HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 30.pdfForm Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month:^Year 2QJ6
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex
Form EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 (JSC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit DateContactCherylHobbs
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip
Email
Boise ID 83707
chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact
Title
Address
Randy Henderson
Operations Finance Leader
Box 70
City/Stale/Zip
Email
Boise
rhenderson@idahopower com
ID 83707
Phone (208)388-2290 Fax (208)388-2521
Report For
aCompanyNameIdahoPowerCo
Plant Name
Plant ID
Plant Address 1 862 NW Mt Home Hwy Dist Rd
Plant City
uEvanderAndrewsPowerComplex
Plant County X7953
1MountainHomePlantStateID
nYes NoRegulatedX
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923|Y"r~x No
CLIP
\9/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons
Liquids:Barrels
Gases:MCF
Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0 1 cents
Fuel Supplier Name Purchase Contract
Expiration
Dale
Energy
SourceTypeor
Tolling
Agreement (MMYY)
1
3\(VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S NG 3.460 162 I 159 1
'I 211 9VARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
S NG \201,956 247 X <?
y
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Type Type
Chloride
Unavailable Mode Mode
Percent weight
to nearest
0 01%
Percent weight
to nearest
Million Btus
Quantity (MMBtus)
per unit
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
AVARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 3466 I PL FFIIYesnYes
fx]No fxl No
,\ISNG201956 PL F FIIYes?Yes
fx]No [~xl No
9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:^Year 2016
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy
Source
Quantity Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID Type
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy Quantity
Consumed
Units Avg Heat
Content
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0 01%)
Ash
Code Source Content,
(coal only,to
nearest 0 I %)
Specify other fuel:
h
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
1/
Y
Form ApprovalU.S.Department of Energy
Energy Information Administration Month ^Year 2QJ5
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type OfUnits Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net Generation
Code (Yes/No)(MWh)(MWh)
\a
18,80610000GTGTNG205,422 Met'Y 18,926
<2
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity
Consumed
Units Average Heat Content EIAUSE
(High Healing Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
%
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:^Year 2Qjg
Monthly ETA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
B CA D E
Prime
Mover
Energy
Source
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)
1
?
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:^Year
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for Adjustments
Source Year Stocks
A B C D E F G H
Met'NG 205,422 205,422 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly E1A923 Power Plant Operations Report
6 Year:2016 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/20 1 7FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity oTFuel Shipped to Plant
A B C D
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p|ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule ItemPart
661K of reservation/transportaion fees are included for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
w
V
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Prime Equipment
Type Fuel Schedule Mover
Purchase
RangesErrorNumber&Description Override CommentSupplierRptMonthID
9/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p|ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit DateContact
Title Joint Venture Accountant
PO Box 70Address
City/State/Zip
Email
Boise
chobbs@idahopower com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy HendersonContact
Operations Finance Leader
Box 70
Title
Address
City/State/Zip Boise ID 83707
Email rhenderson@idahopower com Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name Idaho Power Co
Plant Name
Plant ID JBennettMountain
55733
1015 West Hays St
Mountain Home
Plant County Elmore
boPlantAddress
Plant City •J2 W /Plant State ID
?Yes NoRegulated
cForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923?Yes Xl NoCLIP
0-\
Form ApprovalU.S.Department of Energy
Energy Information Administration Mont|v
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0 1 cents
Cents per MMBtu,to
the nearest
0 1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy
Source Liquids:BarrelsTypeorGases:MCFTolling
Agreement (MMYY)
f
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChlorideModeModeUnavailablePercentweight
to nearest
0 01%
Million Btus
Quantity (MMBtusJ
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
?Yes I I Yes
?No ?No
Q.
<?
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy
Source
Quantity Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
CountyFuelSupplierTypeMSHAIDType
?1
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy Quantity
Consumed
Units Avg Heat
Content
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur Ash
Code Source Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0 1 %)
Specify other fuel
4
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain
Form EIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 Plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type OfUnits Avg Heat Prime Mover Peaking Unit Gross Generation Net GenerationContentCode(Yes/No)(MWh)(MWh)(as burned)
(MMBtu per ton,
barrel,or Mcf)
I 0 27,948GTNG303,384 Mcf I 0000 GT 28,038
Specify other fuel:
A9
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
GenerationFuelConsumption
Prime Boiler/Boiler
Mover Generation Status
EIA USE
ONLY
Energy
Source
Quantity
Consumed
Units Average Heat Content ETA USE
(High Heating Value)ONLY
(Gioup code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month GenerationID
Code Code (MWh)(Group code)ID (MWh)
$£
Form ApprovalU.S.Department of Energy
Energy Information Administration Moiid,
Monthly EIA923 Power Plant Operations Report
6 Year.2016 Plant:55733 Bennett Mountain
OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
/»¦
X *\
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
ft Year:2016 plant:55733 Bennett Mountain
OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Energy Units Previous Month/
Year Stocks
Purchases Adjustment to
Slocks
End of Month/Consumption Fuel Balance Comments for Adjustments
Source Year Stocks
A B C D E F G H
.1*%
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Quantity ot'Fuel Shipped to PlantPlantIDPlantNameFuelType
B C DA
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCFIEDULE 9.are on page 20.)
Schedule Part Item
661k ofreservation/transport fees are included for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover Ranges Override CommentRptMonthSupplierErrorNumber&DescriptionID
A
U.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p,ant:55733 Bennett Mountain
Form Approval
Month:OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3
I
1/
Form ApprovalU.S.Department of Energy
Energy Information Administration Momlr
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Flobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip
Email
Boise ID 83707
chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Box 70Address
City/State/Zip
Email
Boise
rhenderson@idahopower.com
ID 83707
Phone (208)388-2290 Fax (208)388-2521
3ReportFor
Company Name
Plant Name
Plant ID
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
57028 PAYETTE k>cJ APlantAddress
Plant City Plant State ID V I
J:i
:x.Yes NoRegulated
AForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923?Yes X NoCHP
L
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0 1 cents
Cents per MMBtu,to
the nearest
0 1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy
Source Liquids:BarrelsTypeor
Tolling Gases:MCF
Agreement (MMYY)
%ift f -159.1VARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S NG 22,414 162 1
^247.8 '3 2119\1,277,217SNG f1
i 276 5SNG\28,691 237
3f£
L '
Form Approval
OMB No.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 planl:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Ash Content Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Predominant Secondary
Mode
Supply Delivery
Contract Contract
Chtunde ModeUnavailablePercentweight
to nearest
Type Type
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
0,01%
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Parts per
Million,or
enter 999 if
not available
Fuel Supplier Purchase Energy
Type Source 0 01%
1
i s'VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY!
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONI Y)
NG 22414S 1 PL F FIIYesIIYes
[x]No [x]No
NGS 1277217 1 PL F FIIYesIIYes
[xl No I x No
NGS 2869 1 I PL I I?Yes Q]Yes
[xl No [x]No
V
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy
Source
Quantity Coal Mine
MSHA ID
Coal Mine
State
Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Fuel Supplier Type
A
I /
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy Quantity
Consumed
Units Sulfur AshAvgHeat
Content
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Code Source Content,
(petroleum and
coal only,to
nearest 0 01 %)
Content,
(coal only,to
nearest 0 1%)
Specify other fuel
6
1/
Form Approval
OMBNo.1905-0129
Approval Expires 05/31/2017
U.S.Department of Energy
Energy Information Administration M„nth
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
(jI
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p|ant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type Of Units Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Met)
Prime Mover
Code
Peaking Unit Gross Generation Net Generation
(Yes/No)(MWh)(MWh)
L
Specify other fuel:
I
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plailt:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
ETA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity Units
Consumed
Average Heat Content EIAUSE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code TD Code (MWh)(MWh)
Jj?l3 189.410t9iCAOPNGI0McfI00001CTGTGOP193,006
^1328322 Mcf 0GTGICTOPNG1000IICASTGOP01
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year.2016 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as
purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
A B C D E
Prime
Mover
Unit Code
(nuclear units)
Energy Gross Generation (MWh)Net Generation (MWh)
Source
Q/
L
Form ApprovalU.S.Department of Energy
Energy Information Administration Mont|y
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column G:Ending Month/Year Stocks:
-Enter zero ifthe plant has no slocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column C,D,and E:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column F:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use.
-Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
UnitsEnergy
Source
Previous Month/
Year Slocks
Purchases Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for Adjustments
Year Stocks
A a c D E F G H
NG Met"1,328,322 1,328,322 0 0
,1°
(/
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plant:57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
u
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
5 Year.2016 plant'57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
$66 lk reservation/transportation fees are included for all three plants.2 6
Generator Retirement Dates
Retirement
Month
Retirement
Year
Changes in Ownership (Provide name of purchaser and date sold.)
Generator Id Comments
1'\
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
6 Year:2016 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Type Fuel Schedule Mover Rpt Month Supplier Error Number &Description RangesID Override Comment
$u
Form ApprovalU.S.Department of Energy
Energy Information Administration Monttr
Monthly EIA923 Power Plant Operations Report
6 Year:2016 plallt:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
3