HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 11.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Cheryl HobbsContact Title Joint Venture Accountant Accept By Accept Date PO Box 70Address City/State/Zip Boise ID 83707 chobbs@idahopower.comEmail Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Title Randy Henderson Operations Finance Leader Box 70Address City/State/Zip Boise ID 83707 Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name PlantName Plant ID Idaho Power Co Evander Andrews Power Complex Plant County 1862 NW Mt Home Hwy Dist Rd Mountain Home 7953 kPaxPlantAddress Plant City Plant State ID j y"i xCHP No For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923RegulatedNo I vt V-'-mi wC 31^1<J Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) lY |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All FuelsAllFuels Supplier Quantity Total Delivered Cost Contract Type Contract Expiration Date Energy Source Commodity Cost (coal,natural gas Solids:Tons Liquids:Barrels Gases.MCF (MMYY)Cents per MMBtu,to the nearest 0.1 cents Various (natural gas spot Purchases oni vi NG <? Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural Gas Only Coal,Pet Coke,OilAllFuels Coal Only Coal,Pet Coke and Oil Supplier Contract Type Sulfur ContentContract Expiration Date Heat Content Energy Source Ash Mercury Firm or Content Interrupt- Prcdominant Secondary ModeModeContent Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% (VARIOUS (N IHJIM MASKS ONI Yj ATURAL GAS SPOT NG PL ) Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Name Contract Type Contract Expiration Date (MMYY) Coal Mine Coal Mine Type Coal Mine State Coal Mine County Energy Source MSHA ID (VARIOUS (NATURAL GAS SPOT PURCIIASI-S ONLY)?NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Quantity Sulfur Content, (petroleum and coal only,to nearest 0.01%) Energy Type Of Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) Ash Source Units Content, (coal only,to nearest 0.1%) If Energy source reported is OTH,OBS,OBG,OBL,or OG, please specify Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type Of Units Avg Heat Content. (as burned) (MMBtu per ton, barrel,or Mcl) GT NG 0,000(10Mcf If Energy source reported is OTH,OBS,OBG, OBL,or OG,please specify <JV Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No,5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) McfNG 0 0 0 O Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fiiel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) <D Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:7953 Evander Andrews Power Complex Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the tuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) jt/-168\V°GT \ Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:7953 Evander Andrews Power Complex Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source 0 V U.S.Department ofEnergy Energy Information Administrati EIA923 Power Plant Operations Report Plant:7953 Evander Andrews Power Complex Form Approval ion Year:2014 Month:2 Form EIA-923 OMB No.1905-0129 Approval Expires 12/31/2013 SCHEDULE 9.COMMENTS Schedule Part Item Comments I V Form ApprovalEIA923PowerPlantOperationsReport Year:2014 plant:7953 Evander Andrews Power Complex Month 2 U.S.Department of Energy Energy Information Administration OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Error Description/ Override Comment Error Nurn Equipment SupplierPrime Mover ScheduleFuelPurchase IdType Code Type O Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Title Joint Venture Accountant PO Box 70Address City/Statc/Zip Boise ID 83707 Email chobbs@idahopower.com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Email Boise ID 83707 rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For Company Name PlantName Plant ID Idaho Power Co Bennett Mountain 55733 1015 West Hays St. Mountain Home Plant County Elmore Plant Address Plant City Plant State ID X No No Yes |X j Yes CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated b-7 . Re if 3(3-4 14 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) N |No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Costper Unit All FuelsAllFuels Supplier QuantityContractTypeContract Expiration Dale Total Delivered Cost Commodity Cost (coal,natural gas Energy Source Solids:Tons Liquids:Barrels(MMYY)Cents per MMBtu,to the nearest 0.1 cents Gases:MCF Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month.2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation Natural Gas Only All Fuels Coal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Supplier Contract Type Contract Expiration Date Sulfur ContentEnergy Source Heat Content Ash Mercury Firm or Content Interrupt- Prcdominant Secondary Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus(MMYY)Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance 0.01%(MMBtus) per unit 0.01%0.01% Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal MineContractTypeContract Expiration Date Coal Mine Coal Mine Name Coal Mine State Coal Mine County Energy Source MSHA ID Type (MMYY) \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:55733 Bennett Mountain Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s !(If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Quantity Sulfur Content, (petroleum and coal only,to nearest 0.01%) Energy Source Type Of Avg Heat Content, (as bumed) (MMBtu per ton, barrel,or Mcf) Ash Units Content, (coal only,to nearest 0.1 %) IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify > Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 2 OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 1 0 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). [|(Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Prime Mover Energy Source Type Of UnitsQuantity Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) 1 ,00001GTNG19,247 Mcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify Vr-> Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Slocks held off-site that cannot be assigned to an individual plant arc to be reporled as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 ofthis form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current;Month's Receipts Current Month's Consumption Current Month's Ending Stocks Balance Comment (if balance is not zero please enter a comment)Adjustments To Stocks <3^ Mr Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:55733 Bennett Mountain Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types of prime movers (combustion turbines,IC engines,wind,or hydro-clcctric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5.PARTS B or C. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (see page ten of the instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:55733 Bennett Mountain Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 1 0 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWhj (MWh) {I 7»GT AV 1,836 rO Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p,ant:55733 Bennett Mountain Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothennal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PAR T B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year.2014 plant'55733 Bennett Mountain Month:2 OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report 2014 Plant:55733 Bennett Mountain Form Approval Year:OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Month:2 Errors Purchase Type Fuel Schedule Prime Mover Equipment Supplier Error NumType Error Description/ Override CommentId Code Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Plant:57028 Langley Gulch Power PlantYear:2014 Month 2 Form EIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Contact Cheryl Hobbs Tille Joint Venture Accountant Accept By Accept Date PO Box 70Address City/Slate/Zip Boise chobbs@idahopower.com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address City/State/Zip Boise ID 83707 Email rhenderson@idahopowet'.com (208)388-2290 Fax (208)388-2521Phone Report For \ Idaho Power Co Langley Gulch Power Plant Plant County Interstate 84 and Highway 30 Mew Plymouth Company Name Plant Name Plant ID Plant Address Plant City 57028 PAYETTE Plant State ID Yes '^!No X I Yes 1 j No CHP For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923Regulated c \ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2014 Month:2 Plant:57028 Langley Gulch Power PlantFormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date QuantityEnergy Total Delivered Cost Commodity Cost (coal,natural gasSource Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF 1\VARIOUS (NATURAL GAS SPOT 'UKCUASES ONLYj ARIOUS (NATURAL GAS SPOT URCHASES ONLY! ws24,urn 466 1NG 463.1$ £t-"¦s NG 1 ,077,738 7743 ff 7-/\y Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report OMB No.1905-0129 Approval Expires 12/31/2013 Year:2014 Month:2 Plant:57028 Langley Gulch Power Plant Form EIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality ofFuels Received Fuel Transportation All Fuels Natural GasCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and Oil Only Supplier Contract Type Contract Expiration Date Energy Source Sulfur ContentHeat Ash PredominantMercuryFirmor Content Interrupt- Sccondary ModeContentContentMode Percent weight to nearest Percent weight to nearest ible (MMYY)Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance Mode used to transport fuel over the second longest distance (MMBtus)0.01% per unit 0.01%0.01% VARIOUS (NATURAL GAS SPOT 'PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLYj S NG F PL NG PLSIF c Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete forAll Fuels Coal Mine Type If you have provided the MSHA ID number,leave these items blank Supplier Contract Type Contract Expiration Date Energy Coal Mine Coal Mine Type Coal Mine Name Coal Mine State Coal Mine CountySourceMSHAID (MMYY) VARIOUS (NATURAL GAS SPOT PI 'RCHASliS ONLY) •VARIOUS (NATURAL GAS SPOT pURCT IASFS ONLY) S NG S NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month 2 OMB No.1905-0129 Approval Expires 12/31/2013 Form EIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRTC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.If this does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (Ifapplicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Prime Boiler Status Mover Id Quantity Sulfur AshEnergyTypeOfAvgHeat Content, (as burned) (MMBtu per ton, barrel,or Met) Source Content, (coal only,to nearest 0 I%) Units Content, (petroleum and coal only,to nearest 0.01%) OP 0 Mcf 1CA1NG IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify c N Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 p'ant;57028 Langley Gulch Power Plant Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRTME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers ofa single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (If applicable,please check.)Was steam produced for purposes otherthan electric power generation during this reporting period? Prime Mover QuantityEnergy Source Type OfUnits Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) V I 1.00(10CTNG1,101,846 Mcf IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 Plant:57028 Langley Gulch Power Plant Month,2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil.No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form, Enter zero if the plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Prior Month's Comment (ifbalance is not zero please enter a comment)Energy Source Type Of Units Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Ending Stocks NG Mcf 1,101,846 1,101,846 0 0 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will he completed ONLY fur generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation forall other types ofprime movers (combustion turbines,fC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,gcothcrmal,or other energy sources on SCHEDULE 5.PARTS B orC. Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3.Part A. Industrial or Commercial CIIP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Generator ID (sec page ten ofthe instructions). Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) CA STG OP 0 cfl Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 U.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 plant:57028 Langley Gulch Power Plant Month:2 Form EIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3,Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) fir 162,012:fCT 164,979 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2014 P|ant 57028 Langley Gulch Power Plant Month 2 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source c v U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report 2014 plant:57028 Langley Gulch Power Plant Form Approval OMB No.1905-0129 Approval Expires 12/31/2013 Year: Form EIA-923 Month:2 SCHEDULE 9.COMMENTS Schedule Part Item Comments 2 6 Transportation/reservation of approx $693k included for all llircc plants. U.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report 2014 Plant:57028 Langley Gulch Power Plant Form Approval Year: Form EIA-923 OMB No.1905-0129 Approval Expires 12/31/2013 Month:2 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Type Error NumType Error Description/ Override CommentId Code v