Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit DateContact
Title Joint Venture Accountant
Address PO Box 70
Cily/State/Zip
Email
Boise ID 83707
chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Box 70Address
City/State/Zip Boise ID 83707
Email rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name Idaho Power Co
Plant Name
Plant ID
Plant Address
Plant City
Evander Andrews Power Complex
Plant County
1 862 NW Mt Home Hwy Dist Rd
Mountain Home
7953
Plant Slate ID
*?NoYesRegulated
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?yes ^No
CHP
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons
Liquids:Barrels
Gases:MCF
Cents per MMBtu,to
the nearest
0 1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
Tolling
Agreement
Contract
Expiration
Date
Energy
Source
(MMYY)
(I\?rVARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCI IASES
ONLY)
S NG 327.780 286 6 244.2
1SNG 9,116 --179 8 176 8
/
1rv
Form ApprovalU.S.Department of Energy
Energy Information Administration Montli
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality ofFuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chlutide Mode ModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0 01%
0.01%
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
327780 ISNG PL FIIYes?Yes
fx]No fx]No
ISNG9116 PL F?Yes I I Yes
E No fx]No
n
\)
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month:_Year;
Form EIA-923
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy
Source
Quantity Coal Mine
State
Coal Mine Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID
A
Sr
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plar,t:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
E1A USE
ONLY
(Group Code)
Boiler Id Boiler StatusReport
Month
Prime Mover Energy
Source
Quantity
Consumed
Avg Heat
Content
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
SulfurUnits Ash
Code Content,
(petroleum and
coal only,to
nearest 0 01%)
Content,
(coal only,to
nearest 0 I %)
Specify other fuel:
/
V
Form ApprovalU.S.Department of Energy
Energy Information Administration M(mth
Monthly EIA923 Power Plant Operations Report
7 Year:2016 p|ant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Monlh
Monthly EIA923 Power Plant Operations Report
7 Year:2016 p|£»nt:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Energy
Source
Quantity Consumed Type OfUnitsPrime
Mover
Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit
(Yes/No)
Gross Generation Net Generation
Code (MWIr)(MWh)
13n\336,896 IfGTNGMet'1.0000 GT 34,046Y 33,922
f
Specify other fuel:
.1
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power Complex
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Energy
Source
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
Code(Group code)ID Code (MWh)(MWh)
H
V
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly E1A923 Power Plant Operations Report
7 Year.2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A CB D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration jvjonth
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no slocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Coal:
Residual Oil:
Short Tons
UnitsEnergy
Source
Previous Month/
Year Stocks
Purchases Consumption Fuel BalanceAdjustmentto
Stocks
End ofMonth/
Year Stocks
Comments for Adjustments
•-/A B C D E HG
Met"NG 336.896 336.896 0 0
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Mon[h:^Year 2016
Monthly E1A923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
,4
Form Approval
OMBNo.1905-0129
Approval Expires 05/31/2017
U.S.Department ofEnergy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power ComplexFormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Transport/Rervation of approx $780k included for all three plants.62
Generator Retirement Dates
Retirement
Year
Changes in Ownership (Provide name ofpurchaser and date sold.)
Retirement
Month
CommentsGeneratorId
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
ERRORS
Prime Equipment
Type Fuel Schedule Mover
Purchase
Rpt Month Supplier Error Number &Description Ranges Override CommentID
/
9
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Mont|r
Monthly EIA923 Power Plant Operations Report
7 Year:2016 planl:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No,1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 DSC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit DateContact
Title Joint Venture Accountant
Address PO Box 70
Boise
chobbs@idahopower com
City/State/Zip
Email
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy HendersonContact
Operations Finance LeaderTitle
Address Box 70
City/State/Zip
Email
Boise
rhenderson@idahopower com
ID 83707
Phone (208)388-2290 Fax (208)388-2521
Report For
Idaho Power CoCompanyName
Plant Name
Plant ID
Bennett Mountain
55733 ElmorePlantCounty
Plant Address
Plant City
1015 West Hays St.
ft-t 1MountainHomePlantSlateID
H Yes ?NoRegulated
orfVForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923*Yes No
CHP
Form Approval
OMBNo.1905-0129
Approval Expires 05/3 1/2017
U.S.Department of Energy
Energy Information Administration Monlh
Monthly EIA923 Power Plant Operations Report
7 Year.2016 Plant:55733 Bennett Mountain
Form EIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Contract Information Purchases Cost per llnit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0 1 cents
Cents per MMBtu,to
the nearest
0 1 cents
Fuel Supplier Name Purchase
Type or
Tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)
<v
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly E1A923 Power Plant Operations Report
7 Year:2016 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCFfEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heal Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride Mode ModeUnavailablePercentweight
to nearest
0 01%
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0 01%
I I Yes I I Yes
?No ?No
J
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Quantity Coal Mine
MSHA ID
Coal Mine
State
Energy
Source
Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Fuel Supplier Type
J,
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
E1A USE
ONLY
(Group Code)
Prime Mover Boiler StatusReport
Month
Boiler Id Energy
Source
Units Avg Heat
Content
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
SulfurQuantity
Consumed
Ash
Code Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0 I %)
Specify other fuel:
hi
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain
Form EIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
\l
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type Of Units Avg Heat Prime Mover Peaking Unit
(Yes/No)
Gross Generation Net GenerationContentCode(MWh)(MWh)(as burned)
(MMBtu per ton,
barrel,or Mcf)
D3\I $15,8741.0000 GTGT%NG 155,954 Met'Y 15,967
Specify other fuel:
A0
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Energy
Source
Quantity
Consumed
Units Average Heal Content ETA USE
fHigh Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
1ft
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Energy
Source
Net Generation (MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration M0mh
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to till both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column O:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Previous Month/
Year Stocks
Energy
Source
Purchases Adjustment to
Stocks
Consumption End of Month/
Year Stocks
Fuel Balance Comments for Adjustments
BA C D E F G H
lk/
0
Form ApprovalU.S.Department of Energy
Energy Information Administration Montlv
Monthly ETA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero ifno shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
CAB D
,\\%
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name ofpurchaser and date sold.)
Generator Id Comments
(y
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 p|arit:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Prime Equipment
Type Fuel Schedule Mover
Purchase
Rpt Month Supplier RangesErrorNumber&Description Override CommentID
/
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plailt:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3
Form Approval
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 Plant:57028 Langley Gulch Power Plant
OMBNo.1905-0129
Approval Expires 05/31/2017FormEJA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal Fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit DaleCherylHobbsContact
Joint Venture AccountantTitle
PO Box 70Address
ID 83707City/State/Zip
Email
Boise
Phone (208)388-5614 Fax (208)433-5180chobbs@idahopowercom
Supervisor of Contact Person for Survey
Randy HendersonContact
Operations Finance Leader
Box 70
Title
Address
ID 83707City/State/Zip Boise
rhenderson@idahopower.com Phone Fax (208)388-2521(208)388-2290Email
iReportForr
Company Name Idaho Power Co
Plant Name
Plant ID
Plant Address
Plant City
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
WOT57028PAYETTE
Plant Slate ID (3
?X Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923H?Yes No
CHP
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 r>lant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEJA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Cost per UnitPurchasesContractInformation
Commodity
Cost (coal,natural gas)
Quantity Total Delivered
Cost
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0 1 cents
Fuel Supplier Name Purchase
Type or
Tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)V 2xt[VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
NG 171,655 276 8 239 2S
244 21,182,644 286 6NG'ARTOUS (NATURAL GAS SPOT PURCHASES
INLY)
S
I 176.837,664 179 8ARIOUS(NATURAL GAS SPOT PURCHASES
INLY)
NGS
U-'I
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly ETA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary
ModeChloride
Unavailable Mode
Percent weight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percentweight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
1
(2VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
S NO 171655 IPL IIIYesIIYes
[x]No [xl No
S NG 1182644 1 PL F F[ |Yes I I Yes
fx]No [xl No
ONLY)
VARIOUS S NG 37664 1 PL F FIIYesIIYes(NATURAL
GAS SPOT
PURCHASES
ONLY)
[xl No [xl No
°7/
\y
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Quantity Coal Mine Coal Mine
State
Energy
Source
Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID
V,
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Prime Mover Boiler Status Quantity
Consumed
EIA USE
ONLY
(Group Code)
Report
Month
Boiler Id Energy Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur Ash
Code Source Content,
(petroleum and
coal only,to
nearest 0 01%)
Content,
(coal only,to
nearest 0 1%)
Specify other fuel
h/
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
/
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 Plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity ConsumedEnergy
Source
Type Of Units Avg Heat
Content
(as burned)
(MMBlu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net Generation
Code (MWh)(Yes/No)(MWh)
Specify other fuel:
/
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime Boiler/Boiler
Mover Generation Status
El A USE
ONLY
Units Average Heat Content ETA USE
(High Heating Value)ONLY
(Group code)
Energy
Source
Quantity
Consumed
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
Code(Group code)ID Code (MWh)(MWh)4&198.534f11CA1OPNG0McfCT0000IGTGOP202,369
\I CT GTG 1391963 Mcf1OPNG 1 000 1 CA STG OP 0
4
\y
Form ApprovalU.S.Department of Energy
Energy Information Administration M0nt|r
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant;57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
B C D EA
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Prime
Mover
Energy
Source
1
/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column G:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End ofMonth/Comments for AdjustmentsFuelBalance
Source Year Stocks
EABCD F G H
McfNG 1,391,963 1,391,963 0 0
1°
V
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
l\/
1/
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Transport/Reservation of approx $780k included for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
/
1/
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover ID Rpt Month Supplier RangesErrorNumber&Description Override Comment
$V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year.2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
/