Loading...
HomeMy WebLinkAbout20170808IPC to Staff Request 12 Attachment 1.pdfForm ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact >Submit By Submit Date Accept By Accept Date Cheryl HobbsContact Joint Venture AccountantTitle PO Box 70Address 2m/City/State/Zip Boise chobbs@idahopower com ID 83707 Email Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Randy Henderson Operations Finance Leader Contact Title Box 70Address City/State/Zip Boise ID 83707 Email rhenderson@idahopower.com (208)388-2290 Fax (208)388-2521Phone Report For %Company Name Plant Name Idaho Power Co Evander Andrews Power Complex Plant CountyPlantID7953 Plant Address 1 862 NW Mt Home Hwy Dist Rd Mountain HomePlantCity Plant State ID '720***'CHP x NoYes For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 3/c/zzRegulatedxYesNo Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p,ant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Contract Type Contract Expiration Date Energy Source Quantity Total Delivered Cost Commodity Cost (coal,natural gas Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0 1 cents Gases:MCF I t/ f-ffm ^ J-371 1 iX 1239 3 l/ 374 2 p 41,329 5,667 S VARIOUS (NATURAL GAS SPOT [PURCHASES ONLYj VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG S NG / Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month;\ OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Fuel TransportationQualityofFuelsReceived Natural Gas Coal,Pet Coke and OilAllFuelsCoal,Pet Coke,Oil Coal Only Only Sulfur Content Ash Mercury Firm or Content Interrupt- Predominant SecondaryHeat Content Supplier Contract Type Contract Expiration Date Energy Source Mode ModeContent Percent weight to nearest Percent weight to nearest ible Mode used to transport fuel over the longest distance Million Btus Percent weight to nearest Mode used to transport fuel over the second longest distance (MMYY) 0 01%(MMBtus) per unit 0.01%0 01% NG F PLVARIOUS(NATURAL GAS SPOT PURCHASES ONLY)_ VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG F PLS <7- o Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Name Contract Type Contract Expiration Date Energy Source Coal Mine Coal Mine State Coal Mine CountyMSHAIDType (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) S NG S NG Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:\ OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Quantity Type Of Sulfur AshPrimeBoilerStatus Mover Id Energy Source Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Content, (petroleum and coal only,to nearest 0 01%) Content, (coal only,to nearest 0.1%) Units If Energy source reported is OTH,OBS,OBG,OBL,orOG, please specify V Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine ofthe instructions). (If applicable,please check )Was steam produced for purposes other than electric power generation during this reporting period? Quantity Type OfUnitsPrime Mover Energy Source Avg Heat Content, (as burned) (MMBtu per ton, barrel,or Mcf) )/>46,996IN(i I 0000McfGT IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment if natural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment if the balance does not equal zero. Energy Source Type Of Prior Month's Ending Stocks Current Month's Consumption Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment)Current Month's Receipts Current Month's Ending StocksUnits \/af JP/46,996McfNG46,996 0 0 S" N Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above.Report generation for all other types ofprime movers (combustion turbines,1C engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5 PARTS B or C Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3 Part A Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition ofnet generation) Complete a separate row for each Generator ID (see page ten ofthe instructions). Net GenerationPrime Mover Gross GenerationGeneratorGenerator Status (MWh)(MWh)Id Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion of the operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh) 5,445 (MWh) GT f f X<77 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types of plants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers ofa single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CF1P Plants may report ONLY gross generation if net generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Unit Code Gross Generation (MWh)Net Generation (MWh)Energy Source < o Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:7953 Evander Andrews Power Complex Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part CommentsItem 1 Total price includes a reservation fee.2 Z2 Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 p,ant:7953 Evander Andrews Power Complex Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 Errors Error Description/ Override Comment Equipment SupplierPurchaseFuelSchedulePrime Mover Error NumIdTypeType Code Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month:1 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 NOTICE:This report is mandatory under the Federal Energy Administration Act of 1974 (Public Law 93-275).Failure to comply may result in criminal fines, civil penalties and other sanctions as provided by law.For further information concerning sanctions and data protections see the provision on sanctions and the provision concerning confidentiality of information in the instructions.Title 18 USC 1001 makes it a criminal offense for any person knowingly and willingly to make to any Agency or Department of the United States any false,fictitious,or fraudulent statements as to any matter within its jurisdiction. SCHEDULE 1.IDENTIFICATION Survey Contact Submit By Submit Date Accept By Accept Date Contact Cheryl Hobbs PTitleJointVentureAccountant PPOBox70Address; City/State/Zip Boise ID 83707 Email chobbs@idahopower com Phone (208)388-5614 Fax (208)433-5180 Supervisor of Contact Person for Survey Contact Randy Henderson Operations Finance LeaderTitle Box 70Address c J City/State/Zip Boise ID 83707 Email rhenderson@idahopower com (208)388-2290 Fax (208)388-2521Phone OS*Report For Company Name Plant Name . Idaho Power Co Bennett Mountain Plant County ftPlantID55733Elmore 4t\j~.«Plant Address Plant City 1015 West Hays St Mountain Home Plant State ID CHP ^NoYes Bl^17-For contact detail go to http://www.eia.doe.gOv/oss/forms.html#eia-923 Regulated X Yes No Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 1.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL CONTRACT INFORMATION,RECEIPTS,AND COSTS For fossil-fueled plants 50 megawatts and above (Instructions for SCHEDULE 2.Page 1 .are on page 3.) Y No Receipts Is there a fuel tolling agreement in place for this plant? Contract Information Complete for All Fuels Receipts Cost per Unit All Fuels All Fuels Supplier Quantity Total Delivered Cost Commodity Cost (coal,natural gas Contract Type Contract Expiration Date Energy Source Solids:Tons (MMYY)Liquids:Barrels Cents per MMBtu,to the nearest 0.1 cents Gases:MCF VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) 'ING Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 2.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL QUALITY OF FUEL AND TRANSPORTATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Quality of Fuels Received Fuel Transportation Natural GasCoal,Pet Coke,Oil Coal Only Coal,Pet Coke and OilAllFuels Only Ash Mercury Firm or Content Interrupt- PredominantSupplierSulfurContent SecondaryContractTypeContract Expiration Date Energy Source Heat Content Content Mode Mode Percent weight to nearest Percent weight to nearest ible Million Btus Percent weight to nearest Mode used to transport fuel over the longest distance (MMYY)Mode used to transport fuel over the second longest distance (MMBtus)0.01% 0 01%0.01%per unit VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NG PL Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 2.PAGE 3.COST AND QUALITY OF FUEL RECEIPTS - PLANT LEVEL COAL MINE INFORMATION For fossil-fueled plants 50 megawatts and above Contract Information Complete for All Fuels Coal Mine Type Ifyou have provided the MSHA ID number,leave these items blank Supplier Coal Mine Coal Mine Coal Mine Name Coal Mine State Coal Mine County Contract Type Contract Expiration Date Energy Source MSHA ID Type (MMYY) VARIOUS (NATURAL GAS SPOT PURCHASES ONLY) NG 1<r Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART A.BOILER INFORMATION FOR STEAM-ELECTRIC ORGANIC-FUELED PLANTS -FUEL CONSUMPTION This schedule will be completed by plants with a total steam turbine capacity of 10 megawatts and above that burn organic fuels. Report only fuels consumed in the boilers,or for HRSGs in duct burners.Report consumption in combustion turbines or IC engines on SCHEDULE 3.PART B.Ifthis does not apply,go to SCHEDULE 3.PART B.Complete a separate row for each Boiler ID (see page s (If applicable,please check.)Did any boiler produce steam for purposes other than electric power generation during this reporting period? Sulfur AshPrimeBoilerStatus Mover Id Quantity Type Of Avg Heat Content (as burned) (MMBtu per ton, barrel,orMet) Energy Source Content, (coal only,to nearest 0.1%) Content, (petroleum and coal only,to nearest 0 01%) Units IfEnergy source reported is OTH,OBS,OBG,OBL,or OG, please specify £CP Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 plant:55733 Bennett Mountain Month:\ OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 3.PART B.FUEL CONSUMPTION -PRIME MOVER-LEVEL Report fuel consumed by plants with organic-fueled steam turbine capacity UNDER 10 MW,AND ALL combustion turbines, IC engines,and pumped storage hydroelectric units.Aggregate quantity consumed for prime movers of a single type.In other words,all natural gas consumed by all combustion gas turbines should be reported as one number.Report pumping energy in megawatthours for pumped-storage plants.Complete a separate row for each Prime Mover Type (see page nine of the instructions). (Ifapplicable,please check.)Was steam produced for purposes other than electric power generation during this reporting period? Type OfUnitsPrime Mover Avg Heat Content (as burned) (MMBtu per ton, barrel,or Mcf) Energy Source Quantity McfGTNG IfEnergy source reported is OTH,OBS,OBG, OBL,or OG,please specify Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 4 FOSSIL FUEL STOCKS AT THE END OF THE REPORTING PERIOD AND THE DATA BALANCE (Instructions for SCHEDULE 4 are on page 10 ) Report stocks for the following fuels: Coal (tons) Residual oil (No.5 and No.6 fuel oils)(barrels) Distillate-type oils (including diesel oil,No.2 oil,jet fuel and kerosene)(barrels) Petroleum coke (tons) Include back-up fuels. Include start-up and flame stabilization fuels. Do not report stocks for waste coal,natural gas or wood waste.Do enter a comment ifnatural gas balance does not equal zero. Stocks held off-site that cannot be assigned to an individual plant are to be reported as stocks held at a central storage site.Each central storage site must be reported separately.New sites should be indicated in the Comment Section,located in SCHEDULE 9 of this form. Enter zero ifthe plant has no stocks.Do not leave blank. Enter adjustments to stocks.An adjustment can be positive or negative.See instructions for additional information. Enter a comment ifthe balance does not equal zero. Energy Source Type Of Units Prior Month's Ending Stocks Current Month's Receipts Current Month's Consumption Current Month's Ending Stocks Adjustments To Stocks Balance Comment (if balance is not zero please enter a comment) NG Mcf 0 0 0 V Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month:1 OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART A.GENERATOR INFORMATION FOR STEAM-ELECTRIC ORGANIC- FUELED PLANTS This schedule will be completed ONLY for generators at steam-electric organic-fueled plants with a total steam turbine capacity of 10 megawatts and above Report generation for all other types ofprime movers (combustion turbines,IC engines,wind,or hydro-electric turbines),and steam turbine plants with less than 10 megawatts total capacity or fueled by nuclear,solar,geothermal,or other energy sources on SCHEDULE 5 PARTS B or C Generation reported on SCHEDULE 5,Part A corresponds to the fuel consumption reported on SCHEDULE 3 Part A Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation) Complete a separate row for each Generator ID (see page ten ofthe instructions) Prime Mover Generator Generator Status Gross Generation Net Generation Id (MWh)(MWh) Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month X OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART B.PRIME MOVER-LEVEL GENERATION From Combustible Energy Sources (Instructions for SCHEDULE 5.Part.B.are on page 12.) This schedule will be completed by steam-electric organic-fueled plants with a total steam turbine capacity less than 10 megawatts,by combined- cycle plants whose steam portion ofthe operation is under 10 MW,and ALL IC engines,combustion turbines,and pumped-storage hydroelectric turbines. Generation reported on this schedule corresponds to the fuel consumption reported on SCHEDULE 3.Part B. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation if net generation is not measured (see instructions for definition ofnet generation). Complete a separate row for each Prime Mover Type (see Table 7 ofthe instructions). Prime Mover Gross Generation Net Generation (MWh)(MWh) GT 0 -124 <5^ Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month:J OMB No.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 5.PART C.GENERATION FROM NUCLEAR AND OTHER NONCUMBUSTIBLE ENERGY SOURCES This schedule will be completed by all nuclear plants and by all wind,solar,geothermal,hydroelectric,or other plants where the energy source is noncombustible,such as purchased steam or waste heat.No fuel consumption is required for these types ofplants.Report generation by energy source for nuclear,wind,solar,geothermal,conventional hydroelectric,and miscellaneous sources such as purchased steam or waste heat. Do not report generation at a combined-cycle plant.All combined-cycle generation is reported on SCHEDULE 5.PART B.Report nuclear data by generating unit. In the applicable Gross Generation or Net Generation cell,enter the aggregate generation for prime movers of a single type.For example,enter the total generation from all combustion turbines.Industrial or Commercial CHP Plants may report ONLY gross generation ifnet generation is not measured (see instructions for definition of net generation). Complete a separate row for each Prime Mover Type (see Table 7 of the instructions). Prime Mover Unit CodeEnergy Source Gross Generation (MWh)Net Generation (MWh) O1 Form ApprovalU.S.Department ofEnergy Energy Information Administration EIA923 Power Plant Operations Report Year:2012 Plant:55733 Bennett Mountain Month J OMBNo.1905-0129 Approval Expires 12/31/2013FormEIA-923 SCHEDULE 9.COMMENTS Schedule Part Item Comments Form ApprovalU.S.Department of Energy Energy Information Administration EIA923 Power Plant Operations Report Plant:55733 Bennett Mountain OMBNo.1905-0129 Approval Expires 12/31/2013 Year:2012 Month:X Form EIA-923 Errors Purchase Fuel Schedule Prime Mover Equipment Supplier Error Description/ Override Comment Error NumIdTypeType Code