Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 15.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise ID 83707 Email chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name Plant Name Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth Plant ID 57028 PAYETTE Plant Address APlantCityPlantStateID \VcGYes X ^Yes CHP X No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 AyRegulatedNo c n r Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month.3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tollingagreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Quantity Total Delivered Cost Commodity Cost (coal,natural gas Energy Source Solids;Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0 1 cents Gases;MCF 0> f\y5 565.2VARIOUS(NATURAL GAS SPOT PURCHASES ONLY) S NO 112,513 1076.9 e- c V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information. Complete for A1J Fuels Quality ofFuels Received Fuel Transpoitation Natural GasCoal,Pet Coke,Oil Coal,Pet Coke and OilAllFuelsCoalOnly Only Supplier Sulfur Content Ash Mercury Firm or Content Interrupt- PrcdominantContractTypeContract Expiration Date Energy Source Heat Content Secondary Mode ModeContent Percent weight to nearest Percent weight tonearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMYY) 0.01%(MMBtus) per unit 0.01%0.01% v I'l ARIOUS (NATURAL GAS SPOT URCHASES ONLY) PLSNG1F C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine County Contract Type Contract Expiration Date Energy Source MSHA ID Type (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Sulfur Ash Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) CA 1 OP NG 0 Mcf 0 If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plar>t:57028 Langley Gulch Power Plant Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source \112,513 1.000(1NGCTMcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify N Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Balance Comment (ifbalance is not zero please enter acomment)Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts CurrentMonth's Consumption Current Month's Ending Stocks Adjustments To Stocks Mcf 0NG112,513 112,513 0 C Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueledby nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reportedon SCHEDULE 3.Part A. Industrial or Commercial CLIP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row foreach Generator ID (sec page ten ofthe instructions), Prime Mover Generator Generator Status Gross Generation Net Generation Td (MWh)(MWh) (JCASTGOP0 C V «£L Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant 57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh) T7 16,157 (MWh) 15,262]CT c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 P'ant 57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Unit Code Gross Generation (MWh)Net Generation (MWh)Prime Mover Energy Source c \ o Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx S726k ofreservation /transportation fees are included for all three plants.B2 <T U.S.Department of Energy Energy Information Administrati EIA923 Power Plant Operations Report 2014 Plant.57028 Langley Gulch Power Plant Form Approval ion Year:OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Month 3 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error NumType Error Description/ Override CommentTypeId Code C Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Schedule Prime Mover Purchase Type Fuel Equipment Supplier Error Num Error Description/ Override CommentTypeId Code the cost you have reported is above or below the expected bounds ofthe lowest/highest costs.You may be reporting in the wrong units (report cents per million Btu)or if correct,you will need to add a comment to explain the unusual ¦low orhigh fuel cost. S NG 2 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 108 During the month of March more gas was contracted that IPC was able to use.Do In this the cost of the small amount ofgas burned at the plant was increased by the fixed cost ofthe Irunporiiltnn /reservation fees causing the cost be MMBtu delivered to exceed the expected range. Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise ID 83707 Phone (208)388-5614 Fax (208)433-5180Emailchobbs@idahopower.com Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Email Boise ID 83707 Fax (208)388-2521rhenderson@idahopower.com (208)388-2290Phone Report For Idaho Power CoCompanyName Plant Name ,)4> Bennett Mountain Plant ID Plant County Elmore55733 1PlantAddressIOI5WestHaysSt. C 'Plant StateMountainHome IDPlantCity Yes j *No H -I CHP For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923 3RegulatedNo ¦j ! Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) |N j No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date (MMYY) Energy Quantity Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons Liquids:Battels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natura I GasAllFuelsCoal.Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Sulfur Content AshEnergy Source Heat Content Mercury Finn or Content Interrupt- Prcdominant Secondary ModeContent Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% c?3 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for AH Fuels Coal Mine Type Ifyouhave provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine County Contract Type Contract Expiration Date Energy Source MSHA ID Type (MMYY) V Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Sulfur AshAvgHeat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0,1 %) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify <sP Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant 55733 Bennett Mountain Month.3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source GT IMIOOIlNG0Mcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify <P Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information, Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Balance Comment (if balance is not zero please entera comment)Current Month's Ending Stocks Adjustments To StocksUnits v Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5,PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CPIP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) V1 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) -93 iGT0 *3= Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothennal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source <sP o U.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report 2014 plant:55733 Bennett Mountain Form Approval Year:OMB No,1905-0129 Approval Expires 12/31/2013FormEIA-923 Month:3 SCHEDULE 9.COMMENTS Schedule Part Item Comments V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 Plant:55733 Bennett Mountain Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeType Code Id <5= Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE!.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise ID 83707 Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Email Boise rhenderson@idahopower.com ID 83707 (208)388-2290 Fax (208)388-2521Phone Report For Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Disl Rd Mountain Home Company Name Plant Name Plant ID Plant Address Plant City 7953 Plant State ID t)X !NoIYes j X Yes CHP IoA A/. kMv* For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923 ?Regulated No P.0' -<Q Q-V* Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 Plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Y |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete forAll Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date (MMYY) Quantity Commodity Cost (coal,natural gas Energy Total Delivered CostSource Solids:Tons Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 3 2/*r)\26,723 .7SV S(»6.2ARIOUS(NATURAL GAS SPOT IIRCI 1ASLS ONLY) 1076.9SNG 1 *3. Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Content Ash Content Mercury Firm or Content Interrupt- Predominant Secondary Mode Mode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% perunit 0.01%0.01% (Various (natural gas spot PURCHASES ONLY) S NG 1 F PL Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine County Energy Source MSHA ID Type (MMYY) KARIOUS (NATURAL GAS SPOT 'URCHASES ONLY) S NG >a Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant 7953 Evander Andrews Power Complex Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity SulfurTypeOfAvgHeat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Ash Source Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1 %) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify <3, Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please clieck.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,orMcf) Source GT Mcf 1.0000'NG 26,723 ? IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify <a cr Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) Units McfNG 26,723 26,723 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled bynuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may reportONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten ofthe instructions). Net GenerationPrime Mover Gross GenerationGeneratorGenerator Status (MWh)(MWh)Id <S> -cP- Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE S.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) (1/2,132 (MWh) A/2.039GT\ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Energy Source Gross Generation (MWh)Net Generation (MWh)Unit Code ] <2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant 7953 Evander Andrews Power Complex Month 3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Approx S726k ofreservation/transportation fees are included for all three plants.2 B •£>*v Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex OMB No.1905-0129 Approval Expires 12/31/2013 Year:2014 Month:3 Form EIA-923 Errors Purchase ScheduleFuel Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code <• Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month.3 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code S NG 2 VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 108 The cost you have reported is above or below the expected bounds ofthe lowest/highest costs.You may be reporting in the wrong units (report eents per million Btu)or ifcorrect,you will need to add a comment to explain the unusual low orhigh fuel cost. During the month ofMarch more gas was conlraclcd that IPC was able to use.Do to this the cost of the small amount ofgas burned at the plant was increased by the fixed cost of the Irmtporntion /reservation fees causing the cost be MMBtudeliveredtoexceedliteexpectedrange.