Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 33.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Email Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Title- Address Randy Henderson Operations Finance Leader s v# Box 70 cb City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 Phone (208)388-2290 Fax (208)388-2521 Report For Idaho Power CoCompanyName Plant Name Evander Andrews Power Complex Plant County 1 862 NW Mt Home Hwy Dist Rd Mountain Home Plant ID 7953 Plant Address Plant City Plant State ID EJ ?NoYesRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?HYes No CHP j 4^',,»iwCHPEfficiency A \) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) oWasFuelpurchasedthismonth?Yes x No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY) v r ^442.9445.9fVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 3,174 t 1\S NG 140,591 442.7 384.6 9 Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:7953 Evander Andrews Power ComplexMonth: Form EIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Contenl Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Unavailable Mode Mode Percent weight to nearestMillionBtus Quantity (MMBlus) per unit Percent weight to nearest Mode used to transport fuel over the second longest distance Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 3174 I PL P «<"C Yes Id Yes fx]No [x]No NG 1S140591 PL F?Yes ?Yes fxl No nn No Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant 7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information PurcliaseT Coal Mine Coal Mine State Coal MineEnergyQuantity Source Coal Mine Name Coal Mine County Fuel Supplier MSHA ID Typeype 9' Form ApprovalU.S.Department of Energy Energy Information Administration Momh. Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant 7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormE1A-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption E[A USE ONLY (Group Code) Prime Mover Boiler IdReport Month Boiler Status Quantity Consumed Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) Energy Source Units Ash Code Content, (coal only,to nearest 0.1%) Specify other fuel: ^4 v) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Rpt Generator Gross Generation Net Generation Month Id (MWh)(MWh) V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heal Content, (as burned) (MMBtu per ton, barrel,or Mcf) Peaking UnitPrimeMover Gross Generation Net Generation (Yes/No)Code (MWh)(MWh) GT NG 143,765 Mcf 1.0000 GT Y 13,740 13,585 Specify other fuel: 9 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Mover BoilerEIAUSE ONLY (Group code) Boiler Status Quantity Consumed Units Average Heat Content EJAUSE (High Heating Value)ONLY (Group code) Energy Prime Mover Generator Generator Status Gloss Generation Net (HRSG)Source ID Generation Code ID Code (MWh)(MWh) %/ 9 Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017 Monlh: Form EIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-S60 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers ofa single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Energy Gross Generation (MWh)Net Generation (MWh) Source Form ApprovalU.S.Department of Energy Energy Information Administration Monih- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERTOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include hack-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identity the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Energy Source Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for Adjustments Year Stocks A B C GDEF H :NG Mcf 143,765 143,765 0 0 |t> 9 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant;7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A C DB \\ /' 9 Form ApprovalU.S.Department of Energy Energy Information Administration Month.^Year:2014 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) ItemSchedulePart Includes approx $8 18k ofreservation/transport fees for all three plants.62 Changes in Ownership (Provide name of purchaser and date sold.) N) Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Error Number&Description RangesRptMonthSupplier Override Comment 99 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 '-I Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit DateCherylHobbsContact Title Address Joint Venture Accountant PO Box 70 City/State/Zip Email Boise ID 83707 Phone Fax (208)433-5180chobbs@idahopower.com (208)388-5614 Supervisor of Contact Person for Survey Contact Title Address Randy Henderson Operations Finance Leader Box 70 City/State/Zip Email Boise ID 83707 Fax (208)388-2521rlienderson@idahopowercomPhone(208)388-2290 Report For Py rf Idaho Power CoCompanyName Plant Name / \Bennett Mountain VPElmorePlantID55733PlantCountyn cr i?^Plant Address 1015 West Hays St.v- Plant City Plant StateMountainHome ID V ?NoYesRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?HYes No CHP CHP Efficiency V1 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) 0?Was Fuel purchased this month?Yes No Contract Information Purchases Cost per Unit Total Delivered Cost Quantity Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0,1 cents Fuel Supplier Name Purchase Type or tolling Agreement Contract Expiration Date Energy Source Liquids:Barrels Gases:MCF (MMYY) rt"0 Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALTTY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) per unit Percent weight to nearest Parts per Million,or enter999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% ?Yes ?Yes ?No ?No f)6 Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Coal Mine InformationPurchases(From Schedule 2,Part A) PurchaseT Quantity Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County Energy SourceFuelSupplier TypeMSHAIDype Vay Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 1 0MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption Boiler Status Quantity Consumed Avg Heat Content. (High Heating Value) (MMBtu perton, barrel,or Mcf) Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshE1AUSE ONLY (Group Code) Report Month Prime Mover Boiler Id Energy Source Units Code Content, (coal only,to nearest 0.1%) Specify other fuel: / (V Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Rpl Generator Gross Generation Net Generation Month Id (MWh)(MWh) Mr Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation GenerationFuelConsumption Avg Heat Content, (as burned) (MMBtuper ton, barrel,or Mcf) Quantity Consumed Type OfUnitsPrime Mover Energy Peaking Unit Net GenerationGrossGenerationPrimeMoverSource(Yes/No)(MWh)(MWh)Code 0\21,165?\219,741 $21,103YMet'1.0000 GTNGGT d Specify other fuel: Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 7 Year.2014 plant'55733 Bennett Mountain Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov GenerationFuelConsumption Prime Mover Boiler Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Generator Generator Status Gross Generation Net Generation Prime Mover Boiler Status Quantity Consumed EIA USE ONLY (Group code) Energy Source ID(HRSG) Code (MWh)(MWh)Code ID H& Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report Month:7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothennal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column C:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Source Units Previous Month/ Year Slocks End of Month/Purchases Consumption Adjustment to Stocks Fuel Balance Comments for Adjustments Year Stocks A B C GDF HE NG Mcf 0 PV Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity ofFuel Shipped to PlantPlantNameFuelTypePlantID DBCA 13' Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 7 Year:2014 p,ant;55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Includes approx $8 18k ofreservation/transport fees for all three plants.62 Changes in Ownership (Provide name of purchaser and date sold.) A/ \ Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment 0/ 0 U.S.Department ofEnergy Energy Information Administrali Monthly EIA923 Power Plant Operations Report 7 Year 2014 Plant.55733 Bennett Mountain Form Approval ion Month:OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 A $ Form ApprovalU.S.Department of Energy Energy Information Administration Form EIA-923 Monthly EIA923 Power Plant Operations Report 7 Year.2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise ID 83707 chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180 Supervisor ofContact Person for Survey yContactRandyHenderson >&Operations Finance LeaderTitle S"&Box 70Address Boise rhenderson@idahopower.com City/State/Zip ID 83707 Email Phone Fax (208)388-2521(208)388-2290 Report For Company Name Idaho Power Co Plant Name Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Plant ID 57028 PAYETTE Plant Address Plant City Plant State ID ?*Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923YesNo CHP CHP Efficiency ,\I tl&lH Form ApprovalU.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) ?MWasFuelpurchasedthismonth?Yes No Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Source Liquids:BarrelsTypeorGases:MCFtolling Agreement (MMYY) K442.7VARIOUS(NATURAL GAS SPOT PURCHASES ONLY)?S NG 1,012,700 I 384.6 t/X "3 445.9¦22,X6S'ARIOUS (NATURAL GAS SPOT PURCHASES INI.Y) S NG 442.9 £ v. Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnel Content Unavailable Contcnl Chloride Content Contract Information Ash ContentAverageHeatSulfurContent Content Predominant Supply Delivery Contract Contract SecondaryChloride Unavailable Mode Mode Percent weight to nearest Type Type Million Btus Quantity (MMBtus) per unit Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel overthe second longest distance Parts per Million,or enter 999 if not available Purchase Energy Type Source Fuel Supplier 0.01% 0.01% F t/VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 1012700 I PLIIYesIIYes fx]No [71 No F"t7SNG22865IPL?Yes I I Yes 71 No 71 No L- Form ApprovalU.S.Department of Energy Energy Information Administration Monlh. Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 3.are on page 7.) Coal Mine informationPurchases(From Schedule 2,Part A) Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County PurcliaseT Energy Quantity SourceFuelSupplier MSHA ID Typeype V, L' Form ApprovalU.S.Department ofEnergy Energy Information Administration Monttl. Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/. Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and generators at this plant: Generators with Nameplate Capacity 10MW or Above Fuel Consumption Sulfur Content, (petroleum and coal only,to nearest 0.01%) Prime Mover Boiler Id Boiler Status Energy Source Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) AshEIAUSE ONLY (Group Code) Report Month Code Content, (coal only,to nearest 0.1 %) Specify other fuel: b/\y Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Gross GenerationRptGenerator Net Generation Month Id (MWh)(MWh) V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) Prime Mover Peaking Unit (Yes/No) Gross Generation Net Generation Code (MWh)(MWh) Specify other fuel: 1I/ Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 Month: Form EIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Prime Boiler Mover (HRSG) Code Generation Boiler Status Units Average Heat Content EJA USE (High Heating Value)ONLY E1A USE ONLY Energy Quantity Consumed Prime Mover (Group code)Code Generator Generator Status Gross Generation Net Source ID Generation (Group code)ID (MWh) \S "fa,751 (Mjyti) 6 146,632CA1OPNG0Mcf0.000 I CT GTG OP e?\ CT OPGTG1035565McfNG1.000 STGICA H \y Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. Column A:Prime Mover CodeL Select the prime mover code from the drop down list. Column B:Energy Source:Select the energy source code from the drop down list. Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.) Column D:Gross Generation: -Enter the aggregate generation for prime movers of a single type,in MWh -Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured. Column E:Net Generation: -Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh. -Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines. Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source u Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant;57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017 Month: Form EIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column C:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column D,E and F: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column G:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use. -Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Units Purchases Adjustment to Stocks End of Month/ Year Stocks Fuel BalanceEnergyPreviousMonth/ Year Stocks Consumption Comments for Adjustments Source A B C D E F G H Mcf 1,035,565 1,035,565NG 0 0 'I Form ApprovalU.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017 Month: Form EIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity of Fuel Shipped to PlantFuelTypePlantNamePlantID C DBA c 1/ U.S.Department ofEnergy Energy Information Administrati Monthly EIA923 Power Plant Operations Report 57028 Langley Gulch Power Plant Form Approval ion Month:7 Year:2014 Plant:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item 2 6 Includes approx $818k ofreservation/transport fees for all three plants. Changes in Ownership (Provide name ofpurchaser and date sold.) ,1*I Form ApprovalU.S.Department of Energy Energy Information Administration Month: Monthly EIA923 Power Plant Operations Report 7 Year:2014 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Fuel Schedule Mover IDType SupplierRptMonth ErrorNumber &Description Ranges Override Comment / w U.S.Department of Energy Energy Information Administration Monthly EIA923 Power Plant Operations Report 57028 Langley Gulch Power Plant Form Approval Month;7 Year:2014 Plant:OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 f