Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 14.pdfticrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month 3 Plant:7953 Evander Andrews Power Complex)rm EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions andtheprovisionconcerningconfidentialityofinformationintheinstructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly andwillinglytomaketoanyAgencyorDepartmentoftheUnitedStatesanyfalse,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact itle Joint Venture Accountant PO Box 70Vddress lity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Box 70 Contact "itle JOh4m Vddress Jity/State/Zip imail Boise rhenderson@idahopower.com ID 83707 Qffr(208)388-2290 Fax (208)388-2521Phone Report For eo.^Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home Company Name 'lant Name •lant ID Him7953 'lant Address 'lant City Plant State ID Yes l^|No m Yes CHP S'/z^/i 3Forcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo <3 \ OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month 3 Plant:7953 Evander Andrews Power ComplexxmEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels ipplier Contract Type Contract Expiration Date Energy Total Delivered Cost Quantity Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 3\ty.4.RIOUS (NATURAL GAS SPOT JRCHASFS ONLY) S NG 59,034 357.9603.5 4 1 /\RIOUS (NATURAL GAS SPOT JRCHASBS ONLY) S NG 10,208 355.2 352.1 <3. OMB No.1905-0129 Approval Expires 12/31/2013 riergy Information Administration Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexDrmEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Date Sulfur ContentEnergy AshHeat Content Mercury Firm or Content lnterrupl- Predominant Secondary ModeSourceContentMode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% y\RlOUS (NATURAL GAS SPOT JRCIIASES ONLY) S NG I F PL j£-\RlOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG 1 F PL nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:7953 Evander Andrews Power ComplexYear:2013 Month:3 rrm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date Coal MineEnergy Coal Mine Type Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAID (MMYY) tRIOUS (NATURAL GAS SPOT JRCHASES ONLY1 \RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG S NG ^2 V OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexarmEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of Units SulfurAvgHeat Content, (as burned) (MMBtu per ton, barrel,or Met) AshSourceContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify -o V OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexarmE1A-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in mcgawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source >1GTNG69,242 1.000Mcf4 IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify <0 cr nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexnrmEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 1 0 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (ifbalance is not zero please enter a comment) ,\69,242NGMcf 69,242 0 0 <J > nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexjrmEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at sleam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime /lover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) ^9 OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2013 Month 3 :>rm EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 1 0 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial (/HP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) \'b 6,858 (MWh) f?6,703GT i1 -O ^£5 nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexrrmEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source isnoncomblistible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energysourcefornuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data bygeneratingunit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter thetotal generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured(see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source o N o OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:7953 Evander Andrews Power ComplexYear:2013 Month:3 jrm EIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Includes reservation/transport fee for all plants $731,157.8626 <? OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month:3 Plant:7953 Evander Andrews Power ComplexDrmEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumTypeTypeId Code <2 e? nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month 3 Plant:55733 Bennett MountainmmEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Cheryl HobbsContact Itle Joint Venture Accountant Accept By Accept Date PO Box 70Vddress lity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance Leader'itle Box 70\ddress Hfiw3ity/Slate/Zip imail Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521 flat1Phone Report For w Company Name Idaho Power Co 'lant Name Mant ID 'lant Address 1015 West Hays St. 'lant City Bennett Mountain Plant County55733 Elmore Mountain Home Plant State ID £Av,iJP / «6 j Yes |X |No |X j Yes ||No CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated OMB No.1905-0129 Approval Expires 12/31/2013 ncrgy Information Administration Year:2013 Month 3 Plant:55733 Bennett MountainrrmEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1.are on page 3.) N No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All FuelsAllFuels ipplier Contract Type Contract Expiration Date Quantity Total Delivered Cost Energy Source Commodity Cost (coal,natural gas Solids:Tons Liquids:Barrels Gases:MCF (MMYY)Cents per MMBtu,to the nearest 0.1 cents nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:55733 Bennett Mountain}rm EIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Coal,Pet Coke,Oil Natural GasCoalOnly Coal,Pet Coke and Oil Only ipplier Sulfur ContentContractTypeContract Expiration Date Energy Source Heal Content Ash Mercury Firm or Content Interrupt- Predominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible(MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% <? aergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant.55733 Bennett Mountain}rm EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank ipplier Contract Type Contract Expiration Date (MMYY) Coal Mine Coal Mine Coal Mine Name Energy Coal Mine State Coal Mine CountySourceMSHAIDType <£> V OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:55733 Bennett MountainYear:2013 Month:3 :>rm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s I I (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Source Quantity Type Of SulfurAvgHeat Content, (as bumed) (MMBtu per ton, barrel,or Met) Ash Units Content, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) r If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify <3^ aergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:55733 Bennett MountainarmEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). ](Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) GT NG 7,549 1.0000Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify <P •s nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month 3 Plant:55733 Bennett MountainrrmEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must bereportedseparately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) V OMB No.1905-0129 Approval Expires 12/31/2013 ncrgy Information Administration Year:2013 Month:3 Plant:55733 Bennett MountainDrmEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime /lover Generator Generator Status Gross Generation Net GenerationId(MWh)(MWh) OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:55733 Bennett MountainYear:2013 Month 3 Drm EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3,Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) ££GT 716 561 \ ncrgy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:55733 Bennett MountainYear:2013 Month:3 jrm EIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,gcothermal,hydroelectric,or other plants where the energy source isnoncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geolhermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heatDonotreportgenerationatacombined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data bygeneratingunit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter thetotal generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Energy Unit Code Gross Generation (MWh)Net Generation (MWh) Source o OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant:55733 Bennett MountainYear:2013 Month:3 Drm EIA-923 SCHEDULE 9.COMMENTS Schedule Pari Item Comments <P nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:55733 Bennett MountainrrrnEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeTypeId Code <P OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2013 Month:3 Plant:57028 Langley Gulch Power PlantjrmEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl Hobbsiontact it!e Joint Venture Accountant PO Box 70Vddress Jity/State/Zip imail Boise chobbs@idahopower.com ID 83707 Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Guy Colpronlontact "itle Engineering Leader PO Box 70Iddress V/zr/TJiity/State/Zip imail Boise gcolpron@idahopower.com ID 83707 (208)388-2784 Fax (208)388-6689Phone Report For f^z/,3lompanyName 'lant Name Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 New Plymouth 'lant ID 57028 PAYETTE 'lant Address 'lant City Plant State ID Yes j X J No X Yes No CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated "\ OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2013 Month:3 Plant:57028 Langley Gulch Power Plant:>rm EIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels ipplier Contract Type Contract Expiration Date Quantity Total Delivered Cost Energy Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases.MCF 2 4"¦X\RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S NG 211,285 603.5 357.9t\15,000\RIOUS (NATURAL GAS SPOT JRCHASES ONLY) <\RIOUS (NATURAL GAS SPOT 1RCHASES ONLY) S 390NG658.3? 352.1S39,131NG 355.2\ c \ nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:57028 Langley Gulch Power Plant3rmEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only ipplier Contract Type Contract Expiration Date Sulfur Content Mercury Firm or Content Intcrrupt- Energy Source Heat Content Ash Predominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest iblc (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% \R10US (NATURAL GAS SPOT JRCHASES ONLY) F /S NG PL ¦kRIOUS (NATURAL GAS SPOT JRCHASES ONLY) \RIOUS (NATURAL GAS SPOT JRCHASES ONLY) S ING I V PL S NG 1 F PL V nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear:2013 Month.3 Dim EIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSF1A ID number,leave these items blank ipplier Contract Type Contract Expiration Date Energy Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAIDType (MMYY) MUOUS (NATURAL GAS SPOT JRCHASBS ONLY) \RIOUS (NATURAL GAS SPOT JRCHASES ONLY) tRIOUS (NATURAL GAS SPOT JRCHASESONLY) S NG S NG S NG V OMB No.1905-0129 Approval Expires 12/31/2013 tiergy Information Administration Year:2013 Month 3 Plant:57028 Langley Gulch Power Plant:>rm EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Energy Quantity Type Of SulfurAvgHeat Content, (as burned) (MMBtu per ton, barrel,or Mcf) AshSourceUnitsContent, (petroleum and coal only,to nearest 0.01%) Content, (coal only,to nearest 0.1%) CA 1 OP NG Mcf If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify c \ J" tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear:2013 Month:3 Km EIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 1 0 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). [j (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Quantity Type Of Units Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Source 4CTNG 265,416 Mcf 1.0000 IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify rv\ c nergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:57028 Langley Gulch Power Plant)rm EIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must bereportedseparately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. inergy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Adjustments To Stocks Current Month's Ending Stocks Balance Comment (ifbalance is not zero please enter a comment) \265,416McfNG 265,416 0 0<k <TV OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Plant.57028 Langley Gulch Power PlantYear:2013 Month:3 rrm EIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). 'rime dover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) CA STG OP r YcA OMBNo.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month:3 Plant:57028 Langley Gulch Power PlantirmEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 1 0 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) {*)40,532 (MWh) y£39,198CT -1 c OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month 3 Plant:57028 Langley Gulch Power Plant:>rm EIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothcrmal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energysourcefornuclear,wind,solar,geothcrmal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh) Source c V OMB No.1905-0129 Approval Expires 12/31/2013 nergy Information Administration Year:2013 Month 3 Plant:57028 Langley Gulch Power PlantjrmEIA-923 SCHEDULE 9.COMMENTS Schedule Part CommentsItem Includes reservation/transport fee lor all plants $731,157-5626 c tiergy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013 Year:2013 Month:3 Plant:57028 Langley Gulch Power PlantrrmEIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Num Error Description/ Override CommentTypeType Code Id