HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 27.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:7953 Evander Andrews Power Complex
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Contact Cheryl Hobbs
Joint Venture AccountantTitle
Accept By
Accept Date
PO Box 70Address
City/Slate/Zip Boise ID 83707
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
City/State/Zip
Email
Boise ID 83707
rhenderson(£yidahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
<Idaho Power Co
Evander Andrews Power Complex
Plant County
1 862 NW Mt Home Hwy Dist Rd
Mountain Home
Company Name
Plant Name
Plant ID 7953
Plant Address
Plant City Plant State ID
YesCMP X No I zForcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.htmi#eia-923 7/2?Regulated
arVrX|Yes No
¦
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants SO megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All FuelsAllFuels
Supplier Quantity Total Delivered
Cost
Contract Type Contract
Expiration
Date
Energy
Source
Commodity
Cost (coal,natural gas
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
(MMYY)
Gases:MCF
355.XVARIOUS(NATURAL GAS SPOT 125,244SNG 414 8!v ¦PURCHASES ONLY)
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month.6
Form EIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
Natural GasCoal,Pet Coke,OilAllFuels Coal,Pet Coke and OilCoalOnly
Only
Supplier Contract Type Contract
Expiration
Date
Energy Heat
Content
Sulfur Content Ash Mercury Firm or
Content Interrupt-
Prcdominant
Mode
Secondary
Source Content Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
0.01%per unit 0.01%
VARIOUS (NATURAL GAS SPOT
I'URCTIASI-S ONLY)
S 1NG F PL
r
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month 5
Form EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
County
Energy
Source MSHA ID Type
(MMYY)
VARIOUS (NATURAL GAS SPOT
JMJKCHASES ONLY)
S NG
<£>
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 6
Plant:7953 Evander Andrews Power ComplexFormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Sulfur AshEnergy
Source
Quantity Type Of
Units
Avg Heat
Content,
(as burned)
(MMBtti per ton,
barrel,or Met)
Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
?
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
&5-
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant;7953 Evander Andrews Power Complex
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please clieck.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
Quantity Type OfUnits Avg Heat
Content.
(as burned)
(MMBtu per ton,
barrel,or Met)
\Mcf[001)GT NG 125,244 1.0
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
gr
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 Plant:7953 Evander Andrews Power Complex
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEJA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil Jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment ifthe balance does not equal zero.
Prior Month's
Ending Stocks
Energy Source Type Of
Units
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
McfNG 125,244 125,244 00
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fiieled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy .sources on SCHEDULE 5 PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if netgeneration is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions),
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:7953 Evander Andrews Power Complex
Month:6
OMB No.1905-0129
Approval Expires 12/3 1 /20 1 3FormElA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Net GenerationGrossGeneration
MWh)(MWh)40I 563GT11,623 II.V/
IP
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:7953 Evander Andrews Power Complex
Month (j
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Unit Code Gross Generation (MWh)Net Generation (MWh)Energy
Source
zz
a
U.S.Department of Energy
Energy Information Administration
Form ApprovalEIA923PowerPlantOperationsReport
2013 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 12/31/2013
Year:
Form EIA-923
Month 6
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
2 Approx S7H7k ofreservation/tranportation expense for all three plants is included6
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
2013 plar|t:7953 Evander Andrews Power Complex
Form Approval
Year:OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Month:g
Errors
Purchase
Type
Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeId
Code
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month 5
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Cheryl HobbsContact
Title Joint Venture Accountant
Accept By
Accept Date
PO Box 70Address
City/Statc/Zip
Email
Boise
chobbs@idahopower.com
JD 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance LeaderTitle
Box 70Address
City/State/Zip Boise
rhenderson@idahopower.com
ID 83707
Email (208)388-2290 (208)388-2521FaxPhone
3$Report For
Idaho Power CoCompanyName
Plant Name Bennett Mountain
Plant ID 55733 Plant County Elmore
Plant Address 1015 West Hays St.
Plant City Mountain Iloirie Plant State ID
*CHP Yes No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
JRegulatedxYesNo
Yev\twt\
V Am-
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
IN No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Quantity Total Delivered
Cost
Supplier Contract Type Commodity
Cost (coal,natural gas
Contract
Expiration
Date
Energy
Source
Solids:Tons
Liquids:Barrels(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
n
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality of Fuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Energy
Source
Sulfur Content AshContract
Expiration
Date
Heat
Content
Mercury Firm or
Content Interrupt-
Prcdominant Secondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
0.01%(MMBtus)
per unit 0.01%0,01%
CP
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant 55733 Bennett Mountain
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 511 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Coal Mine Coal Mine Coal Mine
State
Coal Mine
County
Supplier Contract Type Contract
Expiration
Date
Coal Mine
Name
Energy
MSHA ID TypeSource
(MMYY)
<P
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Tf applicable,please check.)Did any boiler produce steam forpurposes other than electric power generation during this reporting period?
Sulfur AshPrimeBoilerStatus
Mover Id
Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Energy
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please check.)Was steam pioduced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy
Source
QuanliLy Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
A 1111)110GTNG122,540 Mcf
1
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
or
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oilJet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero.
Slocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Current Month's
Ending Stocks
Adjustments
To Stocks
Comment (ifbalance is not zero please enter a comment)Energy Source Type Of
Units
Prior Month's
Ending Slocks
Current Month's
Receipts
Current Month's
Consumption
Balance
<P
-3
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
2013 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 12/31/2013
Year:
Form EIA-923
Month;g
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,TC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5,PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
Gross Generation NetGenerationPrime
Mover
Generator Generator
StatusId (MWh)(MWh)
^5°
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Month:g
OMB No.1905-0129
Approval Expires 12/31/2013FormElA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
10,258GT10,318
<T->
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:55733 Bennett Mountain
Monti 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Gross Generation (MWh)Net Generation (MWh)Prime
Mover
Energy
Source
Unit Code
c?
Form ApprovalEIA923PowerPlantOperationsReport
Year.2013 plant 55733 Bennett Mountain
Month:6
U.S.Department of Energy
Energy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 9.COMMENTS
CommentsItemPartSchedule
IApproxS7N7kofreservation/tranportation expense for all three plants is included26
<2P
U.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
2013 plant 55733 Bennett Mountain
Form Approval
Year:OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Month:£
Errors
Purchase
Type
Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Enor Description/
Override CommentType
Code
Id
<5P
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant 57028 Langley Gulch Power Plant
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise
cliobbs@idahopower.com
ID 83707
Email Phone (208)388-5614 Fox (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
Box 70Address
City/State/Zip
Email
Boise ID 83707
ihendersoin7ridahopovvei.com (208)388-2290 Fax (208)388-2521Phone
Report For
Company Name
Plant Name
Plant ID
Plant Address
Plant City
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
57028 PAYETTE
vVPlantStateID
*Yes
,X Yes
CHP No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
NoRegulated
7fa
7/M//3
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p'ant:57028 Langley Gulch Power Plant
Month:6
OMB No.1905-0129
Approval Expires 12/31/2013FormElA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts 'Is there a fuel tolling agreement in place for this plant?
Receipts
All Fuels
Cost per UnitContractInformation
Complete for All Fuels All Fuels
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas
Supplier Contiact Type Contract
Expiration
Date
Energy
Source
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
(MMYY)
Gases:MCF
%-414 S 1/-|'35S-«jVARIOUS(NATURAL GAS SPOT
PURCHASES ONLY)\1,067,823NGS
c
Form ApprovalUS.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p'ant:57028 Langley Gulch Power Plant
Month 5
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
SulfurContentEnergy
Source
Heat
Content
Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus(MMYY)Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
S NG 1 F PL
c
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month:5
OMBNo.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
[fyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Coal Mine
MSHA ID
Coal Mine
Type
Coal Mine
State
Coal Mine
County
Contract
Expiration
Date
Energy Coal Mine
NameSource
(MMYY)
VARIOUS (NATURAL OAS SPOT
jpyjlUIASUS ONLY)
s NG
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormE1A-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam forpurposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover [d
Sulfur AshEnergyQuantityTypeOfAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Source Content,
(coaJ only,to
nearest 0.1%)
OP McfCA1NG0 0
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
c~
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p|ant:57028 Langley Culch Power Plant
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
[(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
Source
A I oooofSiCTNO1,067,823 Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
r
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p'arit;57028 Langley Gulch Power Plant
Month 6
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
c NG Met 1,067,823 1,067,823 0 0
\
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
Form EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-elcctric turbines),and steam turbine plants with less than 10 megawatts
total capacityor fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CLIP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (sec page ten ofthe instructions).
Primc
Mover
Generator Gcncratoi
Status
Gross Generation Net Generation
Id (MWh)(MWh)
CA STG OP 0
r
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report '
OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:5
Plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
0 150,386
(MWh)
ftCI
%
Form Approval
OMB No.1905-0129
Approval Expires 12/31/2013
U.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013
Month 5
Plant:57028 Langley Gulch Power Plant
Form EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit Code Gross Generation (MWh)Net Generation (MWh)Energy
Source
]
c
o
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 p,ant:57028 Langley Gulch Power Plant
Month:5
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Approx S787k of reservation/tranportation expense for all three plants is included26
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2013 plant:57028 Langley Gulch Power Plant
Month g
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeType
Code
Id