HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 32.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise
chobbsfaJidahopowcr.com
ID 83707
Email Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
City/Stale/Zip
Email
Boise ID 83707
rhenderson(a>idahopower.com (208)388-2290 Fax (208)388-2521Phone
rReportFor
0?;
Company Name
Plant Name
Idaho Power Co
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Dist Rd
Mountain Home
Plant ID 7953
Plant Address
Plant City Plant State ID
kW-
!i v-CDCHP No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
13Regulated Yes No
S)'
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month.7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete forAll Fuels
Receipts
All Fuels
Cost per Unit
All Fuels
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Solids:Tons
(MMYY)Liquids:Barrels Cents pet MMBtu,to
the nearest
0.1 cents
Gases:MCF
3.<?\
392 IVARIOUS(NATURAL GAS SPOT
PURCHASES ONLY)
VARIOUS (NATURAL GAS SPOT
.PlJItt 'l IASUS ONI.Y)
S NG 3,793 395 1
VsNG 454,004 384.6 340.3
1s
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoafPetCoke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Heat
Content
Sulfur ContentEnergy
Source
Ash
Content
Mercury Firm or
Content Interrupt-
Prcdominant Secondary
Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus(MMYY)Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLYj
(VARIOUS (NATURAL GAS SPOT
Purchases onlyj
s NG 1 F PL
S ING F PL
9"/
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:7953 Evander Andrews Power Complex
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Coal Mine Coal Mine Coal Mine
Name
Contract Type Contract
Expiration
Date
Energy Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
VAKIOl IS (NATURAL GAS SPOT
PURtnASUS ONLY)
s NG
NGS
4
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler
Mover Id
Status Energy
Source
Quantity Type Of Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Ash
Content,
(coal only,to
nearest 0.1%)
Units
If Energy source reported is OTI-I,OBS,OBG,OBL,or OG,
please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBlu per ton,
barrel,or Met)
1 .0(1(1(1orNG457,797 Mcf
:
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
PriorMonth's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Slocks
Adjustments
To Stocks
Balance Comment (if balance is not zero please enter a comment)
t Met"NG 457,797 457,797 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 7
Plant:7953 Evander Andrews Power ComplexFormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reportedon SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
9'
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant;7953 Evander Andrews Power Complex
Month 7
Form EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
$GT 42,239
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:7953 Evander Andrews Power Complex
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy
Source
Unit Code Gross Generation (MWh)Net Generation (MWh)
L
b
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part CommentsItem
Approx $833k Tran/Reser is included for all three plants.2 6
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plarit:55733 Bennett Mountain
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Subvnil By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise
cliobbs@idaliopower.com
ID 83707
Email Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Hendetson
Operations Finance LeaderTitle
Box 70Address
City/State/Zip
Email
Boise ID 83707
rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
TTCompanyName
Plant Name
Idaho Power Co
OBennettMountain
Plant ID
Plant Address
Plant City
55733 Plant County Elmore
r-
1015 West Hays St.
03MountainHomePlantStateID
CHP XYes No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X YesRegulated No
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 7
Form EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
N No Receipts Is there a fuel tolling agreement in place for this plant?
Receipts
All Fuels
Contract Information
Complete for All Fuels
Cost per Unit
All Fuels
Supplier Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Contract Type Contract
Expiration
Date
Energy
Source
Solids:Tons
Liquids:Barrels(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants SO megawatts and above
Contract Information
Complete for All Fuels
Quality of Fuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Energy Sulfur Content AshHeat
Content
Mercury Firm or
Content Interrapt-
Prcdoniinant Secondary
Source Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
tiansport fuel
over the
second longest
distance
(MMBtus)0.01%
0.01%0.01%per unit
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plar)t:55733 Bennett Mountain
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
If you have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Energy
Source
Coal Mine
CountyMSHAIDType
(MMYY)
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for FIRSGs in duct burners.Report consumption in combustion turbines or 1C engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during Ihis reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Sulfur Ash
Content,
(coal only,to
nearest 0.1 %)
Avg Heat
Content,
(as burned)
(MMBtuperton,
barrel,or Met)
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
Form Approval
OMB No.1905-0129
Approval Expires 12/3 1/20 1 3
U.S.Department of Energy
Energy information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:7
Form EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
I (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBlu per ton,
barrel,or Met)
I CKKU*NG McfGT178,066 0
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
Current Month's
Receipts
Prior Month's
Ending Stocks
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (if balance is not zero please enter a comment)
<"2
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant;55733 Bennett Mountain
Month.7
Form EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fileled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten of the instructions),
Prime
Mover
Generator Gross GenerationGenerator
Status
Net Generation
Id (MWh)(MWh)
&
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:55733 Bennett Mountain
Month.7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
-0 17,435
(MWh)
0GT
7
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy
Source
Unit Code Gross Generation (MWh)Net Generation (MWh)
\5'°
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
2 Approx $833k Tran'Rcssr is included for all three plants.6
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 7
Form EIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant 57028 Langley Gulch Power Plant
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Contact Cheryl Hobbs
Title Joint Venture Accountant
Accept By
Accept Date
PO Box 70Address
City/Slate/Zip Boise
chobbs@idaliopower com
ID 83707
Email Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
City/Stale/Zip
Email
Boise
rhendcrsonftpidahopower.com
ID 83707
(208)388-2290 Fax (208)388-2521Phone
Report For
Idaho Power Co
Langley Gulch Power Plant
Plant Counly
Interstate 84 and Highway 30
New Plymouth
Company Name
Plant Name
Plant ID CJb.57028 PAYETTE
Plant Address
i>Plant City Plant State ID
XCHP
¦a*1"'
^•e gat
Yes No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923;noRegulatedXYes
8)27'
\V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant 57028 Langley Gulch Power Plant
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Receipts Costper Unit
All Fuels
Contract Information
Complete for All Fuels All Fuels
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
(MMYY)
Gases:MCF
N 1*fVarious(natural gas spot
I'UKC'I IASES ONI V)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
392.1,10,232 395 1SNG
1,224,638 384.6 340.3NGS
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plarit:57028 Langley Gulch Power Plant
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants SO megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transpoitation
Natural Gas
Only
All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Supplier Contract Type Contract
Expiration
Date
Energy Sulfur Content Ash Mercury Firm or
Content Interrupt-
PrcdominantHeat
Content
Secondary
ModeSourceModeContent
Percent weight
to nearest Percent weight
to nearest
0.01%
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONI.Yj
VARIOUS (NATURAL GAS SPOT
'PURCHASES ONI.Yj
S NG I F PL
S NG I F PL
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p'ant 57028 Langley Gulch Power Plant
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Coal Mine Coal Mine
State
Supplier Contract Type Contract
Expiration
Date
Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Energy
Source MSHA ID
(MMYY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLYI
VARUM IS (NATURAL GAS SPOT
PURCHASES ONLY)
NGS
NGS
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Tf this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
f 1 (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Quantity Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Prime Boiler Status
Mover Id
Energy
Source
Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Ash
Units Content,
(coal only,to
neaiest 0.1 %)
McfCA1NOOP0 0
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
b
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013 Plant.57028 Langley Gulch Power PlantFormEIA-923
Month 7
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
Type OfUnitsQuantity Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
i.oooo!NGCT 1,234,869 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
u
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month 7
OMB No.1905-0129
Approval Expires 1 2/3 1/20 13FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE ENI)OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Inslruclions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Slocks held olT-site that cannot be assigned to an individual plant arc to he reported as stocks held at a central storage site.Each central storage site must be
reported separately,New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
PriorMonth's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
?NG Met 1,234,870 1,234,869 00
Au
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
2013 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 12/31/2013
Year:
Form EIA-923
Month:7
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Net GenerationGrossGeneration
Id (MWh)(MWh)
CA STG OP 0
u
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month.7
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
l74-826 A
(MWh)
171.0X9CI
\
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,anf 57028 Langley Gulch Power Plant
Month:7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit Code Gross Generation (MWh)Net Generation (MWh)Energy
Source
0\\y
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month;7
OMB No.1905-0129
Approval Expires 12/3 1/20 1 3FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Approx $K33k Tran/Reser is included for nil three plants26
\\V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:57028 Langley Gulch Power Plant
Month 7
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code