Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 35.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Month ^Year-2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Title Joint Venture Accountant Address PO Box 70 Cily/State/Zip Email Boise ID 83707 chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Box 70Address City/State/Zip Boise ID 83707 Email rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Idaho Power Co Plant Name Plant ID Plant Address Plant City Evander Andrews Power Complex Plant County 1 862 NW Mt Home Hwy Dist Rd Mountain Home 7953 Plant Slate ID *?NoYesRegulated For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?yes ^No CHP \ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0 1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Source (MMYY) (I\?rVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCI IASES ONLY) S NG 327.780 286 6 244.2 1SNG 9,116 --179 8 176 8 / 1rv Form ApprovalU.S.Department of Energy Energy Information Administration Montli Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality ofFuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chlutide Mode ModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0 01% 0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 327780 ISNG PL FIIYes?Yes fx]No fx]No ISNG9116 PL F?Yes I I Yes E No fx]No n \) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month:_Year; Form EIA-923 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Source Quantity Coal Mine State Coal Mine Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID A Sr Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plar,t:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption E1A USE ONLY (Group Code) Boiler Id Boiler StatusReport Month Prime Mover Energy Source Quantity Consumed Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) SulfurUnits Ash Code Content, (petroleum and coal only,to nearest 0 01%) Content, (coal only,to nearest 0 I %) Specify other fuel: / V Form ApprovalU.S.Department of Energy Energy Information Administration M(mth Monthly EIA923 Power Plant Operations Report 7 Year:2016 p|ant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) / Form ApprovalU.S.Department of Energy Energy Information Administration Monlh Monthly EIA923 Power Plant Operations Report 7 Year:2016 p|£»nt:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Energy Source Quantity Consumed Type OfUnitsPrime Mover Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit (Yes/No) Gross Generation Net Generation Code (MWIr)(MWh) 13n\336,896 IfGTNGMet'1.0000 GT 34,046Y 33,922 f Specify other fuel: .1 Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power Complex Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation Code(Group code)ID Code (MWh)(MWh) H V Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly E1A923 Power Plant Operations Report 7 Year.2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A CB D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source Form ApprovalU.S.Department of Energy Energy Information Administration jvjonth Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no slocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Coal: Residual Oil: Short Tons UnitsEnergy Source Previous Month/ Year Stocks Purchases Consumption Fuel BalanceAdjustmentto Stocks End ofMonth/ Year Stocks Comments for Adjustments •-/A B C D E HG Met"NG 336.896 336.896 0 0 / Form ApprovalU.S.Department of Energy Energy Information Administration Mon[h:^Year 2016 Monthly E1A923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D ,4 Form Approval OMBNo.1905-0129 Approval Expires 05/31/2017 U.S.Department ofEnergy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power ComplexFormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Transport/Rervation of approx $780k included for all three plants.62 Generator Retirement Dates Retirement Year Changes in Ownership (Provide name ofpurchaser and date sold.) Retirement Month CommentsGeneratorId Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 ERRORS Prime Equipment Type Fuel Schedule Mover Purchase Rpt Month Supplier Error Number &Description Ranges Override CommentID / 9 Form ApprovalU.S.Department ofEnergy Energy Information Administration Mont|r Monthly EIA923 Power Plant Operations Report 7 Year:2016 planl:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No,1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 DSC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Title Joint Venture Accountant Address PO Box 70 Boise chobbs@idahopower com City/State/Zip Email ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy HendersonContact Operations Finance LeaderTitle Address Box 70 City/State/Zip Email Boise rhenderson@idahopower com ID 83707 Phone (208)388-2290 Fax (208)388-2521 Report For Idaho Power CoCompanyName Plant Name Plant ID Bennett Mountain 55733 ElmorePlantCounty Plant Address Plant City 1015 West Hays St. ft-t 1MountainHomePlantSlateID H Yes ?NoRegulated orfVForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923*Yes No CHP Form Approval OMBNo.1905-0129 Approval Expires 05/3 1/2017 U.S.Department of Energy Energy Information Administration Monlh Monthly EIA923 Power Plant Operations Report 7 Year.2016 Plant:55733 Bennett Mountain Form EIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Contract Information Purchases Cost per llnit Total Delivered Cost Quantity Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0 1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY) <v Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly E1A923 Power Plant Operations Report 7 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCFfEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heal Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Mode ModeUnavailablePercentweight to nearest 0 01% Million Btus Quantity (MMBtus) per unit Percent weight to nearest Mode used to transport fuel over the longest distance Parts per Million,or enter 999 if not available Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0 01% I I Yes I I Yes ?No ?No J Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Quantity Coal Mine MSHA ID Coal Mine State Energy Source Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type J, \ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant 55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption E1A USE ONLY (Group Code) Prime Mover Boiler StatusReport Month Boiler Id Energy Source Units Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) SulfurQuantity Consumed Ash Code Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0 I %) Specify other fuel: hi Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) \l Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type Of Units Avg Heat Prime Mover Peaking Unit (Yes/No) Gross Generation Net GenerationContentCode(MWh)(MWh)(as burned) (MMBtu per ton, barrel,or Mcf) D3\I $15,8741.0000 GTGT%NG 155,954 Met'Y 15,967 Specify other fuel: A0 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY Energy Source Quantity Consumed Units Average Heal Content ETA USE fHigh Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code ID Code (MWh)(MWh) 1ft Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Energy Source Net Generation (MWh) Form ApprovalU.S.Department of Energy Energy Information Administration M0mh Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to till both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column O:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Units Previous Month/ Year Stocks Energy Source Purchases Adjustment to Stocks Consumption End of Month/ Year Stocks Fuel Balance Comments for Adjustments BA C D E F G H lk/ 0 Form ApprovalU.S.Department of Energy Energy Information Administration Montlv Monthly ETA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero ifno shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant CAB D ,\\% Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name ofpurchaser and date sold.) Generator Id Comments (y Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 p|arit:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Prime Equipment Type Fuel Schedule Mover Purchase Rpt Month Supplier RangesErrorNumber&Description Override CommentID / Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plailt:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 Form Approval U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 Plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEJA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal Fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit DaleCherylHobbsContact Joint Venture AccountantTitle PO Box 70Address ID 83707City/State/Zip Email Boise Phone (208)388-5614 Fax (208)433-5180chobbs@idahopowercom Supervisor of Contact Person for Survey Randy HendersonContact Operations Finance Leader Box 70 Title Address ID 83707City/State/Zip Boise rhenderson@idahopower.com Phone Fax (208)388-2521(208)388-2290Email iReportForr Company Name Idaho Power Co Plant Name Plant ID Plant Address Plant City Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth WOT57028PAYETTE Plant Slate ID (3 ?X Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923H?Yes No CHP \ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 r>lant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEJA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Cost per UnitPurchasesContractInformation Commodity Cost (coal,natural gas) Quantity Total Delivered Cost Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY)V 2xt[VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NG 171,655 276 8 239 2S 244 21,182,644 286 6NG'ARTOUS (NATURAL GAS SPOT PURCHASES INLY) S I 176.837,664 179 8ARIOUS(NATURAL GAS SPOT PURCHASES INLY) NGS U-'I Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly ETA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant Secondary ModeChloride Unavailable Mode Percent weight to nearestMillionBtus Quantity (MMBtus) per unit Percentweight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% 1 (2VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES S NO 171655 IPL IIIYesIIYes [x]No [xl No S NG 1182644 1 PL F F[ |Yes I I Yes fx]No [xl No ONLY) VARIOUS S NG 37664 1 PL F FIIYesIIYes(NATURAL GAS SPOT PURCHASES ONLY) [xl No [xl No °7/ \y Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Quantity Coal Mine Coal Mine State Energy Source Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID V, Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Prime Mover Boiler Status Quantity Consumed EIA USE ONLY (Group Code) Report Month Boiler Id Energy Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Code Source Content, (petroleum and coal only,to nearest 0 01%) Content, (coal only,to nearest 0 1%) Specify other fuel h/ V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) / Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 Plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Quantity ConsumedEnergy Source Type Of Units Avg Heat Content (as burned) (MMBlu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net Generation Code (MWh)(Yes/No)(MWh) Specify other fuel: / Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status El A USE ONLY Units Average Heat Content ETA USE (High Heating Value)ONLY (Group code) Energy Source Quantity Consumed Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation Code(Group code)ID Code (MWh)(MWh)4&198.534f11CA1OPNG0McfCT0000IGTGOP202,369 \I CT GTG 1391963 Mcf1OPNG 1 000 1 CA STG OP 0 4 \y Form ApprovalU.S.Department of Energy Energy Information Administration M0nt|r Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. B C D EA Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Prime Mover Energy Source 1 / Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column G:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End ofMonth/Comments for AdjustmentsFuelBalance Source Year Stocks EABCD F G H McfNG 1,391,963 1,391,963 0 0 1° V Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D l\/ 1/ Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Transport/Reservation of approx $780k included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments / 1/ Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover ID Rpt Month Supplier RangesErrorNumber&Description Override Comment $V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year.2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 /