Energy Information Administration Month.^Year-2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department ofthe United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date 18-MAR-15
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip
Email
Boise
chobbs@idahopower.com
ID 83707
Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
cr
y
Contact Randy Henderson
0OperationsFinanceLeaderTitle
t>pAddressBox70
\¦C
VW IdCity/State/Zip Boise
rhenderson@idahopower.com
ID 83707
Email Phone (208)388-2290 Fax (208)388-2521 rC\'
Report For
Idaho Power CoCompanyName
Plant Name
Plant ID
Plant Address
Plant City
Evander Andrews Power Complex
Plant County J7953
as1862NWMtHomeHwyDistRd
Mountain Home Plant State ID
[XI ?Yes NoRegulated
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?*Yes NoCHP
CHP Efficiency
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year;j 5
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1 .are on page 3.)
V
m?Was Fuel purchased this month?Yes No
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy Liquids:BarrelsSourceGases:MCF
(MMYY)
VARIOUS (NATURAL GAS SPOT PURCHASES
DNI.Y)
S NG 0 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:j Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Average Heat Sulfur Content
Content
Ash Content Predominant Secondary Supply Delivery
Contract ContractChloride
Unavailable Mode Mode
Percent weight
to nearest
Type TypeMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0.01%
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
ONLY)
S NG 0 0 PL?Yes ?Yes
fx]No fx]No
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly E1A923 Power Plant Operations Report
2 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Purchase Coal Mine
State
Energy Quantity
Source
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier
Type MSHA ID Type
Form ApprovalU.S.Department of Energy
Energy Information Administration M(|nlh
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Ifyou are an annual respondent with a generator naineplate capacity of 10MVV or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplale capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy
Source
Quantity
Consumed
Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0 01%)
Ash
Content,
(coal only,to
nearest 0.1%)
Code
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration vionth:
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant;7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Quantity ConsumedEnergy Type Of Units Avg Heat
Content,
(as burned)
(MMBtu per ton.
barrel,or Mcf)
Prime Mover Peaking Unit Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
GT NG 0 Mcf 1 .0000 GT 0 -196
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year.2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
i*ia usi;
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity
Consumed
Units Average Heat Content EIAUSE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation(Group code)Code ID Code (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 p'ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-ftlled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Energy
Source
Gross Generation (MWh)Net Generation (MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Coal:
Residual Oil:
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End of Month/
Year Stocks
Fuel Balance Comments for AdjustmentsSource
A B C D E F O H
NG Mcf 0 0 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.^Year:2015
Monthly EIA923 Power Plant Operations Report
Plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillatc-lype oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part ofnegative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name of the plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month.
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Quantity ofFuel Shipped to PlantFuelType
A CB D
U.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:7953 Evander Andrews Power Complex
Form Approval
Month:OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Changes in Ownership (Provide name of purchaser and date sold.)
U.S.Department of Energy
Energy Information Administration
Form ApprovalMonthlyEIA923PowerPlantOperationsReport
Month:2 Year:2015 plant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 p,ant:7953 Evander Andrews Power Complex OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1 974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality ofinformation in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE 1.IDENTIFICATION
Survey Contact
Cheryl Hobbs Submit Date 18-MAR-15Contact
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip ID 83707Boise
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
Title Operations Finance Leader
yAddressBox70
y o rCity/State/Zip Boise ID 83707
o'Email rhenderson@idahopower com Phone (208)388-2290 (208)388-2521Fax
(>t LhReportFor
Company Name
Plant Name
Idaho Power Co
Bennett Mountain
wPlantIDPlantCountyElmore55733
cy
Plant Address 1015 West Hays St.
Plant City Mountain Home Plant State ID
?no Yes NoRegulated
For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923?mYes No
<CHP
[CHP Efficiency
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
No x?Was Fuel purchased this month?Yes
Contract Information Purchases Cost per Unit
Quantity Total Delivered
Cost
Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase
Type or
tolling
Agreement
Contract
Expiration
Date
Energy
Source Liquids:Barrels
Gases:MCF
(MMYY)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:j Year:2015 p,ant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
0 01%
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
?Yes I I Yes
?No n No
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Monih:2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/3 1/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Coal Mine
State
Purchase Energy Quantity
Source
Coal Mine Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier
Type MSHA ID Type
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,ofassociated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
Quantity
Consumed
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Energy Units Avg Heat
Content.
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Sulfur
Content,
(petroleum and
coal only,to
nearest 0.01%)
Ash
Content,
(coal only,to
nearest 0.1 %)
Code Source
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity I0MW or Above
Generation
Gross GenerationReport
Month
Generator Net Generation
Id (MWh)(MWh)
?
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits AvgHeat Prime Mover Peaking Unit Gross Generation Net GenerationSourceContent,Code (Yes/No)(MWh)(MWh)(as burned)
(MMBtu per ton,
barrel,or Mcf)
GT NG Mcf0 0.0000 GT Y -1 120
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month:2 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Units Average Heat Content BIA USE
(High Heating Value)ONLY
(Group code)
Energy
Source
Quantity
Consumed
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation(Group code)Code ID Code (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant;55733 Bennett Mountain OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDE1LE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat,
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list.
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Gross Generation (MWh)Net Generation (MWh)Energy
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 2 Year 2015 Plant 55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSTL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units of measurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero if the plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom if the table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-Ifthe fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom of the table below.
Energy Units Previous Month/
Year Stocks
Purchases Consumption Adjustment to
Stocks
End ofMonth/
Year Stocks
Fuel Balance Comments for AdjustmentsSource
A CB 11D F G H
NG Mcf 0 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity of Fuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
Short Tons
Barrels
Barrels
Short Tons
-Enter zero if no shipments were made to this plant this month
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant
A B C D
Form ApprovalU.S.Department of Energy
Energy Information Administration MorUh,
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant;55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormE1A-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Changes in Ownership (Provide name of purchaser and date sold.)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 2 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover IDType Rpt Month Supplier Error Number &Description Ranges Override Comment
Form ApprovalU.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
Month 2 Year:2015 Plant:55733 Bennett Mountain OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
.1
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines,
civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and
the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and
willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction.
SCHEDULE!.IDENTIFICATION
Survey Contact
Contact Cheryl Hobbs Submit Date 18-MAR-15
Title Joint Venture Accountant
Address PO Box 70
City/State/Zip Boise ID 83707
Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180
Supervisor of Contact Person for Survey
Contact Randy Henderson
\<7
\^Title Operations Finance Leader
\Address Box 70
VOov€
City/State/Zip
Email
Boise
rheiiderson@idahopower.corn
ID 83707 <?_
IPhone(208)388-2290 Fax (208)388-2521
9ReportFor
3 I'*\-V
A*1
Company Name Idaho Power Co
Plant Name Langley Gulch Power Plan!
Plant County
Interstate 84 and Highway 30
New Plymouth
Plant ID 57028 PAYETTE
Plant Address
Plant City Plant State ID
?Yes NoRegulated
3\
For contact detail go to http://www.eia.doe.goV/oss/forms.html#eia-923?Yes No
CHP
CHP Efficiency
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Month
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART A.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
CONTRACT INFORMATION,RECEIPTS,AND COSTS
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 1.are on page 3.)
?Was Fuel purchased this month?Yes No
Contract Information Purchases Cost per Unit
Total Delivered
Cost
Quantity Commodity
Cost (coal,natural gas)
Solids:Tons Cents per MMBtu,to
the nearest
0.1 cents
Cents per MMBtu,to
the nearest
0.1 cents
Fuel Supplier Name Purchase Contract
Expiration
Date
Energy Liquids:BarrelsTypeorSourceGases:MCFtolling
Agreement (MMYY)
VARIOUS (NATURAL GAS SPOT PURCHASES
ONLY)
S NG 0 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month:
Form EIA-923
SCHEDULE 2.PART B.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
QUALITY OF FUEL AND TRANSPORTATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 2.are on page 4.)
Contract Information Quality of Fuels Received Fuel Transportation Natural Gas
Mercury Content
Moisture Mercury Mercury Chloride
Contnet Content Unavailable Content
Chloride Content Contract Information
Supply Delivery
Contract Contract
Type Type
Average Heat Sulfur Content
Content
Ash Content Predominant SecondaryChloride
Unavailable Mode Mode
Percent weight
to nearestMillionBtus
Quantity (MMBtus)
per unit
Percent weight
to nearest
Parts per
Million,or
enter 999 if
not available
Mode used to
transport fuel
over the
longest
distance
Mode used to
transport fuel
over the
second longest
distance
Fuel Supplier Purchase Energy
Type Source 0.01%
0 01%
VARIOUS
(NATURAL
GAS SPOT
PURCHASES
I ONLY!
s NG 0 0 PL?Yes ?Yes
fx]No |~xl No
Form ApprovalU.S.Department of Energy
Energy Information Administration Month:
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 2.PART C.COST AND QUALITY OF FUEL RECEIPTS -PLANT LEVEL
COAL MINE INFORMATION
For fossil-fueled plants 50 megawatts and above
(Instructions for SCHEDULE 2.Page 3.are on page 7.)
Purchases (From Schedule 2,Part A)Coal Mine Information
Energy Quantity
Source
Coal Mine Coal Mine
State
Purchase Coal Mine Coal Mine
Name
Coal Mine
County
Fuel Supplier
MSHA IDType Type
Form ApprovalU.S.Department ofEnergy
Energy Information Administration Mon||r
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
If you are an annual respondent with a generator nameplate capacity of 10MW or above,report an individual Schedule 3,Part A for each month in the reporting year/.
Plants with a generator nameplate capacity of 10MW or above report fuel consumption for each boiler and electric power generation for each generator,in groups,of associated boilers and
generators at this plant:
Generators with Nameplate Capacity 10MW or Above
Fuel Consumption
EIA USE
ONLY
(Group Code)
Report
Month
Prime Mover Boiler Id Boiler Status Avg Heat
Content,
(High Heating Value)
(MMBtu per ton,
barrel,or Mcf)
Energy Quantity
Consumed
Units Sulfur
Content,
(petroleum and
coal only,to
nearest 0,01%)
Ash
Code Source Content,
(coal only,to
nearest 0.1%)
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Mon(h:
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plaTlt:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART A.BOILER AND GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS
FUEL CONSUMPTION AND GENERATION
Generators with Nameplate Capacity 10MW or Above
Generation
Report
Month
Generator Gross Generation Net Generation
Id (MWh)(MWh)
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/3 1/2017
Month
Form EIA-923
SCHEDULE 3.PART B.FUEL AND GENERATION INFORMATION FOR SINGLE CYCLE GAS TURBINES,
INTERNAL COMBUSTION ENGINES,HYDROELECTRIC PUMPED STORAGE,AND COMPRESSED AIR
STORAGE
Fuel Consumption and Generation
Fuel Consumption Generation
Prime
Mover
Energy Quantity Consumed Type OfUnits Avg Heat
Content
(as burned)
(MMBtu per ton,
barrel,or Mcf)
Peaking UnitPrimeMover Gross Generation Net GenerationSource
Code (Yes/No)(MWh)(MWh)
r
Specify other fuel:
Form ApprovalU.S.Department of Energy
Energy Information Administration Month.
Monthly EIA923 Power Plant Operations Report
2 Year.2015 plant;57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 3.PART C.FUEL AND GENERATOR INFORMATION FOR
COMBINED-CYCLE PLANTS
Prime Mover CT
CA Turbine Generators With Nameplate Capacity 10MW or Abov
Fuel Consumption Generation
EIA USE
ONLY
Prime Boiler/Boiler
Mover Generation Status
Energy
Source
Quantity
Consumed
Units Average Heat Content EIA USE
(High Heating Value)ONLY
(Group code)
Prime
Mover
Generator Generator
Status
Gross
Generation
NetReport
Month
Report
Month ID Generation
(Group code)Code ID Code (MWh)(MWh)
(I -553I1CAOPING0Mcf0.000 I CT GTGI OP
I1 CT GTG NG 0 Mcf 0.000 11 CA STG OP 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 Plai1t;57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017
Month
Form EIA-923
SCHEDULE 3.PART D.
GENERATION FROM NUCLEAR,NONCOMBUSTIBLE,AND RENEWABLE ENERGY SOURCES
Complete an individual Schedule 3,Part C for each nuclear plant and all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such
as purchased steam or waste heat.Do not report for combined cycle plants,which belong on Schedule 3D.
-No fuel consumption is required for these types of plants.
-Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric and miscellaneous source4s such as purchased steam or waste heat.
-Report nuclear data by generating unt.
-Complete a separate row for each prime mover type.
Column A:Prime Mover CodeL Select the prime mover code from the drop down list.
Column B:Energy Source:Select the energy source code from the drop down list,
Column C:Nuclear Unit CodeL This muct match the nuclear unit code reported on the Form EIA-860 (and is pre-filled for the online forms.)
Column D:Gross Generation:
-Enter the aggregate generation for prime movers of a single type,in MWh
-Report gross generation for Industrial or Commercial Sector plants only if net generation is not measured.
Column E:Net Generation:
-Enter the gross generation minus the parasitic station load (i.e.,station use,)in MWh.
-Enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all wind turbines.
Prime
Mover
Unit Code
(nuclear units)
Energy Gross Generation (MWh)Net Generation (MWh)
Source
Form ApprovalU.S.Department of Energy
Energy Information Administration Month-
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART A.FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE
For Coal,Oil and Natural Gas Plants
Report stocks for Coal,Residual oil (No.5 and No.6 fuel oils),DistilIate-type oils (No.2 oil,jet fuel and kerosene),and Petroleum coke.
-Central fuel terminals are required to fill both Schedules 4A and 4B.
Include back-up fuels,start-up,and flame stabilization fuels.
Do not report stocks for waste coal,natural gas,waste oil,or biomass.
Column A:Energy Source,and Column B:Units:Apply the following units ofmeasurement for each fuel stock report:
Short Tons
Barrels
Coal:
Residual Oil:
Distillate-Type Oils:Barrels
Petroleum Coke:Short Tons
Column C:Ending Month/Year Stocks:
-Enter zero ifthe plant has no stocks.Do not leave blank.
-Stocks held off-site that cannot be assigned to an individual plant are reported as stocks held at the central fuel storage site(s).
-Report each central fuel storage site separately
-Identify the new storage sites for this schedule on Schedule 9:Comments.
Column D,E and F:
-These columns contain data from Schedules 2 and 3,and the previous month (or year)report,respectively.
-These data are pre-populated on the online forms.
Column G:Adjustments to Stocks:
-Enter adjustments to stocks when the calculated fuel balance is not zero.
-These adjustments may be either positive,negative (having a negative sign),or zero.
-Explain any non-zero adjustments in the "Comments for Adjustments"Section at the bottom ifthe table below.
Column H:Fuel Balance:
-For coal and oil,calculate the fuel balance as the difference between consumed,received and stocked fuel and the reported ending stocks.
-For natural gas,calculate the fuel balance as the difference between consumed and received natural gas.
-If the fuel balance does not equal zero,enter an adjustment in Column G to balance the fuel use.
-Explain any Column G adjustments in the "Comments for Adjustments"Section at the bottom ofthe table below.
Units Previous Month/
Year Stocks
PurchasesEnergy Consumption Adjustment to
Stocks
End of Month/Fuel Balance Comments for AdjustmentsSourceYearStocks
A B C D E F G H
NG Mcf 00 0 0
Form ApprovalU.S.Department of Energy
Energy Information Administration Molllh;
Monthly EIA923 Power Plant Operations Report
2 Year.2015 plant:57028 Langley Gulch Power Plant OMR No.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 4.PART B.FOSSIL FUEL DISTRIBUTION FROM CENTRAL FUEL TERMINALS TO POWER PLANTS
Report distribution of coal,residual oil (No.5 and No.6 fuel oils),Distillate-type oils (No.2 oil,jet fuel,and kerosene),and petroleum coke.
Do NOT report fuel in transit on Schedule 4,Part B.Report fuel in transit on Schedule 4,Part A,as part of negative adjustments.
Column A:Plant ID:Enter the Plant ID for the plant to which fuels were distributed.
Column B:Plant Name:Enter the name ofthe plant to which fuels were distributed.
Column C:Fuel Type:Report fuel type using energy source codes.
Column D:Quantity ofFuel shipped to Plant.
-Report the quantity of fuel Shipped to Plant in the following units:
Short Tons
Barrels
Barrels
Short Tons
Coal:
Residual Oil:
Distillate-Type Oils:
Petroleum Coke:
-Enter zero if no shipments were made to this plant this month
FUEL TERMINAL -PLANT RELATIONSHIPS AND FUEL SHIPMENTS
Plant ID Plant Name Fuel Type Quantity ofFuel Shipped to Plant
A B C D
U.S.Department ofEnergy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant
Form Approval
Month:OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
SCHEDULE 9.COMMENTS
(Instructions for SCHEDULE 9.are on page 20.)
Schedule Part Item
Changes in Ownership (Provide name of purchaser and date sold.)
Form ApprovalU.S.Department of Energy
Energy Information Administration Month'
Monthly EIA923 Power Plant Operations Report
2 Year:2015 p,ant;57028 Langley Gulch Power Plant OMBNo.1905-0129
Approval Expires 05/31/2017FormEIA-923
ERRORS
Purchase Prime Equipment
Fuel Schedule Mover ID ErrorNumber &Description Ranges Override CommentSupplierTypeRptMonth
Form ApprovalU.S.Department of Energy
Energy Information Administration
Monthly EIA923 Power Plant Operations Report
2 Year:2015 plant:57028 Langley Gulch Power Plant OMB No.1905-0129
Approval Expires 05/31/2017FormEIA-923
3
Hobbs,Cheryl
Ortiz-Hamilton,Fredericka (CONTR)[Fredericka.Ortiz-Hamilton@eia.gov]
Thursday,March 19,2015 10:03 AM
Hobbs,Cheryl
RE:Submitted 923 m error
From:
Sent:
To:
Subject:
Okay thanks
Fredericka Ortiz
IMG Inc./IMG-Crown ESJV
Contractor
202-586-4662
From:Hobbs,Cheryl I"mailto:CHobbs(S)idahopower-com1
Sent:Thursday,March 19,2015 10:28 AM
To:Ortiz-Hamilton,Fredericka (CONTR)
Subject:Submitted 923 m error
Hi,
I submitted my reports yesterday which were all zero reports.
I noticed this morning that on
Plant 57028 Langley Gulch I should have put negative net generation but I failed to make it negative.Net generation on
the CT should be -553 instead of positive 553.
Everything else is zero the plant did not run.
Can you please make that correction for me.
Thanks
Cheryl
IDAHO
ft5PGWI/B
This transmission may contain information that is privileged,confidential and/or exempt from disclosure under applicable law If you are not the intended recipient,you are herebynotifiedthatanydisclosure,copying,distribution,or use ofthe information contained herein (including any reliance thereon)is STRICTLY PROHIBITED Ifyou received this
transmission in error,please immediately contact the sender and destroy the material in its entirety,whether in electronic orhard copy format Thank you.
1