HomeMy WebLinkAbout20120419Exergy 44-51 to IPC.pdfPeter J. Richardson
Gregory M. Adams
Richardson & O'Leary, PLLC
515 N. 27th Street
P.O. Box 7218
Boise, Idaho 83702
Telephone: (208) 938-7901
Fax: (208) 938-7904
peter@richardsonandoleary.com
gmg@richardsonandolearv.com
Attorneys for Exergy Development Group of Idaho, LLC
1912 APR 19 PM 3:06
IDAHO PUb [JTLITIES COMMSSJON
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE COMMISSION'S )
REVIEW OF PURPA QF CONTRACT ) CASE NO. GNR-E-1 1-03 PROVISIONS INCLUDING THE ) SURROGATE AVOIDED RESOURCE ) FOURTH PRODUCTION REQUEST PLANNING (IRP) METHODOLOGIES FOR ) OF EXERGY DEVELOPMENT
CALCULATING PUBLISHED AVOIDED ) GROUP OF IDAHO TO IDAHO
COST RATES ) POWER COMPANY
Pursuant to Rule 225 of the Rules of Procedure of the Idaho Public Utilities Commission
(the "Commission"), Exergy Development Group of Idaho, LLC hereby requests that Idaho
Power Company ("Idaho Power" or "Company") provide responses to the following with
supporting documents, where applicable, as soon as possible, but no later than May 10, 2012.
This production request is to be considered as continuing, and Idaho Power is requested
to provide by way of supplementary responses additional documents that it or any person acting
on its behalf may later obtain that will augment the responses or documents produced.
Please provide one physical copy of your responses to the address above, and electronic
copies, if available, to Mr. Richardson and Mr. Adams at the addresses noted above, and one
copy to Dr. Reading at 6070 Hill Road, Boise, Idaho 83703. Please provide Dr. Reading's copy
in electronic format, if available, to dreadingmindspring.com . Please begin each response on
a separate page and provide page numbers on responses longer than one page.
For each item, please indicate the name of the person(s) preparing the answers, along
with the job title of such person(s) and the witness at hearing who can sponsor the answer.
REQUEST FOR PRODUCTION NO. 44:
Please provide all documents containing policies for implementing curtailment of QFs under
Schedule 72. If no such policy exists, please state so. If a policy exists, please indicate:
(a)How the policy was developed;
(b)Whether this policy has ever been approved or reviewed by the Idaho PUC;
(c)Whether this policy has been made publicly available;
(d)Whether this policy has been made available to affected QFs.
REQUEST FOR PRODUCTION NO. 45:
For each QF curtailment the Company has implemented under Schedule 72 in the years 2009,
2010, 2011 and 2012, please provide:
(a)date;
(b)hour of day;
(c)duration of curtailment;
(d)notice given to QFs prior to curtailment;
(e)control area load and system load during the hours of the curtailment event and in each of
the 24 hours before and each of the 24 hours after such curtailment.
(f)generation levels for all Company-owned resources during the event.
REQUEST FOR PRODUCTION NO. 46:
Please explain how the Company's policy for curtailment proposed for Schedule 74 differs from
that for its policy for curtailment for Schedule 72. Please include explanation of how many
incremental additional hours of annual curtailment are expected to be required by the Company's
proposed Schedule 74 curtailment policy.
Page 2— FOURTH PRODUCTION REQUEST OF EXERGY
TO IDAHO POWER - GNR-E-1 1-03
REQUEST FOR PRODUCTION NO. 47:
Reference the Company's Response to Exergy Request No. 19(d).
(a)Please confirm that the Company's position is that the licenses and state water quality
certifications for these plants allow for the Company to spill or otherwise bypass flows
without generating electricity for system reliability or emergency purposes. If the
Company does not believe its permits and licenses allow it to stop generating electricity
at any of the plants for system reliability concerns, please state so and identify the
plant(s).
(b)For each of the identified run-of-river hydro projects, please explain the duration of time
the plant can be generating at full output (given available water flow) after a spill or
bypass event.
REQUEST FOR PRODUCTION NO. 48:
For the Hells Canyon Complex, please explain the current limitations on the rate of increase in
outflow (feet of water level per hour, etc.) from each of the three dams. If the restriction differs
by time of year, please explain the differences.
REQUEST FOR PRODUCTION NO. 49:
Reference the Response to Exergy Request No. 21(b), describing an expected minimum
generation condition at the Hells Canyon Complex of 300 MW at 8,500 cfs outflow and 550
MW at outflows of 14,000 cfs. For each of these minimum generation conditions, please explain
the maximum generation ramping rate (MW increased output per minute, or other available
units) that can be expected from the Hells Canyon Complex given the limitations on increased
outflow described in response to Request No. 48 above.
REQUEST FOR PRODUCTION NO. 50:
For each of the three dams in the Hells Canyon Complex, please provide the increase in outflow
in cfs for an hour when the outflow increase causes the water level reading on the USGS gauge
below the each dam to increase by one foot.
REQUEST FOR PRODUCTION NO. 51:
For each of the three dams in the Hells Canyon Complex, please list the flow (in cfs) through the
dam and the electrical output (MW) at the following generation levels:
(a)at full capacity;
(b)the least amount of generation operationally possible above 0 MW for the plant;
Page 3— FOURTH PRODUCTION REQUEST OF EXERGY
TO IDAHO POWER — GNR-E- 11-03
(c) each increment of 100 MW (e.g. 100 MW, 200 MW, 300 MW, etc.) between the MW
values identified in (a) and (b).
DATED: April 19,2012
Peter J. Richardson
Gregory M. Adams
RICHARDSON & O'LEARY PLLC
Page 4— FOURTH PRODUCTION REQUEST OF EXERGY
TO IDAHO POWER - GNR-E-1 1-03
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 19th day of April, 2012, a true and correct copy of the
within and foregoing FOURTH PRODUCTION REQUEST OF EXERGY DEVELOPMENT
GROUP OF IDAHO, LLC. TO IDAHO POWER COMPANY was served as shown to:
Jean D. Jewell, Secretary - Hand Delivery
Idaho Public Utilities Commission •_U.S. Mail, postage pre-paid
472 West Washington - Facsimile
Boise, Idaho 83702 X Electronic Mail
jean.jewell(puc.idaho.gov
Donald Howell Hand Delivery
Kris Sasser _U.S. Mail, postage pre-paid
Idaho Public Utilities Commission - Facsimile
472 West Washington X Electronic Mail
Boise, Idaho 83702
donald.howell@i,uc.idaho.ov
krisine.sasser(puc.idaho.gov
Donovan E. Walker - Hand Delivery
Jason B. Williams _U.S. Mail, postage pre-paid
Idaho Power Company - Facsimile
P0 Box 70 X Electronic Mail
Boise, ID 83707-0070
dwalker@idahopower.com
jwilliamsidahopower.com
Michael G. Andrea Hand Delivery
Avista Corporation U.S. Mail, postage pre-paid
P.O. Box 3727 Facsimile
Spokane, WA 99220 X Electronic Mail
michael.andrea(2iavistaeorp.com
Daniel Solander - Hand Delivery
PacifiCorp/dba Rocky Mountain Power _U.S. Mail, postage pre-paid
201 S Main St Ste 2300 - Facsimile
Salt Lake City, UT 84111 Electronic Mail
daniel.solander(i),pacificorp.com
Dean J. Miller -Hand Delivery
McDevitt & Miller, LLP _U.S. Mail, postage pre-paid
420 W. Bannock St. _Facsimile
Boise, ID 83702 X Electronic Mail
joe@.mcdevitt-miller.com
John R. Lowe - Hand Delivery
Consultant _U.S. Mail, postage pre-paid
Renewable Energy Coalition - Facsimile
12050 SW Tremont St X Electronic Mail
Portland, OR 97225
jravenesanmarcos@yahoo.com
R. Greg Femey - Hand Delivery
Miniura Law Offices PLLC U.S. Mail, postage pre-paid
Interconnect Solar Development, LLC - Facsimile
2176 E Franklin Rd Ste 120 X Electronic Mail
Meridian, ID 83642
greg@Smimuralaw.com
Bill Piske, Manager Hand Delivery
Interconnect Solar Development, LLC U.S. Mail, postage pre-paid
1303 E. Carter - Facsimile
Boise, ID 83706 X Electronic Mail
billpiske@cableone.net
Ronald L. Williams - Hand Delivery
Williams Bradbury, PC _U.S. Mail, postage pre-paid
1015 W. Hays Street - Facsimile
Boise, ID 83702 X Electronic Mail
rog@ILAIliamsbradbM.com
Wade Thomas - Hand Delivery
General Counsel U.S. Mail, postage pre-paid
Dynamis Energy, LLC Facsimile
776 W. Riverside Dr., Ste 15 X Electronic Mail
Eagle, ID 83616
wthomas@dynamisenergv.com
Brian Olmstead Hand Delivery
General Manager U.S. Mail, postage pre-paid
Twin Falls Canal Company - Facsimile
P0 Box 326 X Electronic Mail
Twin Falls, ID 83303
olmstead@tfcanal.com
Robert A. Paul Hand Delivery
Grand View Solar II _U.S. Mail, postage pre-paid
15690 Vista Circle - Facsimile
Desert Hot Springs, CA 92241 j Electronic Mail
robertapau108@gmail.com
James Carkulis - Hand Delivery
Exergy Development Group of Idaho, LLC U.S. Mail, postage pre-paid
802 W. Bannock, Ste 1200 - Facsimile
Boise, ID 83702 X Electronic Mail
jcarklisexervdeve1opment.com
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
Arron F. Jepson
Blue Ribbon Energy, LLC
10660 South 540 East
Sandy, UT 84070
arronesa@aol.com
M.J. Humphries
Blue Ribbon Energy, LLC
4515 S. Ammon Rd.
Ammon, ID 83406
blueribbonenergy@gmail.com
Ted Diehl
General Manager
North Side Canal Company
921 N. Lincoln St.
Jerome, ID 83338
nscanal@cableone.net
Bill Brown
Adams County Board of Commissioners
P0 Box 48
Council, IT 83612
bdbrown@frontiernet.net
Ted S. Sorenson, PE
Birch Power Company
5203 South 1101 East
Idaho Falls, ID 83404
ted(tsorenson.net
Glenn Ikemoto
Margaret Rueger
Idaho Windfarms, LLC
6762 Blair Avenue
Piedmont, CA 94611
alenthenvisionwind.com
margaret@envisionwind.com
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
- Hand Delivery
U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
Megan Walseth Decker Hand Delivery
Senior Staff Counsel _U.S. Mail, postage pre-paid
Renewable Northwest Project - Facsimile
917 SW Oak Street Ste 303 X Electronic Mail
Portland, OR 97205
megan(2imp.or
Benjamin J. Otto - Hand Delivery
Idaho Conservation League _U.S. Mail, postage pre-paid
710 N. Sixth Street (83 702) - Facsimile
P0 Box 844 X Electronic Mail
Boise, ID 83701
botto@idahoconservation.org
Liz Woodruff - Hand Delivery
Ken Miller _U.S. Mail, postage pre-paid
Snake River Alliance - Facsimile
P0 Box 1731 X Electronic Mail
Boise, ID 83701
kmiller@snakeriveralliance.org
lwoodruff@snakeriveralliance.org
Robert D. Kahn Hand Delivery
Executive Director U.S. Mail, postage pre-paid
Northwest & Intermountain Power Producers - Facsimile
Coalition X Electronic Mail
1117 Minor Ave., Ste 300
Seattle, WA 98101
rkahn(nippc.org
Don Sturtevant - Hand Delivery
Energy Director _U.S. Mail, postage pre-paid
J.R. Simplot Company - Facsimile
P0 Box 27 X Electronic Mail
Boise, ID 83707-0027
don.sturtevant@simplot.com
Mary Lewallen - Hand Delivery
Clearwater Paper Corporation _U.S. Mail, postage pre-paid
601 W Riverside Ave Ste 1100 - Facsimile
Spokane WA 99201 j Electronic Mail
marv.lewallen@clearwaterpaper.com
Dr. Don Reading
6070 Hill Rd
Boise ID 83703
dreadingmindspring.com
C. Thomas Arkoosh
Capitol Law Group, PLLC
205 N 10th St, 40' Floor
P0 Box 2598
Boise, ID 83701
tarkoosh@capitollawgroup.com
Tauna Christensen
Energy Integrity Project
769N 1100E
Shelley, ID 83274
tauna@energvintegritvproject.org
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
- Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
135 WTI