HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 16.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration Month:^Year 2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
$LeU\+«Jee/City/State/Zip Boise ID 83707
Email rhenderson@idaliopower.com Phone (208)388-2290 Fax (208)388-2521
/yiA (a^Report For
Company Name
Plant Name
Plant ID
Plant Address
Plant City
Idaho Power Co
Evander Andrews Power Complex
Plant County
1 862 NW Mt Home Hwy Dist Rd
Mountain Home
7953
Plant State ID
?Yes NoRegulated
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?py a/v^W/*
Yes s No
CHP
CHP Efficiency
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 3 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?*Was Fuel purchased this month?Yes No
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeorSourceGases:MCFtolling
Agreement (MMYY)
a^--A-I618.3VARIOUS(NATURAL G
OS'I Y)<T^—25,693ASSPOTPURCHASESSNG 'CTU
£
J).
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/20 1 7FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF PL/EL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Chloride
Unavailable Mode Mode
Percent weight
to nearest
Type Type
Million Btus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
NG \_^S693VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S 1 PL F F?Yes O Yes
fx]No 0 No
22?
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A.)Coal Mine Information
Purchase Quantity Coal Mine
State
Coal MineEnergy
Source
Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID Type
<1 '
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Prime MoverReport
Month
Boiler Id Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfin-
Content,
(petroleum and
coal only,to
nearest 0 01%)
Ash
Code Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
<2
U.S.Department of Energy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:7953 Evander Andrews Power Complex
Form Approval
on Month:OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
<3.
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
13ir^,4S5GTNOMcf1.0000 GT Y I
Specify other fuel:
^9
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plai1t:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation(Group code)Code ID Code (MWh)(MWh)
Z2
Form ApprovalU.S.Department of Energy
Energy Information Administration
1 Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/201 7FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types ofplants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This niuct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers ofa single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Energy Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year.2015 plarit:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column C:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populaled on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column II:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/Fuei Balance Comments for AdjustmentsSourceYearStocksABCDEFGH
Mcf 25,693NG25,693 0 0
<2*4-o
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Monl|r
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant 7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/201 7FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant,
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity of Fuel Shipped to Plant
A B C D
>0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
2 Approx 653k reservation /transportation is included for all three plants.6
Changes in Ownership (Provide name of purchaser and date sold.)
<
U.S.Department of Energy
Energy Information Administration
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
3 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017
Month:
Form EIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number&Description Ranges Override Comment
U.S.Department of Energy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
3 Year:2015 P|ant:7953 Evander Andrews Power Complex
Form Approval
011 Month:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
.1
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180
lcv*W/Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
7/2.3 //<?City/State/Zip Boise ID 83707
Email rhenderson@idahopower.com Phone (208)388-2290 Fax (208)388-2521
U<2>Report For
9J>Company Name
Plant Name
Plant ID
Plant Address
Plant City
Idaho Power Co
yv~Bennett Mountain
n\If-Plant County55733 Elmore
1015 West Hays St.
Jk $/>5MountainHomePlantStateID
L
x ?Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?Yes NoCHP
CHP Efficiency
<3?
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?sWasFuelpurchasedthismonth?Yes No
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants SO megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract Contract
Chloride
Unavailable Mode Mode
Percent weight
to nearest
Type TypePercentweight
to nearest
Million Btus
Quantity (MMBtus)
per unit
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
?Yes ?Yes
?No ?No
&
IP
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants SO megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy Quantity
Source
Coal Mine
MSHA ID
Coal Mine
State
Coal Mine
Type
Coal Mine
Name
Coal Mine
County
Fuel Supplier
Type
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Ifyou are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption lor each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
AshCodeSourceContent,
(coal only,to
nearest 0.1%)
Specify other fuel;
<3^
-—5^
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation NetGeneration
Id (MWh)(MWh)
CT
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
\GT NG '^-20,425 Mcf 1 .0000 GT Y —17887
Vf
Specify other fuel:
-TP
>>
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 3 Year:2015 Plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity I0MW or AbovFuelConsumption Generation
E1A USE
ONLY
(Group code)
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID GenerationCodeIDCode(MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
UnitCode
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form Approval
OMB No.1905-0129
Approval Expires 05/3 1/2017
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 p,ant:55733 Bennett Mountain
Form EIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for AdjustmentsSourceYearStocks
BA C D E F G H
\^0,425NGMcf 0 0
i
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillatc-typc oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant
A B C D
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 3 Year 2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
2 6 Approx 653k reservation /transportation is included for all three plants.
Changes in Ownership (Provide name of purchaser and date sold.)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:3 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment
<S=*.
U.S.Department ofEnergy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
55733 Bennett Mountain
Form Approval
on Monlh:3 Year:2015 Plant:
Form EIA-923
OMB No.1905-0129
Approval Expires 05/31/2017
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
3 Year.2015 p|ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
Email ehobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
Address Box 70
City/State/Zip Boise ID 83707
"ft Iv,Email i'henderson@idahopower.com Phone (208)388-2290 Fax (208)388-2521
Report For
Company Name
Plant Name
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
Plant City Jtr)Plant State ID
t/'l/f:x.Yes ?NoRegulated
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923*?Yes NoCHP
CHP Efficiency
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
??Was Fuel purchased this month?Yes No
Cost per UnitContractInformationPurchases
Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Quantity
Cents per MMBtu,to
the nearest
0.1 cents
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeorSourceGases:MCFtoiling
Agreement (MMYY)
^3VARIOUS(NATURAL GAS SPOT PURCHASES
ONLY)¦203NG18.3S
f
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChloride
Unavailable Mode Mode
Percent weight
to nearest
Type TypeMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Parts per
Million,or
enter 999 if
not available
Fuel Supplier Purchase Energy
Type Source 0.01%
0 01%
fVARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG PL F1 FIjYesIIYes
[x]No |"xl No
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Energy
Source
Quantity Coal Mine Coal Mine
State
Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier Type MSHA ID Type
Form ApprovalU.S.Department of Energy
Energy Information Administration Mon(h.
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Ifyou are an annual respondent with a generator nameplatc capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 1 0MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Prime Mover Boiler Id Boiler Status Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Met)
Sulftir
Content,
(petroleum and
coal only,to
nearest 0.01%)
Report
Month
Energy
Source
Quantity
Consumed
Units Ash
Code Content,
(coal only,to
nearest 0.1 %)
Specify other fuel:
U.S.Department ofEnergy
Energy Information Administrati
Monthly EIA923 Power Plant Operations Report
57028 Langley Gulch Power Plant
Form Approval
on Month:3 Year:2015 Plant:OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy
Source
Quantity Consumed Type OfUnits Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Prime Mover Peaking Unit Gross Geneiation Net Generation
(Yes/No)Code (MWh)(MWh)
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form E1A-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month
Source ID Generation(Group code)Code ID (MIWh)
WPF
(MWh)
1.000
/
I CAI I OP NG 0 Met'I CT GTG OP \3^nI1.000I1CTGTGNG14Mcf 1 1 CA STG OP 0
c v cP-
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month;
Form EIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers ofa single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only ifnet generation is not measured.
Column E:Net Generation:
¦-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Energy Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plari,:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Coal:
Residual Oil:
Short Tons
Units Previous Month/
Year Stocks
Energy
Source
Purchases Consumption End of Month/
Year Stocks
Fuel BalanceAdjustmentto
Stocks
Comments for Adjustments
A B C D E F G H
14McfNG14 0 0
<.
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant Name Quantity of Fuel Shipped to PlantPlantIDFuelType
DABC
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
2 6 Approx 653k reservation /transportation is included for all three plants.
Changes in Ownership (Provide name of purchaser and date sold.)
^-
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 Plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017
Month:
Form EIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment
Y _
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
3 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
3