Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 32.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise chobbsfaJidahopowcr.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/Stale/Zip Email Boise ID 83707 rhenderson(a>idahopower.com (208)388-2290 Fax (208)388-2521Phone rReportFor 0?; Company Name Plant Name Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home Plant ID 7953 Plant Address Plant City Plant State ID kW- !i v-CDCHP No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 13Regulated Yes No S)' Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:7953 Evander Andrews Power Complex Month.7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete forAll Fuels Receipts All Fuels Cost per Unit All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents pet MMBtu,to the nearest 0.1 cents Gases:MCF 3.<?\ 392 IVARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT .PlJItt 'l IASUS ONI.Y) S NG 3,793 395 1 VsNG 454,004 384.6 340.3 1s Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoafPetCoke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Heat Content Sulfur ContentEnergy Source Ash Content Mercury Firm or Content Interrupt- Prcdominant Secondary Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLYj (VARIOUS (NATURAL GAS SPOT Purchases onlyj s NG 1 F PL S ING F PL 9"/ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Coal Mine Name Contract Type Contract Expiration Date Energy Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VAKIOl IS (NATURAL GAS SPOT PURtnASUS ONLY) s NG NGS 4 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Mover Id Status Energy Source Quantity Type Of Sulfur Content, (petroleum and coal only,to nearest 0.01%) Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Ash Content, (coal only,to nearest 0.1%) Units If Energy source reported is OTI-I,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type OfUnits Avg Heat Content, (as burned) (MMBlu per ton, barrel,or Met) 1 .0(1(1(1orNG457,797 Mcf : If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units PriorMonth's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Slocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) t Met"NG 457,797 457,797 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month 7 Plant:7953 Evander Andrews Power ComplexFormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reportedon SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) 9' Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p|ant;7953 Evander Andrews Power Complex Month 7 Form EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) $GT 42,239 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:7953 Evander Andrews Power Complex Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Source Unit Code Gross Generation (MWh)Net Generation (MWh) L b Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part CommentsItem Approx $833k Tran/Reser is included for all three plants.2 6 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:7953 Evander Andrews Power Complex Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plarit:55733 Bennett Mountain Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Subvnil By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise cliobbs@idaliopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Hendetson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For TTCompanyName Plant Name Idaho Power Co OBennettMountain Plant ID Plant Address Plant City 55733 Plant County Elmore r- 1015 West Hays St. 03MountainHomePlantStateID CHP XYes No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|X YesRegulated No Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 7 Form EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) N No Receipts Is there a fuel tolling agreement in place for this plant? Receipts All Fuels Contract Information Complete for All Fuels Cost per Unit All Fuels Supplier Quantity Total Delivered Cost Commodity Cost (coal,natural gas Contract Type Contract Expiration Date Energy Source Solids:Tons Liquids:Barrels(MMYY)Cents per MMBtu,to the nearest 0.1 cents Gases:MCF Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Sulfur Content AshHeat Content Mercury Firm or Content Interrapt- Prcdoniinant Secondary Source Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to tiansport fuel over the second longest distance (MMBtus)0.01% 0.01%0.01%per unit Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plar)t:55733 Bennett Mountain Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Coal Mine State Energy Source Coal Mine CountyMSHAIDType (MMYY) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for FIRSGs in duct burners.Report consumption in combustion turbines or 1C engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during Ihis reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Sulfur Ash Content, (coal only,to nearest 0.1 %) Avg Heat Content, (as burned) (MMBtuperton, barrel,or Met) Source Units Content, (petroleum and coal only,to nearest 0.01%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form Approval OMB No.1905-0129 Approval Expires 12/3 1/20 1 3 U.S.Department of Energy Energy information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:7 Form EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). I (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type Of Units Avg Heat Content, (as burned) (MMBlu per ton, barrel,or Met) I CKKU*NG McfGT178,066 0 If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Current Month's Receipts Prior Month's Ending Stocks Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) <"2 Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant;55733 Bennett Mountain Month.7 Form EIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fileled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten of the instructions), Prime Mover Generator Gross GenerationGenerator Status Net Generation Id (MWh)(MWh) & Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 Plant:55733 Bennett Mountain Month.7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) -0 17,435 (MWh) 0GT 7 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Source Unit Code Gross Generation (MWh)Net Generation (MWh) \5'° Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:55733 Bennett Mountain Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 Approx $833k Tran'Rcssr is included for all three plants.6 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month 7 Form EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant 57028 Langley Gulch Power Plant Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Contact Cheryl Hobbs Title Joint Venture Accountant Accept By Accept Date PO Box 70Address City/Slate/Zip Boise chobbs@idaliopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/Stale/Zip Email Boise rhendcrsonftpidahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Langley Gulch Power Plant Plant Counly Interstate 84 and Highway 30 New Plymouth Company Name Plant Name Plant ID CJb.57028 PAYETTE Plant Address i>Plant City Plant State ID XCHP ¦a*1"' ^•e gat Yes No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923;noRegulatedXYes 8)27' \V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant 57028 Langley Gulch Power Plant Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Receipts Costper Unit All Fuels Contract Information Complete for All Fuels All Fuels Quantity Total Delivered Cost Commodity Cost (coal,natural gas Supplier Contract Type Contract Expiration Date Energy Source Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents (MMYY) Gases:MCF N 1*fVarious(natural gas spot I'UKC'I IASES ONI V) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 392.1,10,232 395 1SNG 1,224,638 384.6 340.3NGS Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plarit:57028 Langley Gulch Power Plant Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants SO megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transpoitation Natural Gas Only All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Supplier Contract Type Contract Expiration Date Energy Sulfur Content Ash Mercury Firm or Content Interrupt- PrcdominantHeat Content Secondary ModeSourceModeContent Percent weight to nearest Percent weight to nearest 0.01% ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01% VARIOUS (NATURAL GAS SPOT PURCHASES ONI.Yj VARIOUS (NATURAL GAS SPOT 'PURCHASES ONI.Yj S NG I F PL S NG I F PL Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p'ant 57028 Langley Gulch Power Plant Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Coal Mine Coal Mine State Supplier Contract Type Contract Expiration Date Coal Mine Type Coal Mine Name Coal Mine County Energy Source MSHA ID (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLYI VARUM IS (NATURAL GAS SPOT PURCHASES ONLY) NGS NGS Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Tf this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s f 1 (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Quantity Sulfur Content, (petroleum and coal only,to nearest 0.01%) Prime Boiler Status Mover Id Energy Source Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Ash Units Content, (coal only,to neaiest 0.1 %) McfCA1NOOP0 0 IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify b V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Plant.57028 Langley Gulch Power PlantFormEIA-923 Month 7 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Type OfUnitsQuantity Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) i.oooo!NGCT 1,234,869 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify u Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 plant:57028 Langley Gulch Power Plant Month 7 OMB No.1905-0129 Approval Expires 1 2/3 1/20 13FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE ENI)OF THE REPORTING PERIOD AND THE DATA BALANCE (Inslruclions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Slocks held olT-site that cannot be assigned to an individual plant arc to he reported as stocks held at a central storage site.Each central storage site must be reported separately,New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units PriorMonth's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) ?NG Met 1,234,870 1,234,869 00 Au Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report 2013 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 12/31/2013 Year: Form EIA-923 Month:7 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Prime Mover Generator Generator Status Net GenerationGrossGeneration Id (MWh)(MWh) CA STG OP 0 u Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month.7 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) l74-826 A (MWh) 171.0X9CI \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,anf 57028 Langley Gulch Power Plant Month:7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source 0\\y Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p,ant:57028 Langley Gulch Power Plant Month;7 OMB No.1905-0129 Approval Expires 12/3 1/20 1 3FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx $K33k Tran/Reser is included for nil three plants26 \\V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2013 p|ant:57028 Langley Gulch Power Plant Month 7 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code