source
c
\^2
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly E1A923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Previous Month/
Year Stocks
Energy Purchases Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for Adjustments
Source Year Stocks
tiA C D It F G H
NG Mcf 1,393,500 1,393,500 0 0
<
CT
Form ApprovalU.S.Department of Energy
Energy Information Administration Mo,^.
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Approx $805k of transport/reservation costs included.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name ofpurchaser and date sold.)
Generator Id Comments
<7
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Prime Equipment
Fuel Schedule Mover ID Rpt Month
Purchase
Type RangesSupplierErrorNumber&Description Override Comment