Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 30.pdfForm Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month:^Year 2QJ6 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex Form EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 (JSC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit DateContactCherylHobbs Title Joint Venture Accountant Address PO Box 70 City/State/Zip Email Boise ID 83707 chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Title Address Randy Henderson Operations Finance Leader Box 70 City/Stale/Zip Email Boise rhenderson@idahopower com ID 83707 Phone (208)388-2290 Fax (208)388-2521 Report For aCompanyNameIdahoPowerCo Plant Name Plant ID Plant Address 1 862 NW Mt Home Hwy Dist Rd Plant City uEvanderAndrewsPowerComplex Plant County X7953 1MountainHomePlantStateID nYes NoRegulatedX For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|Y"r~x No CLIP \9/ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Contract Expiration Dale Energy SourceTypeor Tolling Agreement (MMYY) 1 3\(VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 3.460 162 I 159 1 'I 211 9VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NG \201,956 247 X <? y Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Unavailable Mode Mode Percent weight to nearest 0 01% Percent weight to nearest Million Btus Quantity (MMBtus) per unit Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% AVARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 3466 I PL FFIIYesnYes fx]No fxl No ,\ISNG201956 PL F FIIYes?Yes fx]No [~xl No 9 Form ApprovalU.S.Department of Energy Energy Information Administration Month:^Year 2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Source Quantity Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID Type Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Energy Quantity Consumed Units Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) Sulfur Content, (petroleum and coal only,to nearest 0 01%) Ash Code Source Content, (coal only,to nearest 0 I %) Specify other fuel: h Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) 1/ Y Form ApprovalU.S.Department of Energy Energy Information Administration Month ^Year 2QJ5 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) \a 18,80610000GTGTNG205,422 Met'Y 18,926 <2 Specify other fuel: Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Energy Source Quantity Consumed Units Average Heat Content EIAUSE (High Healing Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code ID Code (MWh)(MWh) % Form ApprovalU.S.Department of Energy Energy Information Administration Month:^Year 2Qjg Monthly ETA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. B CA D E Prime Mover Energy Source Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh) 1 ? Form ApprovalU.S.Department of Energy Energy Information Administration Month:^Year Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for Adjustments Source Year Stocks A B C D E F G H Met'NG 205,422 205,422 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly E1A923 Power Plant Operations Report 6 Year:2016 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/20 1 7FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity oTFuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 p|ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule ItemPart 661K of reservation/transportaion fees are included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments w V Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Prime Equipment Type Fuel Schedule Mover Purchase RangesErrorNumber&Description Override CommentSupplierRptMonthID 9/ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 p|ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Title Joint Venture Accountant PO Box 70Address City/State/Zip Email Boise chobbs@idahopower com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy HendersonContact Operations Finance Leader Box 70 Title Address City/State/Zip Boise ID 83707 Email rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Idaho Power Co Plant Name Plant ID JBennettMountain 55733 1015 West Hays St Mountain Home Plant County Elmore boPlantAddress Plant City •J2 W /Plant State ID ?Yes NoRegulated cForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923?Yes Xl NoCLIP 0-\ Form ApprovalU.S.Department of Energy Energy Information Administration Mont|v Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0 1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Source Liquids:BarrelsTypeorGases:MCFTolling Agreement (MMYY) f Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight to nearest 0 01% Million Btus Quantity (MMBtusJ per unit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% ?Yes I I Yes ?No ?No Q. <? Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Source Quantity Coal Mine Coal Mine State Coal Mine Coal Mine Name Coal Mine CountyFuelSupplierTypeMSHAIDType ?1 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Energy Quantity Consumed Units Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) Sulfur Ash Code Source Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0 1 %) Specify other fuel 4 Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 Plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Prime Mover Peaking Unit Gross Generation Net GenerationContentCode(Yes/No)(MWh)(MWh)(as burned) (MMBtu per ton, barrel,or Mcf) I 0 27,948GTNG303,384 Mcf I 0000 GT 28,038 Specify other fuel: A9 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov GenerationFuelConsumption Prime Boiler/Boiler Mover Generation Status EIA USE ONLY Energy Source Quantity Consumed Units Average Heat Content ETA USE (High Heating Value)ONLY (Gioup code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month GenerationID Code Code (MWh)(Group code)ID (MWh) $£ Form ApprovalU.S.Department of Energy Energy Information Administration Moiid, Monthly EIA923 Power Plant Operations Report 6 Year.2016 Plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh)Energy Source /»¦ X *\ V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report ft Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Adjustment to Slocks End of Month/Consumption Fuel Balance Comments for Adjustments Source Year Stocks A B C D E F G H .1*% Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Quantity ot'Fuel Shipped to PlantPlantIDPlantNameFuelType B C DA Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCFIEDULE 9.are on page 20.) Schedule Part Item 661k ofreservation/transport fees are included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover Ranges Override CommentRptMonthSupplierErrorNumber&DescriptionID A U.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 6 Year:2016 p,ant:55733 Bennett Mountain Form Approval Month:OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3 I 1/ Form ApprovalU.S.Department of Energy Energy Information Administration Momlr Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Flobbs Submit Date Title Joint Venture Accountant Address PO Box 70 City/State/Zip Email Boise ID 83707 chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Box 70Address City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 Phone (208)388-2290 Fax (208)388-2521 3ReportFor Company Name Plant Name Plant ID Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth 57028 PAYETTE k>cJ APlantAddress Plant City Plant State ID V I J:i :x.Yes NoRegulated AForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923?Yes X NoCHP L Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0 1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Source Liquids:BarrelsTypeor Tolling Gases:MCF Agreement (MMYY) %ift f -159.1VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 22,414 162 1 ^247.8 '3 2119\1,277,217SNG f1 i 276 5SNG\28,691 237 3f£ L ' Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 planl:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Ash Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Predominant Secondary Mode Supply Delivery Contract Contract Chtunde ModeUnavailablePercentweight to nearest Type Type Million Btus Quantity (MMBtus) per unit Percent weight to nearest 0,01% Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Parts per Million,or enter 999 if not available Fuel Supplier Purchase Energy Type Source 0 01% 1 i s'VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY! VARIOUS (NATURAL GAS SPOT PURCHASES ONI Y) NG 22414S 1 PL F FIIYesIIYes [x]No [x]No NGS 1277217 1 PL F FIIYesIIYes [xl No I x No NGS 2869 1 I PL I I?Yes Q]Yes [xl No [x]No V Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Source Quantity Coal Mine MSHA ID Coal Mine State Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type A I / Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption EIA USE ONLY (Group Code) Report Month Prime Mover Boiler Id Boiler Status Energy Quantity Consumed Units Sulfur AshAvgHeat Content (High Heating Value) (MMBtu per ton, barrel,or Met) Code Source Content, (petroleum and coal only,to nearest 0 01 %) Content, (coal only,to nearest 0 1%) Specify other fuel 6 1/ Form Approval OMBNo.1905-0129 Approval Expires 05/31/2017 U.S.Department of Energy Energy Information Administration M„nth Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) (jI Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 p|ant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type Of Units Avg Heat Content (as burned) (MMBtu per ton, barrel,or Met) Prime Mover Code Peaking Unit Gross Generation Net Generation (Yes/No)(MWh)(MWh) L Specify other fuel: I Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plailt:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation ETA USE ONLY Prime Boiler/Boiler Mover Generation Status Energy Source Quantity Units Consumed Average Heat Content EIAUSE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code TD Code (MWh)(MWh) Jj?l3 189.410t9iCAOPNGI0McfI00001CTGTGOP193,006 ^1328322 Mcf 0GTGICTOPNG1000IICASTGOP01 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year.2016 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Unit Code (nuclear units) Energy Gross Generation (MWh)Net Generation (MWh) Source Q/ L Form ApprovalU.S.Department of Energy Energy Information Administration Mont|y Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero ifthe plant has no slocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below. UnitsEnergy Source Previous Month/ Year Slocks Purchases Consumption Adjustment to Stocks End of Month/Fuel Balance Comments for Adjustments Year Stocks A a c D E F G H NG Met"1,328,322 1,328,322 0 0 ,1° (/ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant A B C D u Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 5 Year.2016 plant'57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item $66 lk reservation/transportation fees are included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments 1'\ Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 6 Year:2016 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover Rpt Month Supplier Error Number &Description RangesID Override Comment $u Form ApprovalU.S.Department of Energy Energy Information Administration Monttr Monthly EIA923 Power Plant Operations Report 6 Year:2016 plallt:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 3