HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 37.pdfForm ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:8
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Contact Cheryl Hobbs
Title Joint Venture Accountant
PO Box 70Address
City/S Late/Zip Boise ID 83707
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
Box 70Address
City/State/Zip Boise ID 83707
VEmailrhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
Company Name
Plant Name
Plant ID
Idaho Power Co
Evander Andrews Power Complex
Plant County a$7953
Planl Address
Plant City
1862 NW Mt Home Hwy Dist Rd
NMountainHomePlantStateID
\f>CHI1 X NoYes
O\d c«V>For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
c>
Regulated X Yes No
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant;7953 Evander Andrews Power Complex
Month:
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
Liquids:Barrels
Gases:MCF
(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
\V2t\Various (natural gas spot
PURCHASES ONLY)
VARIOUS (NATURAL GAS SPOT
PUIU HASPS ONI Y)
S NG 432,963 361 9 316V
i J377.1SNG14,026 374 1
&
Form ApprovalU,S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month g
Plant:7953 Evander Andrews Power ComplexFormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Sulfur ContentEnergy
Source
Heat
Content
Ash Mercury Firm or
Content Interrupt-
Prcdominanl Secondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Blus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLYj
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
S NG I F PL
S NG I F PL
o
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month g
OMB No.1905-0129
Approval Expires 1 2/3 1/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For iossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Typo
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contiacl
Expiration
Date
Energy
Source
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountyMSHAIDType
(MMYY)
VARIOUS (NATURAL GAS SPOT
ll'URCHAStiS ONLY)
VARIOUS (NATURAL GAS SPOT
1'UUt'l IASIS ONLY)
S NG
S NG
O
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:8
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for FTRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy
Source
Quantity Type Of Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Ash
Content,
(coal only,to
nearest 0.1 %)
Units
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
o
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month g
Form EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled sleam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(If applicable,please check.)Was sleam produced for purposes oilier than electric power generation during this reporting period?
Prime
Mover
Quantity Type OfUnitsEnergy
Source
Avg Heal
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
\
8 ""GT 446,989NG Mcf 1.1)0
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:7953 Evander Andrews Power Complex
Month
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Oi"
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Slocks
Balance Comment (if balance is not zero please enter a comment)
\446,989 /?NG Met 446,989 0 0
'f
<2
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY fur generators at steam-electric organic-dueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation forall oiliertypes.ofprimemovers (combustion
turbines.JC engines,wind,or hydro electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,gcotheriuul,or oilier energy sources on SCHEDULE 5,PARTS II orC
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (sec page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
<d
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormElA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
^45,166
(MWh)
\3 45,0ll]GT
I<?
<0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month 8
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combmed-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy
Source
Unit Code Gross Generation (MWh)Net Generation (MWh)
c
<D
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant;7953 Evander Andrews Power Complex
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
ySchedulePartItemComments
I26Approx$830k Transport/Reservation fees are included for all three plants
<0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plar|t:7953 Evander Andrews Power Complex
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
CD
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:55733 Bennett Mountain
Month 8
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Cheryl HobbsContact
Title Joint Venture Accountant
Accept By
Accept Date
PO Box 70Address
City/State/Zip
Email
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
2Box70Address
V'/JCity/Stale/Zip
Email
Boise ID 83707
/MiAIrhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone ;/\£Report For
&£Company Name
Plant Name
Plant ID
Plant Address
Plant City
Idaho Power Co f
Bennett Mountain fT^s55733PlantCountyElmore U'
2 12-'(01015WestHaysSt.
11*Mountain Home Plant State ID
iYes
X I Yes
CHP X No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
jN j No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Solids:Tons
Liquids:Barrels
Gases:MCF
(MMYY)Cents per MMBtu,to
the nearest
0,1 cents
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Heat
Content
Sulfur Content AshEnergy
Source
Mercury Firm or
Content Interrupt-
Predominant Secondary
Content Mode Mode
Pelcent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Blus
(MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
Iransport fuel
over the
second longest
distance
0.01%
0.01%0.01%
VP
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Coal MineContract
Expiration
Date
Energy Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
-A
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 P'ant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes olher than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy
Source
Quantity Type Of Sulfur AshAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1 %)
If Energy source rcpoitcd is OTH,OBS,OBG,OBL,or OG,
please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Source
\J.OOOtjGTNG212,263 Mcf%
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oilJet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
PriorMonth's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Comment (if balance is not zero please enter a comment)Balance
[
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 1 0 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,JC engines,wind,or hydro-clcclric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled bynuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
Prime
Mover
Generator Gross GenerationGenerator
Status
Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
21.161,GT 21,261
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:55733 Bennett Mountain
Month:8
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy Unit Code Gross Generation (MWh)Net Generation (MWh)
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error Description/
Override Comment
Error
NumIdTypeType
Code
<¦
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U .S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:57028 Langley Gulch Power PlantFormE1A-923
Month
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Cheryl HobbsContact
Title Joint Venture Accountant
Accept By
Accept Date
PO Box 70Address
Cily/Statc/Zip Boise
chobbs(§^idahopower,com
ID 83707
Email Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
2City/Stale/Zip
Entail
Boise
rhenderson(g!idahopowei',com
ID 83707
(208)388-2290 Fax (208)388-2521Phone
¦a ITy \Report For
r
Company Name
Plant Name
Plant ID
Plant Addiess
Plant City
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
57028 PAYETTE
Plant State ID
9blYes
|X ~j yes
XCUP No
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923
Regulated No
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013
Month g
Plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Solids:Tons
Liquids:Barrels
Gases:MCF
(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
\f3010,553
38,064
320VARIOUS(NATURAL GAS SPOT
PURCHASES ONLY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
Various (natural gas spot
Purchases only)
ng 365 6
NG 377.1 374.1
NG 1,164,432 316.9361.9
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transpoitation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Energy Sulfur Content Ash
Content
Heat
Content
Mercury Firm or
Content IntctTupt-
Prcdominant Secondary
Source Mode Mode
Percent weight
to nearest Percent weight
to nearest
ibJc
(MMYYj Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLYJ
VARIOUS (NATURAL GAS SPOT
PURCHASES ONI.Yj
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
NG I 1 X PL
NG I F PL
NG I F PL
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountyMSHAIDType
(MMYY)
VARIOUS (NATURAL GAS SPOT
'URCHASES ONLY)
'ARIOUS (NATURAL GAS SPOT
'URCHASES ONLYI
S NG
V s NG
P
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
S NG
>-
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant 57028 Langley Gulch Power Plant
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will he completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy
Source
Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Sulfur Ash
Content,
(coal only,to
nearest 0.1%)
Units Content,
(petroleum and
coal only,to
nearest 0.01%)
CA 1 OP NG 0 Mcf
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check )Was steam piocluced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Source
A
1 11001),CT NG 1,213,049 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
\1,213,049NGMet'1,213,049 0 0
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 8
Plant:57028 Langley Gulch Power PlantFormE1A-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators al steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
0[0CASTGOP
'
c
Form ApprovalU.S Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:g
Plant:57028 Langley Gulch Power PlantFormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-slorage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
\7 188,289
(MWh)
\y 18.1,57ftCT
V\
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy
Source
Unit Code Gross Generation (MWh)Net Generation (MWh)
C
o
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
/Schedule Part Item Comments
2 6 Approx SiOUk Trwispoii/Rescrvatiun fees are included for all three plants
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant 57028 Langley Gulch Power Plant
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error Description/
Override Comment
Error
NumTypeType
Code
Id
C