Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 21.pdfForm ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise chobbs@idahopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Operations Finance Leader Address Box 70 City/State/Zip Boise rhenderson@idahopower.com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For Idaho Power CoCompanyName PlantName Plant ID Plant Address Plant City Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home 7953 Plant State ID s Yes ?NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923riv"a No CHP v Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0 1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy Source Liquids:BarrelsTypeor Tolling Oases:MCF Agreement (MMYY) $\.97VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) ---39,692SNG 72.1 Form ApprovalU.S.Department ofEnergy Energy Information Administration Month.^Year 2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Ash Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Supply Delivery Contract Contract Type Type Average Heat Sulfur Content Content Predominant SecondaryChloride Unavailable Mode Mode Percent weight to nearest 0.01% Million Btus Quantity (MMBtus) per unit Percent weight to nearest Mode used to transport fuel over the longest distance Parts per Million,or enter 999 if not available Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 1^39*692 IVARIOUS (NATURAL GAS SPOT PURCHASES ONLY} S NG PL F FIIYesIIYes fx]No fx]No o Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Energy Quantity Source Coal Mine State Coal Mine Coal Mine Coal Mine Name Coal Mine County Fuel Supplier Type MSHA ID Type O Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Boiler IdEIAUSE ONLY (Group Code) Report Month Prime Mover Boiler Status Quantity Consumed UnitsEnergy Source Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) Sulfur Ash Code Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0 1%) Specify other fuel: ^9 Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Form EIA-923 Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Month' Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) ^"l_M99\3iVIGTNG^39,692 Mcf 1 0000 GT Y ^-3,619 Specify other fuel: <=9 > Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY (Group code) Energy Source Quantity Consumed Units Average HeatContent EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation Code ID Code (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration Mon[h:^Year 2016 Monthly EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Energy Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh) Source -<0 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Coal: Residual Oil: Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Column G:Ending Month/Year Stocks: -Enter zero ifthe plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Energy Units Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End ofMonth/Fuel Balance Comments for Adjustments Source Year Stocks A B C D E F G H NG Mcf J*y -39,692 p ^_39,692 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration M0nth Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMBNo.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution ofcoal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name of the plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approximately S564K of reservation/trasportion charges are included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments e Form ApprovalU.S.Department ofEnergy Energy Information Administration Month' Monthly EIA923 Power Plant Operations Report 4 Year:2016 planl:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover Rpt Month Supplier Error Number &Description RangesID Override Comment <13 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 o Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain Form EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Cheryl Hobbs Submit DateContact Title Joint Venture Accountant Address PO Box 70 City/State/Zip Boise chobbs@idahopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey A Contact Randy Henderson Title Operations Finance Leader Box 70Address City/State/Zip Boise rhenderson@idahopower.com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For Idaho Power CoCompanyName Plant Name Plant ID Bennett Mountain 55733 Plant County Elmore Plant Address 1015 West Hays St. Plant City Mountain Home Plant State ID ?Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Y"DD No CHP <0 Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost(coal,natural gas) Solids:Tons Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0.1 cents Fuel Supplier Name Purchase Type or Tolling Agreement Contract Expiration Date Energy Liquids:BarrelsSourceGases:MCF (MMYY) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Fuels Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Chloride Content Contract Information Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Type Type Chloride Mode ModeUnavailablePercentweight to nearestMillionBtus Quantity (MMBtus) perunit Percent weight to nearest Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance Fuel Supplier Purchase Energy Type Source 0.01% 0.01% I I Yes D Yes ?No ?No ..2) o Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCFIEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part 4)Coal Mine Information Purchase Energy Source Quantity Coal Mine MSHA ID Coal Mine State Coal Mine Coal Mine Name Coal Mine CountyFuelSupplierTypeType V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Prime MoverEIAUSE ONLY (Group Code) Report Month Boiler Id Boiler Status Energy Source Quantity Consumed Units Avg Heat Content (High Heating Value) (MMBtu per ton, barrel,or Met) Sulfur Ash Code Content, (petroleum and coal only,to nearest 0 01%) Content, (coal only,to nearest0.1%) Specify other fuel: Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Prime Mover Peaking Unit Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) 3.1£GT NG ^+8,102 Mcf 1 0000 GT Y —+,455f-f Specify other fuel: S3P Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation Prime Boiler/Boiler Mover Generation Status EIA USE ONLY Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code ID Code (MWh)(MWh) V Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plar>t:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types ofplants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A B C D E Prime Mover Energy Source Unit Code (nuclear units) Gross Generation (MWh)Net Generation (MWh) 1J3 Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. Units Previous Month/ Year Stocks Energy Purchases Consumption Adjustment to Stocks End of Month/ Year Stocks Fuel Balance Comments for Adjustments Source A B C D E F G H O Form ApprovalU.S.Department of Energy Energy Information Administration Month. Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity of Fuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Short Tons Barrels Barrels Short Tons Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D Form ApprovalU.S.Department of Energy Energy Information Administration Monlh Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Approx $564k of reservation/transportion are included for all three plants.2 6 Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name of purchaser and date sold.) Generator Id Comments Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 4 Year:2016 plar>t:55733 Bennett Mountain OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 ERRORS Purchase Prime Equipment Type Fuel Schedule Mover ID Rpt Month Supplier Error Number &Description Ranges Override Comment U.S.Department ofEnergy Energy Information Administration Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:55733 Bennett Mountain Form Approval Month:OMBNo.1905-0129 Approval Expires 05/31/2017FormEIA-923 3 \ -C Form ApprovalU.S.Department of Energy Energy Information Administration Month- Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Contact Cheryl Hobbs Submit Date Title Joint Venture Accountant Address PO Box 70 DCity/State/Zip Boise chobbs@idahopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Title Address Operations Finance Leader Box 70 City/State/Zip Boise rhenderson@idahopower com ID 83707 Email Phone (208)388-2290 Fax (208)388-2521 Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Langley Gulch Power Plant 57028 Plant County Interstate 84 and Highway 30 New Plymouth PAYETTE Plant State ID ?Yes NoRegulated For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Yes s NoCHP r- ( Form ApprovalU.S.Department ofEnergy Energy Information Administration Mont|v Monthly EIA923 Power Plant Operations Report 4 Year:2016 p'ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS (Instructions for SCHEDULE 2.Page 1.are on page 3.) Contract Information Purchases Cost per Unit Quantity Total Delivered Cost Commodity Cost (coal,natural gas) Solids:Tons Liquids:Barrels Gases:MCF Cents per MMBtu,to the nearest 0.1 cents Cents per MMBtu,to the nearest 0 1 cents Fuel Supplier Name Purchase Contract Expiration Date Energy SourceTypeor Tolling Agreement (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 0 0 0 r \ Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION (Instructions for SCHEDULE 2.Page 2.are on page 4.) Contract Information Quality of Furls Received Fuel Transportation Natural Gas Mercury Content Moisture Mercury Mercury Chloride Contnet Content Unavailable Content Contract InformationChlorideContent Average Heat Sulfur Content Content Ash Content Predominant Secondary Supply Delivery Contract Contract Chloride Unavailable Mode Mode Percent weight to nearest Type Type Million Btus Quantity (MMBtus) per unit Percent weight to nearest Mode used to transport fuel over the second longest distance Parts per Million,or enter 999 if not available Mode used to transport fuel over the longest distance Fuel Supplier Purchase Energy Type Source 001% 0 01% VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG 0 I PL F FIIYesIIYes l~xl No fx]No r i / Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL COAL MINE INFORMATION (Instructions for SCHEDULE 2.Page 3.are on page 7.) Purchases (From Schedule 2,Part A)Coal Mine Information Purchase Coal Mine MSHAID Energy Source Quantity Coal Mine State Coal Mine Type Coal Mine Name Coal Mine County Fuel Supplier Type r \ £ Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Fuel Consumption Report Month Prime Mover Boiler IdEIAUSE ONLY (Group Code) Boiler Status Energy Source Quantity Consumed Units Avg Heat Content. (High Heating Value) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Content, (coal only,to nearest 0.1%) Code Content, (petroleum and coal only,to nearest 0.01%) Specify other fuel: r \ j' Form ApprovalU.S.Department of Energy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS FUEL CONSUMPTION AND GENERATION Generators with Nameplate Capacity 10MW or Above Generation Report Month Generator Gross Generation Net Generation Id (MWh)(MWh) r c Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES, INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR STORAGE Fuel Consumption and Generation Fuel Consumption Generation Prime Mover Energy Source Quantity Consumed Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Peaking UnitPrimeMover Gross Generation Net Generation Code (Yes/No)(MWh)(MWh) Specify other fuel: r i Form ApprovalU.S.Department ofEnergy Energy Information Administration Mont(, Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR COMBINED-CYCLE PLANTS Prime Mover CT CA Turbine Generators With Nameplate Capacity 10MW or Abov Fuel Consumption Generation EIA USE ONLY Prime Boiler/Boiler Mover Generation Status Energy Source Quantity Consumed Units Average Heat Content EIA USE (High Heating Value)ONLY (Group code) Prime Mover Generator Generator Status Gross Generation NetReport Month Report Month ID Generation (Group code)Code ID Code (MWh)(MWh) -26811CAIOP0McfNGI0.000 1 CT GTG OP 0 1 1 CT 0 McfGTGOPNG I1000 1 CA STG OP 0 0 r- \ & Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 3.PART D. GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES Complete an individual Schedule 3,Part D for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3C. -No fuel consumption is required for these types of plants. -Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat. -Report nuclear data by generating unt. -Complete a separate row for each prime mover type. A CB D E Prime Mover Unit Code (nuclear units) Gross Generation (MWh)Energy Source Net Generation (MWh) i S Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017FormEIA-923 SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE For Coal,Oil and Natural Gas Plants Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke. -Central fuel terminals are required to fill both Schedules 4A and 4B. Include back-up fuels,start-up,and flame stabilization fuels. Do not report stocks for waste coal,natural gas,waste oil,or biomass. Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report: Short Tons Barrels Distillate-Type Oils:Barrels Petroleum Coke:Short Tons Coal: Residual Oil: Column G:Ending Month/Year Stocks: -Enter zero if the plant has no stocks.Do not leave blank. -Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s). -Report each central fuel storage site separately -Identify the new storage sites for this schedule on Schedule 9:Comments. Column C,D,and E: -These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively. -These data are pre-populated on the online forms. Column F:Adjustments to Stocks: -Enter adjustments to stocks when the calculated fuel balance is not zero. -These adjustments may be either positive,negative (having a negative sign),or zero. -Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below. Column H:Fuel Balance: -For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks. -For natural gas,calculate the fuel balance as the difference between consumed and received natural gas. -If the fuel balance does not equal zero,enter an adjustment in Column F to balance the fuel use. -Explain any Column F adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below. UnitsEnergy Previous Month/ Year Stocks Purchases Consumption Adjustment to Stocks End ofMonth/ Year Stocks Fuel Balance Comments for Adjustments Source A B C D E F HG NG Mcf 0 0 0 0 r i Form Approval OMB No.1905-0129 Approval Expires 05/31/2017 U.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke. Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments. Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed. Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed. Column C:Fuel Type:Report fuel type using energy source codes. Column D:Quantity ofFuel shipped to Plant. -Report the quantity of fuel Shipped to Plant in the following units: Coal: Residual Oil: Distillate-Type Oils: Petroleum Coke: Short Tons Barrels Barrels Short Tons -Enter zero if no shipments were made to this plant this month. FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant A B C D r i Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 SCHEDULE 9.COMMENTS (Instructions for SCHEDULE 9.are on page 20.) Schedule Part Item Generator Retirement Dates Retirement Month Retirement Year Changes in Ownership (Provide name ofpurchaser and date sold.) Generator Id Comments r i r' Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Monthly EIA923 Power Plant Operations Report 4 Year:2016 plant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/3 1/2017FormEIA-923 ERRORS Prime Equipment Type Fuel Schedule Mover ID Kpt Month Purchase RangesSupplierErrorNumber&Description Override Comment r i N/° Form ApprovalU.S.Department ofEnergy Energy Information Administration Month Form EIA-923 Monthly EIA923 Power Plant Operations Report 4 Year.2016 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129 Approval Expires 05/31/2017 3 I £