HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 39.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title JointVenture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
Email chobbs@idahopower,com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
City/State/Zip Boise ID 83707
Email rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521
Report For
Idaho Power CoCompanyName
Plant Name Evander Andrews Power Complex
Plant ID Plant County
1862 NW Mt Home Hwy Dist Rd
7953
Plant Address
Plant City Mountain Home Plant State ID
s Yes ?NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.htmI#eia-923Dv"DO No
CHP
19'
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel SupplierName Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeor
Tolling
Source Gases:MCF
Agreement (MMYY)
1/VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)2A0.2SNG_^75,264
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:g Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contriet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChloride
Unavailable Mode Mode
Percent weight
to nearest
Type Type
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
\
F /—<T752MVARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG PL FIIYesIIYes
[xl No [x]No
9'
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.g Year 2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Coal Mine InformationPurchases(From Schedule 2,Part A)
Coal Mine Coal Mine
County
Quantity Coal Mine Coal Mine
State
Coal Mine
Name
Purchase EnergyFuelSupplier
MSHA ID TypeTypeSource
S)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month g Year.2015 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EtA USE
ONLY
(Group Code)
Prime Mover Boiler Id Boiler StatusReport
Month
Energy Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0 01%)
AshCodeSourceContent,
(coal only,to
nearest 0.1%)
Specify other fuel
b
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
s Year:2015 P'ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Net GenerationGrossGenerationGeneratorReport
Month (MWh)(MWh)Id
h
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity Consumed Type OfUnitsEnergy Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (MWli)(Yes/No)(MWh)
v\|\_/7.U<.4 «%
GT NG Mcf 1 .0000 GT «*"""64,369 64,245
Specify other fuel:
^A
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year;
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Energy Quantity
Consumed
Prime
Mover
Generator Generator
Status
Gross
Generation
Net
Generation
Report
Month
Report
Month
Source ID
(Group code)Code ID Code (MWh)(MWh)
Hr\}\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A CB D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column G:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption End ofMonth/
Year Stocks
Adjustment to
Slocks
Fuel Balance Comments for AdjustmentsSource
A B C D E F HG
\NG ^75.2(>4Mcf ^"675,264 0 0
0J9
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:g Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant
A B C D
u
9
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
PartSchedule Item
Approx 810k oftransport revervation for all three plants.62
Generator Retirement Dates
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Retirement
Month
CommentsGeneratorId
V<\
9
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Mon[h;
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
ERRORS
Prime Equipment
Type Fuel Schedule Mover
Purchase
Ranges Override CommentSupplierErrorNumber&DescriptionRptMonthID
V9/
U.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Year:2015 p|ant 7953 Evandcr Andrews Power Complex
Form Approval
Month:g OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
4
J(1\
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
City/State/Zip Boise ID 83707
Email rhenderson@idaliopower com Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name
Plant Name
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
Plant City Plant State ID
s ?Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?sYes No
CHP
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy
Source Liquids:BarrelsTypeor
Tolling Gases:MCF
Agreement (MMYY)
1 2?VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)-i
S NG •—1,169,866 -?'>2 0 —260.2
\_232.2K2 53.1SNG1^e ?
.2I
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year.2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercuiy Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChloride
Unavailable Mode Mode
Percent weight
to nearest
Type TypeMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
\
¥FVARIOUS
(NATURAL
GAS SPOT
S NG 1 69866 PLIIYesIIYes
[71 No [71 NoPURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG _^_2.12282 PL I IIIYesIIYes
[x |No [7|No
-3L
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy Quantity
Source
Coal Mine
MSHA ID
Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier Type Type
v
L
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form ElA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0 01%)
Ash
Content,
(coal only,to
nearest 0.1 %)
Code
Specify other fuel:
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
8 Year:2015 plant:57028 Langley Gulch Power Plant
U.S.Department of Energy
Energy Information Administration Month OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOTLER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
NetGenerationGrossGenerationGeneratorReport
Month (MWh)(MWh)Id
L/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
Specify other fuel:
-7
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Quantity
Consumed
Energy Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month
Source ID Generation
%(MWh)(Group code)Code ID Code (MWh)
\3\I CA I NGOP 0 Met'0.000 1 CT GTG OP •204,154 t 200,346
1NGfI1CTGTGOP —+402148 Mcf 11.000 1 CA STG OP 0
5
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A CB D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
1
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Previous Month/
Year Stocks
Energy Purchases Consumption Adjustment to
Stocks
End of Month/
Year Stocks
Fuel Balance Comments for Adjustments
Source
A B C D GEF H
\NG Mcf —"1,402,148 <1,402,148 0 0
\0/L
Form ApprovalU.S.Department of Energy
Energy Information Administration Mont|r
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant 57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero ifno shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Quantity of Fuel Shipped to PlantPlantNameFuelType
A B C D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly E1A923 Power Plant Operations Report
8 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Approx 8 1 Ok of transport revervation for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
\l
U
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover Rpt MonthID Supplier Error Number &Description Ranges Override Comment
i3i/
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
3
M
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
Cily/State/Zip Boise ID 83707
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
City/State/Zip Boise
rhenderson@idahopower.com
ID 83707
Email Phone (208)388-2290 (208)388-2521Fax
Report For
Company Name
Plant Name
Idaho Power Co
Bennett Mountain
Plant ID 55733 Plant County Elmore
Plant Address
Plant City
1015 West Hays St.
Mountain Home Plant State ID
*?Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?xYes No
CHP
IG'
Form ApprovalU.S.Department of Energy
Energy Information Administration Mollth:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Purchases Cost per llnitContractInformation
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeor
Tolling
Source Gases:MCF
(MMYY)Agreement
$
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
?Yes ?Yes
?No ?No
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Motlth.
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p)ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Coal Mine
State
Purchase Energy Quantity Coal Mine Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier Type Source MSHA1D Type
ft
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Prime Mover Boiler Id Boiler StatusReport
Month
Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Ash
Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
b
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
Month g Year:2015 plant;55733 Bennett Mountain
U.S.Department of Energy
Energy Information Administration OMB No.1905-0129
Approval Expires 05/3 1/20 1 7FormEIA-923
BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTSFUELCONSUMPTIONANDGENERATION
SCHEDULE 3.PART A.
Generators with Nameplate Capacity 10MW or Above
Generation
Net GenerationGrossGenerationGeneratorReport
Month (MWh)(MWh)Id
b<b
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Mon[h.
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED ATR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSourceCode(Yes/No)(MWh)(MWh)
i\\QNGGT ^403,842 Mcf 1.0000 GT Y ^39,471
A
Specify other fuel:
A
<b
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 plant:55733 Bennett Mountain OMR No.1905-0129
Approval Expires 05/3 1/20 1 7FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or AbovFuelConsumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Code
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Energy Quantity
Consumed
Prime
Mover
Generator Generator
Status
Gross
Generation
Net
Generation
Report
Month
Report
Month
Source ID(Group code)ID Code (MWh)(MWh)
i
Form ApprovalU.S.Department of Energy
Energy Information Administration tv)onth;
Monthly EIA923 Power Plant Operations Report
8 Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
C EABD
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
&
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units ConsumptionPreviousMonth/
Year Stocks
Purchases Adjustment to
Stocks
End ofMonth/Fuel Balance Comments for AdjustmentsSourceYearStocks
A CB ED F G H
A JK)3,842NGMcf 0 403,842
,\b
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 platlt:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Quantity ofFuel Shipped to PlantFuelType
A B C D
f
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
8 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Approx 810k oftransport revervation for all three plants.62
Generator Retirement Dates
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Retirement CommentsGeneratorId
Month
0/,\
9
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
Month:g Year:2015 plant:55733 Bennett Mountain
U.S.Department of Energy
Energy Information Administration OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Prime Equipment
Type Fuel Schedule Mover Override CommentRanges
Purchase
Error Number &DescriptionSupplierRptMonthID
$
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
8 Year:2015 Plant:55733 Bennett Mountain
Form Approval
Month:
Form EIA-923
OMB No.1905-0129
Approval Expires 05/31/2017
3
0