Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 38.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 8^Year:2014"^plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 Cily/State/Zip Boise ID 83707 Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Address Operations Finance Leader Box 70 City/State/Zip Boise rhenderson@idahopower,com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Idaho Power Co Evander Andrews Power Complex Plant County 1 862 NW Mt Home Hwy Dist Rd Mountain Home o M r >Plant ID cr 7953 Plant Address Plant City Plant Slate ID *1 ?Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Yes NoCHP CHP Efficiency Lt-I (Vn Ao<"9 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ??Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source Liquids:Barrels Gases:MCF (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NG 148,801 431.4S 381.1? f f V 1 <0 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality ofFuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Contenl Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract ContractChloride Unavailable Mode Mode Percent weight to nearest Type TypeMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% s/ VARIOUS (NATURAL GAS SPOT PURCHASES |ONLY) S NG 148801 I PL FIIYes?Yes [71 No [~7 No !) Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 Year:2014 p,ant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormE1A-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Coal Mine County Quantity Coal Mine Coal Mine State Coal Mine Coal Mine Name Purchase Energy SourceFuelSupplierType MSHA ID Type A Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year.2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,ofassociated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Prime Mover Boiler Id Quanlity Consumed Report Month Boiler Status Energy Source Units Avg Heat Content. (High Healing Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) Ash Code Content, (coal only,to nearest 0.1 %) Specify other fuel: I \)/j Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month g Year:2014 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power ComplexFormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Gross Generation Net GenerationReport Month Generator (MWh)(MWh)Id t ~<3 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year 2014 7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED ATR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Quantity Consumed Type OfUnitsPrime Mover Energy Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSource (MWh)Code (Yes/No)(MWh) /3 :V-13,894MS,801 McfNG 1 .0000 GTGT Y 13,987w 1 Specify other fuel: Yr • Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 8 Year.2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov GenerationFuelConsumption Prime Mover Prime Boiler/Boiler Mover Generation Status Quantity Consumed Units Average Heat Content EIAUSE (High HeatingValue)ONLY (Group code) Generator Generator Status Gross Generation NetEnergy Source EIA USE ONLY Report Month Report Month GenerationID (MWh)(MWh)Code(Group code)Code ID *S) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source "0 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/File)Balance Comments for Adjustments Source Year Stocks A B C D E F G H NG Mcf 148,SOI 1/148,801 0 0 9' Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 Year:2014 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity ofFuel Shipped to PlantPlantNameFuelTypePlantID C DBA \) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month.^Year:2014 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) ItemSchedulePart Approx $820k of transport/reservation fees included for all 3 plants.62 Changes in Ownership (Provide name ofpurchaser and date sold.) VA9 U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Form Approval Month:g OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment 3 <0 U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Year 2014 Plant:7953 Evander Andrews Power Complex Form Approval Monlh:£OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 ' v\ ^V V Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 "'Year:2014 plant 55733 Bennett Mountain i/OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit DateCherylHobbsContact Title Joint Venture Accountant Address PO Box 70 Cily/State/Zip Boise ID 83707 chobbs@idahopower.com Phone Fax (208)433-5180Email(208)388-56)4 Supervisor of Contact Person for Survey Randy HendersonContact Operations Finance LeaderTitle Address Box 70 City/State/Zip Boise ID 83707 rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521Email Report For Idaho Power CoCompanyName Plant Name A»v<)Bennett Mountain //?Plant County ElmorePlantID55733 Plant Address Plant City 1015 West Hays St. Mountain Home Plant State ID *?NoYesRegulated For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923*1?Yes NoCHP CHP Efficiency T*'\A /& Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:8 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ?sWasFuelpurchasedthismonth?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source (MMYY) % % Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChloride Unavailable Mode Mode Percent weight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% ?Yes I I Yes ?No ?No 20 Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine fnformation Quantity Coal Mine Coal Mine State Coal Mine Type Purchase Energy Source Coal Mine Name Coal Mine County Fuel Supplier MSHA IDType (C o- Form ApprovalU.S.Department ofEnergy Energy Infonnation Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyoti are an annual respondent with a generator nameplatc capaeily of I0MW or above,report an individual Schedule 3,Pari A for each month in the reporting year/.Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,ofassociated boilers andgeneratorsatthisplant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption Boiler IdEIAUSE ONLY (Group Code) Report Month Prime Mover Boiler Status Quantity Consumed Energy Source Units Avg Heat Content. (High Healing Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshCodeContent, (coal only,to nearest 0,1%) Specify other fuel: , 7V Form ApprovalU.S.Department of Energy Energy Information Administration Monlh: Monthly EIA923 Power Plant Operations Report 8 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Gross Generation NetGenerationReport Month Generator Id (MWh)(MWh) if Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:Year.2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heal Content, (as burned) (MMBtuperton, barrel,or Met) Peaking UnitPrimeMover Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) ?-firGTNG99,592 1 .0000 I GT 9,363Mcf 9,270? Specify other fuel: Form ApprovalU.S.Department of Energy Energy Information Administration Monlh. Monthly EIA923 Power Plant Operations Report 8 Year:2014 plarit:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY (Group code) Quantity Consumed Energy Source Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation Code ID (MWh)Code (MWh) $9 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:g Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source (A v Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 8 Year:2014 p|ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End ofMonth/ Year Stocks Energy Fuel Balance Comments for Adjustments Source A B C D E G HF 5^99,592 yNGMcf 99,5920 Pa V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month 8 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017 Form E1A-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity offuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D A% Form ApprovalU.S.Department of Energy Energy Information Administration Month; Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approx $820k oftransport/reservation fees included for all 3 plants.62 Changes in Ownership (Provide name ofpurchaser and date sold.) V I Form ApprovalMonthlyEIA923PowerPlantOperationsReport 8 Year:2014 plant:55733 Bennett Mountain U.S.Department of Energy Energy Information Administration Month:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Prime Equipment Fuel Schedule Mover ID Purchase Override CommentRangesErrorNumber&DescriptionSupplierRptMonthType '?• yj U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 Plant:55733 Bennett Mountain Form Approval Month:OMB No,1905-0129 Approval Expires 05/31/2017FormEIA-923 3 rfas? Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8^Year:2014^plant:57028 Langley Gulch Power Plant i/OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,lictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Title Address Cheryl Hobbs Submit Date Joint Venture Accountant PO Box 70 City/State/Zip Email Boise chobbs(gjidahopower,com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Email Boise ID 83707 rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521 ~b VReportFor yCompanyName Plant Name Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth C V jPlantID Plant Address 57028 PAYETTE Plant City Plant State ID .*1 ?NoYesRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?m NoYes CHP CHP Efficiency 1-J' A V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ?EWasFuelpurchasedthismonth?Yes No Contract Information Purchases Cost per Unit Total Delivered Cost Commodity Cost (coal,natural gas) Quantity Solids:Tons Cents perMMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date (MMYY) Energy Liquids:BarrelsSourceGases;MCF /\41,381,700 5 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 431.4 381 1SNG fl V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Ash Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Predominant Secondary Mode Chloride ModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel overthe longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% yXV \VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NG 1381700S I PL F?Yes I I Yes fxl No [71 No a ) Form ApprovalU.S.Department of Energy Energy Information Administration Mon,h. Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Energy Quantity Source Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County PurchaseFuelSupplier MSHA IDType Type 4 V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 8 Year.2014 Plant 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 1 0MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,ofassociated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) EIA USE ONLY (Group Code) Prime Mover BoilerId Boiler Status Energy Source Quantity Consumed AshReport Month Code Content, (coal only,to nearest 0.1%) Specify other fuel; h v Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 8 Year:2014 plar>t:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Gross Generation Net GenerationReport Month Generator (MWh)(MWh)Id V' V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Quantity Consumed Type OfUnits A.vg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net GenerationSource Code (Yes/No)(MWh)(MWh) Specify other fuel: V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Units Average Heat Content EIA USE (High Healing Value)ONLY (Group code) Energy Source Quantity Consumed Prime Mover Generator Generator Status Gross Generation Net Generation Report Month Report Month ID (Group code)Code ID ©IWj h) rl99,833CAIOPI1NG0Met"0.000 I GTG OP 203,707 ?XYSTGI1GTG1381700Mcf1.000 I ING CA OP f-i ,3> V Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers ofa single type,in MWIi -Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Energy Net Generation (MWh) Source *V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT TIIE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Units Previous Month/ Year Stocks PurchasesEnergy Consumption Adjustment to Stocks End ofMonth/ Year Stocks Fuel Balance Comments for AdjustmentsSource A B C D E F G H 1,381,700 1,381,700McfNG 00 0I/ (/ Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity of Fuel Shipped to PlantPlantNameFuelTypePlantID C DAB /\\ 1/ Form Approval OMB No.1905-0129 Approval Expires 05/3 1/2017 U.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 8 Year:2014 plant:57028 Langley Gulch Power PlantFormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approx $820k oftransport/reservation fees included for all 3 plants.62 Changes in Ownership (Provide name of purchaser and date sold.) V Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 p,anF 57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier Error Number&Description Ranges Override Comment / V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 8 Year:2014 Plant:57028 Laiigley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 3 :A V