IN THE MATTER OF THE COMMISSION'S
REVIEW OF PURPA QF CONTRACT
PROVISIONS INCLUDING THE
SURROGATE AVOIDED RESOURCE (SAR)
AND INTEGRATED RESOURCE PLANNING
(IRP) METHODOLOGIES FOR
CALCULATING PUBLISHED AVOIDED
COST RATES.
CASE NO. GNR-E-11-03
COMMISSION STAFF'S
RESPONSE TO THE FIRST
PRODUCTION REQUEST OF
TWIN FALLS CANAL COMPANY
AND NORTH SIDE CANAL
COMPANY
The Staff of the Idaho Public Utilities Commission, by and through its attorney of record,
Kristine A. Sasser, Deputy Attorney General, responds as follows to the Twin Falls Canal
Company and North Side Canal Company's First Production Request to Commission Staff.
REQUEST FOR PRODUCTION NO. 1: Please provide an electronic copy in the
original software with all the formulae intact of the work-paper files used to produce Exhibit
No. 303.
STAFF'S RESPONSE TO THE FIRST
PRODUCTION REQUEST OF TFCC AND
NSCC 1 JUNE 1, 2012
RESPONSE TO REQUEST NO. 1: Please see the attached spreadsheets entitled
"Exhibit 303 .xlsx" and "Updated Avoided Cost Model.xlsm". The first spreadsheet consists of the
graph shown in Exhibit No. 303. In the second spreadsheet, the worksheet entitled "Avoid New"
calculates the values used in the graph. Specifically, refer to cells D20 and AP27. In the same
spreadsheet, the worksheet entitled "New Data" includes data used in the calculations in "Avoid
New." The remaining worksheets summarize the levelized and non-levelized rates resulting from
"Avoid New" for each utility.
This response was prepared by Dr. Cathleen M. McHugh, Utilities Analyst. Dr. McHugh will be
the sponsor at hearing.
REQUEST FOR PRODUCTION NO. 2: Please provide an electronic copy in the
original software with all the formulae intact of all work-paper files used to produce Exhibit
No. 304.
RESPONSE TO REQUEST NO. 2: Please see the attached spreadsheets entitled "Staff
Ex 304 graph.xlsx." The figures used in Exhibit No. 304 were computed by the utilities, not by
Staff; consequently, Staff does not possess the original software used to generate the results
presented in Exhibit No. 304.
This response was prepared by Rick Sterling, Engineering Supervisor. Mr. Sterling will be the
sponsor at hearing.
DATED at Boise, Idaho, this 1" day of June 2012.
a.
Kristi e A. Sasser
Deputy Attorney General
Technical Staff: Rick Sterling
Cathleen McHugh
i:umisc/prodreq response/gnre 11 .3ksrpscm staff response to tfcc nscc V pr.doe
STAFF'S RESPONSE TO THE FIRST
PRODUCTION REQUEST OF TFCC AND
NSCC 2 JUNE 1, 2012
$120
$100
(I) tn tn
tn
$80 t--,
I-i C-)
- $60
C)
tn
C)
C) —I $40
$20
rr
_ - u
Cr
cD9
F
\ 11113
119
Iq
Dedbctons to acn foi' integration and for transmLssk*osts and are Included for aft utikties
Comparison of Proposed SAR Methodology Rates
Levelized Rates for 20-yr Contract Term, January 2013 Online Date
$120
C c..
10V9
0
$100
$80
D $60
U N
C(T1
)p
$40
$20
$0
-
- 0
\
VZO~
119
c-
,
$36.68 $37.07
Idaho Power Company
PURPA IRP Methodology
Levelized value for 20 year Contract term coming online in January 2013
Comparison of Proposed IRP Methodology Rates
Levelized Rates for 20-yr Contract Term, January 2013 Online Date
Ene
r-
(I) rJ
tn
tj
- - .
t'J (0 00 0
0 .
C' (0
ITI
(J
C
a
Natural Gas Price Forecast
2012 REPORT. EARLY RELEASE - JANUARY 2012
by Year FUEL COS1
YEAR (2010$ per MMBtu) ($ per MMBtu) $IMWh
2009 4.49 4.44 31.53
2010 5.02 5.02 35.63
2011 4.16 4.24 30.11
2012 3.98 4.09 29.07
2013 3.91 4.07 28.89
2014 3.76 3.97 28.21
2015 3.98 4.29 30.43
2016 4.01 4.41 31.28
2017 4.18 4.68 33.21
2018 4.39 5.01 35.59
2019 4.55 5.30 37.66
2020 4.67 5.55 39.42
2021 5.00 6.06 43.02
2022 5.34 6.60 46.87
2023 5.52 6.97 49.51
2024 560 7.22 5127
2025 5.63 7.41 52.59
2026 5.80 7.78 55.21
2027 6.02 8.24 58.48
2028 610 8.51 60.41
2029 6.10 8.67 61.57
2030 6.15 8.92 63.31
2031 6.30 9.31 66.07
2032 6.48 9.74 69.16
2033 6.64 10.17 72.21
2034 682 10.64 75.51
AVOIDED COST CALCULATION MODEL Version 10
Idaho Public Utilities Commission 513112012
PRELIMINARY
1.Choose Utility pcp V.
2.Choose Condition
Nul
Note: Currently this model does not compute Fueled rates correctly. •1
3.Choose specific resource 0
2
20-yr Levelized rate 7
2012 on-line date: 45.08 8
Ii3 Clme ti,j,. 4890 Used in 9
2014 on-fine, date: 48.95 10
2015 on-line date: 51.30 11
2016 on-line date: 53.70 12
2017 on-line date: 56.23 13
14
15
INPUT
DATA
PCP
DATA
UR J
"SAR PLANT LIFE (YEARS) 30
SAR" PLANT COST ($/k%) 1313.00
BASE YEAR OF "SAR COST 2008
"SAR CAPACITY FACTOR (%) 90.0%
HEAT RATE (BTU/kW) 7,100
JTIUTY WEIGHTED COST OF CAPITAL (%): 7.980%
RATEPAYER DISCOUNT RATE (%) 7.980%
SAR FIXED O&M ($/IcS) 14.57
'SAR" VARIABLE O&M (s/MiMi) 1.77
CURRENT YEAR GAS PRICE ($/MMBTU 4.09
CURRENT YEAR FUEL COST (S/MW,) 2907
BASE YEAR, O&M EXPENSES 2008
BASE YEAR FUEL COST NjjjR#M@M
ESCALATION RATE; "SAR" (%) 140%
r
ESCALATION RATE; O&M (%) 200%
ADJUSTABLE PORTION ($/M) 000 To
CAPITAL CARRYING CHARGE (% 11.662%
LEVEL CARRYING COST ($/M)
'TILTING RATE (%) 1.401Z
TYPE OF RATES. NON-FUELED
CURRENT YEAR 2012
16
17
18
19
20
21
22
23
24
25
General inflation rate: 2.0% per year
Note: The Annual Energy Outlook includes both a real and nominal fomca
be updated when model is capable of computing 'Fueled'
Updated Avoided Cost Model.xlsm
CERTIFICATE OF SERVICE
I HEREBY CERTIFY THAT I HAVE THIS 1ST DAY OF JUNE 2012,
SERVED THE FOREGOING STAFF RESPONSE TO THE FIRST PRODUCTION
REQUEST OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY, IN CASE NO. GNR-E-11-03, BY E-MAILING AND MAILING A COPY
THEREOF, POSTAGE PREPAID, TO THE FOLLOWING:
DONOVAN E WALKER
JASON B WILLIAMS
IDAHO POWER COMPANY
P0 BOX 70
BOISE ID 83707-0070
MICHAEL G ANDREA
AVISTA CORPORATION
1411 EMISSION AVE
SPOKANE WA 99202
ROBERT D KAHN
NW & INTERMOUNTAIN POWER
PRODUCERS COALITION
1117 MINOR AVE STE 300
SEATTLE WA 98101
ROBERT A PAUL
GRAND VIEW SOLAR II
15690 VISTA CIRCLE
DESERT HOT SPRINGS CA 92241
THOMAS H NELSON
RENEWABLE ENERGY COALITION
P0 BOX 1211
WELCHES OR 97067
R GREG FERNEY
MIMURA LAW OFFICES PLLC
2176 E FRANKLIN RD
STE 120
MERIDIAN ID 83642
DANIEL E SOLANDER
TED WESTON
ROCKY MOUNTAIN POWER
201 S MAIN ST STE 2300
SALT LAKE CITY UT 84111
PETER J RICHARDSON
GREGORY M ADAMS
RICHARDSON & O'LEARY
515N 27Th STREET
BOISE ID 83702
DON STIJRTEVANT
ENERGY DIRECTOR
J R SIMPLOT COMPANY
P0 BOX 27
BOISE ID 83707-0027
JAMES CARKULIS
EXERGY DEVELOPMENT GROUP OF
IDAHO LLC
802 W BANNOCK ST STE 1200
BOISE ID 83702
JOHN R LOWE
RENEWABLE ENERGY COALITION
12050 SW TREMONT ST
PORTLAND OR 97225
BILL PISKE MGR
INTERCONNECT SOLAR
DEVELOPMENT LLC
1303 E CARTER
BOISE ID 83706
CERTIFICATE OF SERVICE
RONALD L WILLIAMS WADE THOMAS
WILLIAMS BRADBURY DYNAMIS ENERGY LLC
1015 W HAYS ST 776 E RIVERSIDE DR
BOISE ID 83702 STE 15
EAGLE ID 83616
BRAIN OLMSTEAD MEGAN WALSETH DECKER
GENERAL MANAGER SR STAFF COUNSEL
TWIN FALLS CANAL CO RENEWABLE NW PROJECT
P0 BOX 326 421 SW 6TH AVE STEI125
TWIN FALLS ID 83303 PORTLAND OR 97204
TED DIEHL BILL BROWN CHAIR
GENERAL MANAGER BOARD OF COMMISSIONERS
NORTH SIDE CANAL CO OF ADAMS COUNTY ID
921 N LINCOLN ST P0 BOX 48
JEROME ID 83338 COUNCIL ID 83612
TED S SORENSON P E GLENN IKEMOTO
BIRCH POWER COMPANY MARGARET RUEGER
5203 SOUTH ll EAST IDAHO WINDFARMS LLC
IDAHO FALLS ID 83404 672 BLAIR AVE
PIEDMONT CA 94611
M J HUMPHRIES ARRON F JEPSON
BLUE RIBBON ENERGY LLC BLUE RIBBON ENERGY LLC
3470 RICH LANE 10660 SOUTH 540 EAST
AMMON ID 83406 SANDY UT 84070
DEAN J MILLER BENJAMIN J OTTO
MeDEVI1T & MILLER LLP ID CONSERVATION LEAGUE
P0 BOX 2564 P0 BOX 844
BOISE ID 83701 BOISE ID 83702
KEN MILLER MARV LEWALLEN
SNAKE RIVER ALLIANCE CLEARWATER PAPER CORP
BOX 1731 STEIIOO
BOISE ID 83701 601 W RIVERSIDE AVE
SPOKANE WA 99201
ENERGY INTEGRITY PROJECT
TAUNA CHRISTENSEN
769N 1100E
SHELLEY ID 83274
3 ~(QnQ"
SECIZETARY
CERTIFICATE OF SERVICE