HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 33.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip
Email
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact
Title-
Address
Randy Henderson
Operations Finance Leader
s v#
Box 70
cb
City/State/Zip
Email
Boise
rhenderson@idahopower.com
ID 83707
Phone (208)388-2290 Fax (208)388-2521
Report For
Idaho Power CoCompanyName
Plant Name Evander Andrews Power Complex
Plant County
1 862 NW Mt Home Hwy Dist Rd
Mountain Home
Plant ID 7953
Plant Address
Plant City Plant State ID
EJ ?NoYesRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?HYes No
CHP
j
4^',,»iwCHPEfficiency
A
\)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
oWasFuelpurchasedthismonth?Yes x No
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)
v r ^442.9445.9fVARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S NG 3,174
t 1\S NG 140,591 442.7 384.6
9
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:7953 Evander Andrews Power ComplexMonth:
Form EIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Contenl
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBlus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
second longest
distance
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 3174 I PL P «<"C Yes Id Yes
fx]No [x]No
NG 1S140591 PL F?Yes ?Yes
fxl No nn No
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
PurcliaseT Coal Mine Coal Mine
State
Coal MineEnergyQuantity
Source
Coal Mine
Name
Coal Mine
County
Fuel Supplier MSHA ID Typeype
9'
Form ApprovalU.S.Department of Energy
Energy Information Administration Momh.
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
E[A USE
ONLY
(Group Code)
Prime Mover Boiler IdReport
Month
Boiler Status Quantity
Consumed
Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Energy
Source
Units Ash
Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
^4
v)
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Rpt Generator Gross Generation Net Generation
Month Id (MWh)(MWh)
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type OfUnits Avg Heal
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Peaking UnitPrimeMover Gross Generation Net Generation
(Yes/No)Code (MWh)(MWh)
GT NG 143,765 Mcf 1.0000 GT Y 13,740 13,585
Specify other fuel:
9
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
Prime
Mover
BoilerEIAUSE
ONLY
(Group code)
Boiler
Status
Quantity
Consumed
Units Average Heat Content EJAUSE
(High Heating Value)ONLY
(Group code)
Energy Prime
Mover
Generator Generator
Status
Gloss
Generation
Net
(HRSG)Source ID Generation
Code ID Code (MWh)(MWh)
%/
9
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017
Monlh:
Form EIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-S60 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers ofa single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Energy Gross Generation (MWh)Net Generation (MWh)
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Monih-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERTOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include hack-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identity the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy
Source
Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for Adjustments
Year Stocks
A B C GDEF H
:NG Mcf 143,765 143,765 0 0
|t>
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A C DB
\\
/'
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year:2014
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex
OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
ItemSchedulePart
Includes approx $8 18k ofreservation/transport fees for all three plants.62
Changes in Ownership (Provide name of purchaser and date sold.)
N)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Error Number&Description RangesRptMonthSupplier Override Comment
99
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
'-I
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit DateCherylHobbsContact
Title
Address
Joint Venture Accountant
PO Box 70
City/State/Zip
Email
Boise ID 83707
Phone Fax (208)433-5180chobbs@idahopower.com (208)388-5614
Supervisor of Contact Person for Survey
Contact
Title
Address
Randy Henderson
Operations Finance Leader
Box 70
City/State/Zip
Email
Boise ID 83707
Fax (208)388-2521rlienderson@idahopowercomPhone(208)388-2290
Report For Py
rf
Idaho Power CoCompanyName
Plant Name
/
\Bennett Mountain
VPElmorePlantID55733PlantCountyn
cr
i?^Plant Address 1015 West Hays St.v-
Plant City Plant StateMountainHome ID
V ?NoYesRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?HYes No
CHP
CHP Efficiency
V1
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
0?Was Fuel purchased this month?Yes No
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0,1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy
Source Liquids:Barrels
Gases:MCF
(MMYY)
rt"0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALTTY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
?Yes ?Yes
?No ?No
f)6
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Coal Mine InformationPurchases(From Schedule 2,Part A)
PurchaseT Quantity Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
County
Energy
SourceFuelSupplier TypeMSHAIDype
Vay
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 1 0MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Boiler Status Quantity
Consumed
Avg Heat
Content.
(High Heating Value)
(MMBtu perton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshE1AUSE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Energy
Source
Units
Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
/
(V
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Rpl Generator Gross Generation Net Generation
Month Id (MWh)(MWh)
Mr
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
GenerationFuelConsumption
Avg Heat
Content,
(as burned)
(MMBtuper ton,
barrel,or Mcf)
Quantity Consumed Type OfUnitsPrime
Mover
Energy Peaking Unit Net GenerationGrossGenerationPrimeMoverSource(Yes/No)(MWh)(MWh)Code
0\21,165?\219,741 $21,103YMet'1.0000 GTNGGT
d
Specify other fuel:
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
7 Year.2014 plant'55733 Bennett Mountain
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
GenerationFuelConsumption
Prime
Mover
Boiler Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Generator Generator
Status
Gross
Generation
Net
Generation
Prime
Mover
Boiler
Status
Quantity
Consumed
EIA USE
ONLY
(Group code)
Energy
Source ID(HRSG)
Code (MWh)(MWh)Code ID
H&
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothennal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Energy
Source
Units Previous Month/
Year Slocks
End of Month/Purchases Consumption Adjustment to
Stocks
Fuel Balance Comments for Adjustments
Year Stocks
A B C GDF HE
NG Mcf 0
PV
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity ofFuel Shipped to PlantPlantNameFuelTypePlantID
DBCA
13'
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
7 Year:2014 p,ant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Includes approx $8 18k ofreservation/transport fees for all three plants.62
Changes in Ownership (Provide name of purchaser and date sold.)
A/
\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment
0/
0
U.S.Department ofEnergy
Energy Information Administrali
Monthly EIA923 Power Plant Operations Report
7 Year 2014 Plant.55733 Bennett Mountain
Form Approval
ion Month:OMBNo.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3
A
$
Form ApprovalU.S.Department of Energy
Energy Information Administration
Form EIA-923
Monthly EIA923 Power Plant Operations Report
7 Year.2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180
Supervisor ofContact Person for Survey
yContactRandyHenderson
>&Operations Finance LeaderTitle
S"&Box 70Address
Boise
rhenderson@idahopower.com
City/State/Zip ID 83707
Email Phone Fax (208)388-2521(208)388-2290
Report For
Company Name Idaho Power Co
Plant Name Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
Plant City Plant State ID
?*Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923YesNo
CHP
CHP Efficiency
,\I
tl&lH
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?MWasFuelpurchasedthismonth?Yes No
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy
Source Liquids:BarrelsTypeorGases:MCFtolling
Agreement (MMYY)
K442.7VARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)?S NG 1,012,700 I 384.6
t/X "3 445.9¦22,X6S'ARIOUS (NATURAL GAS SPOT PURCHASES
INI.Y)
S NG 442.9
£
v.
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnel Content Unavailable Contcnl
Chloride Content Contract Information
Ash ContentAverageHeatSulfurContent
Content
Predominant Supply Delivery
Contract Contract
SecondaryChloride
Unavailable Mode Mode
Percent weight
to nearest
Type Type
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
overthe
second longest
distance
Parts per
Million,or
enter 999 if
not available
Purchase Energy
Type Source
Fuel Supplier 0.01%
0.01%
F t/VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 1012700 I PLIIYesIIYes
fx]No [71 No
F"t7SNG22865IPL?Yes I I Yes
71 No 71 No
L-
Form ApprovalU.S.Department of Energy
Energy Information Administration Monlh.
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Coal Mine informationPurchases(From Schedule 2,Part A)
Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
County
PurcliaseT Energy Quantity
SourceFuelSupplier MSHA ID Typeype
V,
L'
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Monttl.
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Prime Mover Boiler Id Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
AshEIAUSE
ONLY
(Group Code)
Report
Month Code Content,
(coal only,to
nearest 0.1 %)
Specify other fuel:
b/\y
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Gross GenerationRptGenerator Net Generation
Month Id (MWh)(MWh)
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Prime Mover Peaking Unit
(Yes/No)
Gross Generation Net Generation
Code (MWh)(MWh)
Specify other fuel:
1I/
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption
Prime Boiler
Mover (HRSG)
Code
Generation
Boiler
Status
Units Average Heat Content EJA USE
(High Heating Value)ONLY
E1A USE
ONLY
Energy Quantity
Consumed
Prime
Mover
(Group code)Code
Generator Generator
Status
Gross
Generation
Net
Source ID Generation
(Group code)ID (MWh)
\S "fa,751
(Mjyti)
6 146,632CA1OPNG0Mcf0.000 I CT GTG OP e?\
CT OPGTG1035565McfNG1.000 STGICA
H
\y
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
u
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant;57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017
Month:
Form EIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Units Purchases Adjustment to
Stocks
End of Month/
Year Stocks
Fuel BalanceEnergyPreviousMonth/
Year Stocks
Consumption Comments for Adjustments
Source
A B C D E F G H
Mcf 1,035,565 1,035,565NG 0 0
'I
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017
Month:
Form EIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity of Fuel Shipped to PlantFuelTypePlantNamePlantID
C DBA
c
1/
U.S.Department ofEnergy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
57028 Langley Gulch Power Plant
Form Approval
ion Month:7 Year:2014 Plant:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
2 6 Includes approx $818k ofreservation/transport fees for all three plants.
Changes in Ownership (Provide name ofpurchaser and date sold.)
,1*I
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType SupplierRptMonth ErrorNumber &Description Ranges Override Comment
/
w
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
57028 Langley Gulch Power Plant
Form Approval
Month;7 Year:2014 Plant:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
f