HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 15.pdfForm ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:57028 Langley Gulch Power Plant
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise ID 83707
Email chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
Box 70Address
City/State/Zip
Email
Boise ID 83707
rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone
Report For
Company Name
Plant Name
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
APlantCityPlantStateID \VcGYes
X ^Yes
CHP X No
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923
AyRegulatedNo
c n
r
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:57028 Langley Gulch Power Plant
Month.3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tollingagreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas
Energy
Source
Solids;Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0 1 cents
Gases;MCF
0>
f\y5 565.2VARIOUS(NATURAL GAS SPOT
PURCHASES ONLY)
S NO 112,513 1076.9
e-
c
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information.
Complete for A1J Fuels
Quality ofFuels Received Fuel Transpoitation
Natural GasCoal,Pet Coke,Oil Coal,Pet Coke and OilAllFuelsCoalOnly
Only
Supplier Sulfur Content Ash Mercury Firm or
Content Interrupt-
PrcdominantContractTypeContract
Expiration
Date
Energy
Source
Heat
Content
Secondary
Mode ModeContent
Percent weight
to nearest Percent weight
tonearest
ible
Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMYY)
0.01%(MMBtus)
per unit 0.01%0.01%
v
I'l
ARIOUS (NATURAL GAS SPOT
URCHASES ONLY)
PLSNG1F
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
County
Contract Type Contract
Expiration
Date
Energy
Source MSHA ID Type
(MMYY)
VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
S NG
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Sulfur Ash
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1 %)
CA 1 OP NG 0 Mcf 0
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plar>t:57028 Langley Gulch Power Plant
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type OfUnits Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source
\112,513 1.000(1NGCTMcf
IfEnergy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
N
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 p,ant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Balance Comment (ifbalance is not zero please enter acomment)Energy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
CurrentMonth's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Mcf 0NG112,513 112,513 0
C
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reportedon SCHEDULE 3.Part A.
Industrial or Commercial CLIP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row foreach Generator ID (sec page ten ofthe instructions),
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Td (MWh)(MWh)
(JCASTGOP0
C
V
«£L
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant 57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
T7 16,157
(MWh)
15,262]CT
c
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 P'ant 57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Unit Code Gross Generation (MWh)Net Generation (MWh)Prime
Mover
Energy
Source
c
\
o
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Approx S726k ofreservation /transportation fees are included for all three plants.B2
<T
U.S.Department of Energy
Energy Information Administrati
EIA923 Power Plant Operations Report
2014 Plant.57028 Langley Gulch Power Plant
Form Approval
ion Year:OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Month 3
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
NumType
Error Description/
Override CommentTypeId
Code
C
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:57028 Langley Gulch Power Plant
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Schedule Prime
Mover
Purchase
Type
Fuel Equipment Supplier Error
Num
Error Description/
Override CommentTypeId
Code
the cost you have reported is above or below the expected bounds ofthe
lowest/highest costs.You may be reporting in the wrong units (report cents per
million Btu)or if correct,you will need to add a comment to explain the unusual
¦low orhigh fuel cost.
S NG 2 VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
108
During the month of March more gas was contracted that IPC was able to use.Do
In this the cost of the small amount ofgas burned at the plant was increased by the
fixed cost ofthe Irunporiiltnn /reservation fees causing the cost be MMBtu
delivered to exceed the expected range.
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise ID 83707
Phone (208)388-5614 Fax (208)433-5180Emailchobbs@idahopower.com
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
Box 70Address
City/State/Zip
Email
Boise ID 83707
Fax (208)388-2521rhenderson@idahopower.com (208)388-2290Phone
Report For
Idaho Power CoCompanyName
Plant Name ,)4>
Bennett Mountain
Plant ID Plant County Elmore55733
1PlantAddressIOI5WestHaysSt.
C 'Plant StateMountainHome IDPlantCity
Yes j *No
H -I
CHP
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923
3RegulatedNo
¦j
!
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:55733 Bennett Mountain
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
|N j No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
(MMYY)
Energy Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gasSource
Solids:Tons
Liquids:Battels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
Natura I GasAllFuelsCoal.Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Sulfur Content AshEnergy
Source
Heat
Content
Mercury Finn or
Content Interrupt-
Prcdominant Secondary
ModeContent Mode
Percent weight
to nearest Percent weight
to nearest
ible
Million Btus(MMYY)Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
c?3
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for AH Fuels
Coal Mine Type
Ifyouhave provided the MSHA ID number,leave these items blank
Supplier Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
County
Contract Type Contract
Expiration
Date
Energy
Source MSHA ID Type
(MMYY)
V
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of Sulfur AshAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0,1 %)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
<sP
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant 55733 Bennett Mountain
Month.3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source
GT IMIOOIlNG0Mcf
IfEnergy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
<P
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information,
Enter a comment if the balance does not equal zero.
Energy Source Type Of Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Balance Comment (if balance is not zero please entera comment)Current Month's
Ending Stocks
Adjustments
To StocksUnits
v
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 p,ant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5,PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CPIP Plants may report ONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (sec page ten ofthe instructions).
Prime
Mover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
V1
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:55733 Bennett Mountain
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
-93 iGT0
*3=
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant:55733 Bennett Mountain
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothennal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy Unit Code Gross Generation (MWh)Net Generation (MWh)
Source
<sP
o
U.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
2014 plant:55733 Bennett Mountain
Form Approval
Year:OMB No,1905-0129
Approval Expires 12/31/2013FormEIA-923
Month:3
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
V
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year.2014 Plant:55733 Bennett Mountain
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeType
Code
Id
<5=
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE!.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
Title Joint Venture Accountant
PO Box 70Address
City/Statc/Zip Boise ID 83707
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Contact
Title
Box 70Address
City/State/Zip
Email
Boise
rhenderson@idahopower.com
ID 83707
(208)388-2290 Fax (208)388-2521Phone
Report For
Idaho Power Co
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Disl Rd
Mountain Home
Company Name
Plant Name
Plant ID
Plant Address
Plant City
7953
Plant State ID
t)X !NoIYes
j X Yes
CHP
IoA A/.
kMv*
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923
?Regulated No
P.0'
-<Q Q-V*
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year.2014 Plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
Y |No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete forAll Fuels
Receipts Cost per Unit
All Fuels All Fuels
Supplier Contract Type Contract
Expiration
Date
(MMYY)
Quantity Commodity
Cost (coal,natural gas
Energy Total Delivered
CostSource
Solids:Tons
Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
3 2/*r)\26,723 .7SV S(»6.2ARIOUS(NATURAL GAS SPOT
IIRCI 1ASLS ONLY)
1076.9SNG
1
*3.
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 p,ant:7953 Evander Andrews Power Complex
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Quality ofFuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
Supplier Contract Type Contract
Expiration
Date
Energy
Source
Sulfur ContentHeat
Content
Ash
Content
Mercury Firm or
Content Interrupt-
Predominant Secondary
Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
perunit 0.01%0.01%
(Various (natural gas spot
PURCHASES ONLY)
S NG 1 F PL
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels
Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
Supplier Contract Type Contract
Expiration
Date
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
County
Energy
Source MSHA ID Type
(MMYY)
KARIOUS (NATURAL GAS SPOT
'URCHASES ONLY)
S NG
>a
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant 7953 Evander Andrews Power Complex
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity SulfurTypeOfAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Ash
Source Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1 %)
IfEnergy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
<3,
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
(Ifapplicable,please clieck.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,orMcf)
Source
GT Mcf 1.0000'NG 26,723
?
IfEnergy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
<a
cr
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
Energy Source Type Of Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
Units
McfNG 26,723 26,723 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled bynuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may reportONLY gross generation ifnet generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten ofthe instructions).
Net GenerationPrime
Mover
Gross GenerationGeneratorGenerator
Status (MWh)(MWh)Id
<S>
-cP-
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month:3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE S.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not
measured (see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
(1/2,132
(MWh)
A/2.039GT\
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Energy
Source
Gross Generation (MWh)Net Generation (MWh)Unit Code
]
<2
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 Plant 7953 Evander Andrews Power Complex
Month 3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Approx S726k ofreservation/transportation fees are included for all three plants.2 B
•£>*v
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 12/31/2013
Year:2014
Month:3
Form EIA-923
Errors
Purchase ScheduleFuel Prime
Mover
Equipment Supplier Error Description/
Override Comment
Error
NumTypeTypeId
Code
<•
Form ApprovalU.S.Department of Energy
Energy Information Administration
EIA923 Power Plant Operations Report
Year:2014 plant:7953 Evander Andrews Power Complex
Month.3
OMB No.1905-0129
Approval Expires 12/31/2013FormEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
S NG 2 VARIOUS (NATURAL GAS SPOT
PURCHASES ONLY)
108 The cost you have reported is above or below the expected bounds ofthe
lowest/highest costs.You may be reporting in the wrong units (report eents per
million Btu)or ifcorrect,you will need to add a comment to explain the unusual
low orhigh fuel cost.
During the month ofMarch more gas was conlraclcd that IPC was able to use.Do
to this the cost of the small amount ofgas burned at the plant was increased by the
fixed cost of the Irmtporntion /reservation fees causing the cost be MMBtudeliveredtoexceedliteexpectedrange.