HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 14.pdfticrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 3
Plant:7953 Evander Andrews Power Complex)rm EIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions andtheprovisionconcerningconfidentialityofinformationintheinstructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly andwillinglytomaketoanyAgencyorDepartmentoftheUnitedStatesanyfalse,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl HobbsContact
itle Joint Venture Accountant
PO Box 70Vddress
lity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Randy Henderson
Operations Finance Leader
Box 70
Contact
"itle
JOh4m
Vddress
Jity/State/Zip
imail
Boise
rhenderson@idahopower.com
ID 83707
Qffr(208)388-2290 Fax (208)388-2521Phone
Report For
eo.^Idaho Power Co
Evander Andrews Power Complex
Plant County
1862 NW Mt Home Hwy Dist Rd
Mountain Home
Company Name
'lant Name
•lant ID Him7953
'lant Address
'lant City Plant State ID
Yes l^|No
m Yes
CHP
S'/z^/i 3Forcontactdetailgotohttp://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo
<3
\
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Year:2013
Month 3
Plant:7953 Evander Andrews Power ComplexxmEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
No Receipts
Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
ipplier Contract Type Contract
Expiration
Date
Energy Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gasSource
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases:MCF
3\ty.4.RIOUS (NATURAL GAS SPOT
JRCHASFS ONLY)
S NG 59,034 357.9603.5
4 1 /\RIOUS (NATURAL GAS SPOT
JRCHASBS ONLY)
S NG 10,208 355.2 352.1
<3.
OMB No.1905-0129
Approval Expires 12/31/2013
riergy Information Administration Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexDrmEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality of Fuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Date
Sulfur ContentEnergy AshHeat
Content
Mercury Firm or
Content lnterrupl-
Predominant Secondary
ModeSourceContentMode
Percent weight
to nearest Percent weight
to nearest
ible
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
y\RlOUS (NATURAL GAS SPOT
JRCIIASES ONLY)
S NG I F PL
j£-\RlOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG 1 F PL
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:7953 Evander Andrews Power ComplexYear:2013
Month:3
rrm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Coal MineEnergy Coal Mine
Type
Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAID
(MMYY)
tRIOUS (NATURAL GAS SPOT
JRCHASES ONLY1
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG
S NG
^2
V
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexarmEIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of
Units
SulfurAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Met)
AshSourceContent,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
-o
V
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexarmE1A-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
mcgawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
(Ifapplicable,please check.)Was sleam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source
>1GTNG69,242 1.000Mcf4
IfEnergy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
<0
cr
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexnrmEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 1 0 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be
reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (ifbalance is not zero please enter a comment)
,\69,242NGMcf 69,242 0 0
<J
>
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexjrmEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at sleam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition of net generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
^9
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:7953 Evander Andrews Power ComplexYear:2013
Month 3
:>rm EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 1 0 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial (/HP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
\'b 6,858
(MWh)
f?6,703GT
i1
-O
^£5
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexrrmEIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source isnoncomblistible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energysourcefornuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data bygeneratingunit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter thetotal
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured(see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
o
N
o
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:7953 Evander Andrews Power ComplexYear:2013
Month:3
jrm EIA-923
SCHEDULE 9.COMMENTS
Schedule Part Item Comments
Includes reservation/transport fee for all plants $731,157.8626
<?
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2013
Month:3
Plant:7953 Evander Andrews Power ComplexDrmEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error Description/
Override Comment
Error
NumTypeTypeId
Code
<2
e?
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 3
Plant:55733 Bennett MountainmmEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Cheryl HobbsContact
Itle Joint Venture Accountant
Accept By
Accept Date
PO Box 70Vddress
lity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Operations Finance Leader'itle
Box 70\ddress
Hfiw3ity/Slate/Zip
imail
Boise ID 83707
rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521 flat1Phone
Report For
w
Company Name Idaho Power Co
'lant Name
Mant ID
'lant Address 1015 West Hays St.
'lant City
Bennett Mountain
Plant County55733 Elmore
Mountain Home Plant State ID
£Av,iJP /
«6
j Yes |X |No
|X j Yes ||No
CHP
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated
OMB No.1905-0129
Approval Expires 12/31/2013
ncrgy Information Administration Year:2013
Month 3
Plant:55733 Bennett MountainrrmEIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
N No Receipts
Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All FuelsAllFuels
ipplier Contract Type Contract
Expiration
Date
Quantity Total Delivered
Cost
Energy
Source
Commodity
Cost (coal,natural gas
Solids:Tons
Liquids:Barrels
Gases:MCF
(MMYY)Cents per MMBtu,to
the nearest
0.1 cents
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:55733 Bennett Mountain}rm EIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality ofFuels Received Fuel Transportation
All Fuels Coal,Pet Coke,Oil Natural GasCoalOnly Coal,Pet Coke and Oil
Only
ipplier Sulfur ContentContractTypeContract
Expiration
Date
Energy
Source
Heal
Content
Ash Mercury Firm or
Content Interrupt-
Predominant Secondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
ible(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
<?
aergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant.55733 Bennett Mountain}rm EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSHA ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
(MMYY)
Coal Mine Coal Mine Coal Mine
Name
Energy Coal Mine
State
Coal Mine
CountySourceMSHAIDType
<£>
V
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:55733 Bennett MountainYear:2013
Month:3
:>rm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
I I (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy
Source
Quantity Type Of SulfurAvgHeat
Content,
(as bumed)
(MMBtu per ton,
barrel,or Met)
Ash
Units Content,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
r
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
<3^
aergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:55733 Bennett MountainarmEIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions).
](Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
QuantityEnergy
Source
Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
GT NG 7,549 1.0000Mcf
If Energy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
<P
•s
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month 3
Plant:55733 Bennett MountainrrmEIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must bereportedseparately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form.
Enter zero if the plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment ifthe balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Current Month's
Ending Stocks
Adjustments
To Stocks
Balance Comment (if balance is not zero please enter a comment)
V
OMB No.1905-0129
Approval Expires 12/31/2013
ncrgy Information Administration Year:2013
Month:3
Plant:55733 Bennett MountainDrmEIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion
turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
/lover
Generator Generator
Status
Gross Generation Net GenerationId(MWh)(MWh)
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:55733 Bennett MountainYear:2013
Month 3
Drm EIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3,Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)(MWh)
££GT 716 561
\
ncrgy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:55733 Bennett MountainYear:2013
Month:3
jrm EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,gcothermal,hydroelectric,or other plants where the energy source isnoncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy
source for nuclear,wind,solar,geolhermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heatDonotreportgenerationatacombined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data bygeneratingunit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter thetotal
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Energy Unit Code Gross Generation (MWh)Net Generation (MWh)
Source
o
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Plant:55733 Bennett MountainYear:2013
Month:3
Drm EIA-923
SCHEDULE 9.COMMENTS
Schedule Pari Item Comments
<P
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:55733 Bennett MountainrrrnEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeTypeId
Code
<P
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2013
Month:3
Plant:57028 Langley Gulch Power PlantjrmEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Submit By
Submit Date
Accept By
Accept Date
Cheryl Hobbsiontact
it!e Joint Venture Accountant
PO Box 70Vddress
Jity/State/Zip
imail
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Guy Colpronlontact
"itle Engineering Leader
PO Box 70Iddress
V/zr/TJiity/State/Zip
imail
Boise
gcolpron@idahopower.com
ID 83707
(208)388-2784 Fax (208)388-6689Phone
Report For
f^z/,3lompanyName
'lant Name
Idaho Power Co
Langley Gulch Power Plant
Plant County
Interstate 84 and Highway 30
New Plymouth
'lant ID 57028 PAYETTE
'lant Address
'lant City Plant State ID
Yes j X J No
X Yes No
CHP
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated
"\
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2013
Month:3
Plant:57028 Langley Gulch Power Plant:>rm EIA-923
SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
No Receipts Is there a fuel tolling agreement in place for this plant?
Contract Information
Complete for All Fuels
Receipts Cost per Unit
All Fuels All Fuels
ipplier Contract Type Contract
Expiration
Date
Quantity Total Delivered
Cost
Energy Commodity
Cost (coal,natural gasSource
Solids:Tons
(MMYY)Liquids:Barrels Cents per MMBtu,to
the nearest
0.1 cents
Gases.MCF
2 4"¦X\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S NG 211,285 603.5 357.9t\15,000\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
<\RIOUS (NATURAL GAS SPOT
1RCHASES ONLY)
S 390NG658.3?
352.1S39,131NG 355.2\
c
\
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:57028 Langley Gulch Power Plant3rmEIA-923
SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Quality of Fuels Received Fuel Transportation
Natural GasAllFuelsCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil
Only
ipplier Contract Type Contract
Expiration
Date
Sulfur Content Mercury Firm or
Content Intcrrupt-
Energy
Source
Heat
Content
Ash Predominant Secondary
Content Mode Mode
Percent weight
to nearest Percent weight
to nearest
iblc
(MMYY)Million Btus Percent weight
to nearest
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
(MMBtus)0.01%
per unit 0.01%0.01%
\R10US (NATURAL GAS SPOT
JRCHASES ONLY) F /S NG PL
¦kRIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
S ING I V PL
S NG 1 F PL
V
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:57028 Langley Gulch Power PlantYear:2013
Month.3
Dim EIA-923
SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS -
PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
Contract Information
Complete for All Fuels Coal Mine Type
Ifyou have provided the MSF1A ID number,leave these items blank
ipplier Contract Type Contract
Expiration
Date
Energy Coal Mine Coal Mine Coal Mine
Name
Coal Mine
State
Coal Mine
CountySourceMSHAIDType
(MMYY)
MUOUS (NATURAL GAS SPOT
JRCHASBS ONLY)
\RIOUS (NATURAL GAS SPOT
JRCHASES ONLY)
tRIOUS (NATURAL GAS SPOT
JRCHASESONLY)
S NG
S NG
S NG
V
OMB No.1905-0129
Approval Expires 12/31/2013
tiergy Information Administration Year:2013
Month 3
Plant:57028 Langley Gulch Power Plant:>rm EIA-923
SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL
CONSUMPTION
This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels.
Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on
SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s
(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period?
Prime Boiler Status
Mover Id
Energy Quantity Type Of SulfurAvgHeat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
AshSourceUnitsContent,
(petroleum and
coal only,to
nearest 0.01%)
Content,
(coal only,to
nearest 0.1%)
CA 1 OP NG Mcf
If Energy source reported is OTH,OBS,OBG,OBL,or OG,
please specify
c
\
J"
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Plant:57028 Langley Gulch Power PlantYear:2013
Month:3
Km EIA-923
SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME
MOVER-LEVEL
Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 1 0 MW,AND ALL combustion turbines,
IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other
words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in
megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions).
[j (If applicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period?
Prime
Mover
Energy Quantity Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Source
4CTNG 265,416 Mcf 1.0000
IfEnergy source reported is OTH,OBS,OBG,
OBL,or OG,please specify
rv\
c
nergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:57028 Langley Gulch Power Plant)rm EIA-923
SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA
BALANCE
(Instructions for SCHEDULE 4 are on page 10 )
Report stocks for the following fuels:
Coal (tons)
Residual oil (No.5 and No.6 fuel oils)(barrels)
Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels)
Petroleum coke (tons)
Include back-up fuels.
Include start-up and flame stabilization fuels.
Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero.
Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must bereportedseparately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form.
Enter zero ifthe plant has no stocks.Do not leave blank.
Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information.
Enter a comment if the balance does not equal zero.
inergy Source Type Of
Units
Prior Month's
Ending Stocks
Current Month's
Receipts
Current Month's
Consumption
Adjustments
To Stocks
Current Month's
Ending Stocks
Balance Comment (ifbalance is not zero please enter a comment)
\265,416McfNG 265,416 0 0<k
<TV
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Plant.57028 Langley Gulch Power PlantYear:2013
Month:3
rrm EIA-923
SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-
FUELED PLANTS
This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam
turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion
turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts
total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C.
Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A.
Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see
instructions for definition ofnet generation).
Complete a separate row for each Generator ID (see page ten of the instructions).
'rime
dover
Generator Generator
Status
Gross Generation Net Generation
Id (MWh)(MWh)
CA STG OP
r
YcA
OMBNo.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2013
Month:3
Plant:57028 Langley Gulch Power PlantirmEIA-923
SCHEDULE 5.PART B.PRIME MOVER-LEVEL
GENERATION
From Combustible Energy Sources
(Instructions for SCHEDULE 5.Part.B.are on page 12.)
This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined-
cycle
plants whose steam portion of the operation is under 1 0 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines.
Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the
total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not
measured (see instructions for definition of net generation).
Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions).
Prime
Mover
Gross Generation Net Generation
(MWh)
{*)40,532
(MWh)
y£39,198CT
-1
c
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration
Year:2013
Month 3
Plant:57028 Langley Gulch Power Plant:>rm EIA-923
SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY
SOURCES
This schedule will be completed by all nuclear plants and by all wind,solar,geothcrmal,hydroelectric,or other plants where the energy source is
noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energysourcefornuclear,wind,solar,geothcrmal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat.
Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by
generating unit.
In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the
total
generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured
(see instructions for definition ofnet generation).
Complete a separate row for each Prime Mover Type (see Table 7 of the instructions).
Prime
Mover
Unit CodeEnergy Gross Generation (MWh)Net Generation (MWh)
Source
c
V
OMB No.1905-0129
Approval Expires 12/31/2013
nergy Information Administration Year:2013
Month 3
Plant:57028 Langley Gulch Power PlantjrmEIA-923
SCHEDULE 9.COMMENTS
Schedule Part CommentsItem
Includes reservation/transport fee lor all plants $731,157-5626
c
tiergy Information Administration OMB No.1905-0129
Approval Expires 12/31/2013
Year:2013
Month:3
Plant:57028 Langley Gulch Power PlantrrmEIA-923
Errors
Purchase Fuel Schedule Prime
Mover
Equipment Supplier Error
Num
Error Description/
Override CommentTypeType
Code
Id