Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 19.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Contact Cheryl Hobbs Title Joint Venture Accountant Accept By Accept Date PO Box 70Address City/Slate/Zip Email Boise chobbs@idahopower.com JD 83707 (208)388-5614Phone Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home HwyDist Rd Mountain Home Company Name Plant Name Plant ID 7953 Plant Address Plant City Plant State ID |Yes j *j No i X |Yes |J No ¦(VJCHP For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923Regulated R2 1 €>\A \ "6\\1 ccl <3 ^\ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) |N j No Receipts j Is there a fuel tolling agreement in place for this plant? Contract Information Complete forAll Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Quantity Total Delivered Cost Energy Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0 1 cents Gases:MCF \<L3?t[Various (natural gas spot PURCHASES ONLY! 4376.4 438.1SNG73 a V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Sulfur ContentEnergy Source Heat Content Ash Mercury Finn or Content Interrapt- Predominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% Various (natural gas spot PURCHASES OHIYi s NG 1 F PL M3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 plant 7953 Evander Andrews Power Complex Month:4 OMB No,1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Coal Mine State Energy Source Coal Mine CountyMSHAIDType (MMYY) (VARIOUS (NATURAL GAS SPOT (PURCHASES ONLY) S NG V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? -Sulfur Content, (petroleum and coal only,to nearest 0.01%) AshPrimeBoilerStatus Mover Id Type OfQuantity Avg Heat Content, (as bumcd) (MMBtu per ton, barrel,or Mcf) Energy Source Unds Content, (coal only,to nearest 0.1 %) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify o \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? QuantityPrime Mover Energy Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source Mcf I.OOOO;GT NG IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify ov Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month;4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Balance Comment (ifbalance is not zero please enter a comment)Adjustments T0 StocksUnits NG Mcf 7373 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fiteled plants with a total steam turbine capacity of 1 0 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) <) \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month 4 OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) jXD o 0-TS| (MWh) of o Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instnictions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover UnitCode Gross Generation (MWh)Net Generation (MWh)Energy Source <3 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx 700k for transportation/reservation fee included for all three plants.2 6 s are Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormE1A-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code p'he cost you have reported is above or below the expected bounds ofthe .lowest/lushest costs.You may be reporting in the wrong units (report cents pel' million Btu)or ifcorrect,you will need to add a comment to explain the unusual tow or high lucl cost. During the month ofApril we took very little natural gas be we slill incurred all the fixed costs related to the transpontlioa/rcscrvtition. NG 2 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 108 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Cheryl HobbsContact Title Joint Venture Accountant Accept By Accept Date PO Box 70Address Cily/Statc/Zip Boise ID 83707 Email chobbs@idahopower.com (208)388-5614Phone Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address Boise rhenderson@idahopower,com City/State/Zip Email ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Bennett Mountain Company Name Plant Name Plant ID Plant Address Plant City t cfc~rir55733PlantCountyElmore 1015 West Hays St. Mountain Home Plant Slate ID !|Yes j X J Yes CHP No For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923 I NoRegulated Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) |N j No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons Liquids:Barrels Ciases:MCF (MMYY)Cents per MMBtu,to the nearest 0.1 cents Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural Gas Only All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Supplier Contract Type Contract Expiration Date Heat Content Sulfur Content Ash Content Energy Source Mercury Film or Content Jnterrupt- Prcdominant Secondary Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the „second longest distance (MMBtus)0.01% per unit 0.01%0.01% TP Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:4 Form EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Name Contract Type Contract Expiration Date Energy Source Coal Mine Coal Mine State Coal Mine CountyMSHAIDType (MMYY) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s j (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? AshPrimeBoilerStatus Mover Id Quantity Type Of Avg Heat Content, (as bumcd) (MMBtll perton, barrel,orMcf) SulfurEnergy Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Type Of UnitsEnergy Source Quantity Avg Heat Content, (as burned) (MMBlu per ton, barrel,orMcf) e 1.0004GTNG17,272 Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify <9 vCT Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:55733 Bennett Mountain Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or otherenergy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Prime Mover Generator Gross GenerationGenerator Status Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant;55733 Bennett Mountain Month:4 OMB No.1905-0129 Approval Expires 12/3 1 /20 1 3FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) TtT9841,044GT (2f2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source >§> o Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month.4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx 700k for transportation/reservation fees are included for all three plants.62 x U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Plant.55733 Bennett Mountain Form Approval Year:2014 Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error NumType Error Description/ Override CommentType Code Id Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise ID 83707 chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance Leader Box 70 Title Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Plant ID Plant Address Plant City Idaho Power Co Langley Gulch PowerPlant ** Plant County Interstate 84 and Highway 30 New Plymouth \ 57028 PAYETTE I.- Plant State ID c X |No |No [.YeS |X Yes CHP For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923 Regulated 0 .,J «' &R0y\.o sr 5ipK <£-f IAy Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) |Y j No Receipts Is there a fuel tolling agreement in place for this plant? ¦ \ Contract Information Complete for All Fuels Receipts Costper Unit All FuelsAllFuels Supplier Contract Type Contract Expiration Date Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF [VARIOUS (NATURAL GAS SPOT IPURCtIASKS ONLY) NG c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p'ant:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Sulfur ContentEnergy Source Heat Content Ash Mercury Firm or Content Interrupt- Predominant Secondary ModeContent Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Blus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance 0.01%(MMBtus) per unit 0.01%0.01% [VARIOUS (NATURAL GAS SPOT I'URCIIASHS ONl.Yj NG PL r \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plarit:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine MSHA ID Contract Type Contract Expiration Date Coal MineEnergy Source Coal Mine Name Coal Mine State Coal Mine CountyType (MMYY) VARIOUS (NATURAL OAS SPOT PURCHASES ONLY) NG C \ x- Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that bum organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or 1C engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id QuantityEnergy Source Type Of Avg Heat Content, (as bumcd) (MMBtu per ton, barrel,or Met) Sulfur Ash Units Content, (coal only,to nearest 0 1 %) Content, (petroleum and coal only,to nearest 0.01%) CA 1 OP NG 0 Mcf 1 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify rN Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant;57028 Langley Gulch Power Plant Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check )Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Met) 1.1)000NGCT0Mcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments T0 Stocks Balance Comment (ifbalance is not zero please enter a comment) McfNG 00 0 c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month.4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion hirbincs,IC engines,wind,or hydro-elcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) CA STG OP 00 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month.4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) (C*-432f°fFT c > Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Source Unit Code Gross Generation (MWh)Net Generation (MWh) < Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month:4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx 700k for iruiisporltilton/tcsciration fees are included forall three plants.2 < Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 plant:57028 Langley Gulch Power Plant Month 4 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code c <