HomeMy WebLinkAbout20120406Canal Companies to IPC 20-29.pdfR EP V ED
C. Thomas Arkoosh, ISB No. 2253
CAPITOL LAW GROUP, PLLC
205 N. 10" St., 4th Floor
P.O. Box 2598
Boise, Idaho 83701-2598
Telephone: (208) 424-8872
Facsimile: (208) 424-8874
e-mail: tarkooshcapitollawgroup.com
IDAHO PUiL; UTILITIE$ COMMISSK)N
Attorneys for Twin Falls Canal Company, Inc.
and North Side Canal Company, Inc.
BEFORE THE IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE
COMMISSION'S REVIEW OF PURPA
QF CONTRACT PROVISION
INCLUDING THE SUBROGATE
AVOIDED RESOURSE (SAR) AND
INTEGRATED RESOURCE
PLANNING (IRP) METHODOLOGIES
FOR CALCULATING PUBLISHED
AVOIDED COST RATES.
Case No. GNR-E-1 1-03
SECOND PRODUCTION
REQUESTS OF TWIN FALLS
CANAL COMPANY AND NORTH
SIDE CANAL COMPANY TO
IDAHO POWER
Pursuant to Rule 225 of the Rules of Procedure of the Idaho Public Utilities Commission (the
"Commission"), Twin Falls Canal Company and North Side Canal Company hereby request that
Idaho Power provide responses to the following with supporting documents, where applicable, as
soon as possible, but no later than April 16, 2012. This production request is to be considered as
continuing, and Idaho Power is requested to provide by way of supplementary responses additional
documents that it or any person acting on its behalf may later obtain that will augment the responses
or documents produced.
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER - I
Please provide one physical copy of your responses to the address above, and electronic
copies, if available, to Mr. Arkoosh at the addresses noted above, Please begin each response on a
separate page and provide page numbers on responses longer than one page.
For each item, please indicate the name of the person(s) preparing the answers, along with
the job title of such person(s) and the witness at hearing who can sponsor the answer.
REQUEST FOR PRODUCTION NO. 20: In the prefiled testimony of Ms. Park describing
the Company's proposed Schedule 74, references are made to "must run" resources and the
following sentences describe hydro and coal resources (see page 20 line 5 through page 22 line 6).
However, Exhibit 5, Schedule 74 lists Langley Gulch as a "Base Load Resource." Please provide
copies of all available Siemens documents showing the operating parameters and specifications for
the Langley Gulch configuration (SGT6-5000F gas turbine and SST-700 and SST-900 steam
turbines) including cold start, warm start, and hot start times, minimum up times, minimum down
times, minimum capacity levels and planned maintenance parameters (for example, number of start-
ups or running time hours).
REQUEST FOR PRODUCTION NO. 21: With regard to Exhibit 5, please provide a
complete explanation on why IPC has included Langley Gulch in the list of Base Load Resources.
REQUEST FOR PRODUCTION NO. 22: With regard to the confidential EXCEL file
provided as Attachment 1 in response to Commission Staff's First Production Request, Request No.
2 (partial title: "IPCO Hourly Incremental Cost Wrkbk.xlsx"), please provide copies of all
documents relied upon by the Company in determining the minimum load value for the Langley
Gulch resource used in this analysis.
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -2
REQUEST FOR PRODUCTION NO. 23: Please provide an EXCEL workbook file
containing the hourly net generation level for each gas-fired resource--Bennett Mountain, Evander
Andrews Unit No. I (Danskin 1), Evander Andrews Unit No.2 (Danskin 2) Evander Andrews Unit
No. 3 (Danskin 3)--for the past four years (2008, 2009, 2010 and 2011).
REQUEST FOR PRODUCTION NO. 24: For each of the existing gas-fired units and
Langley Gulch, please describe and provide all the specific input parameters on how each unit was
modeled within AURORA.
REQUEST FOR PRODUCTION NO. 25: With regard to each of the existing gas-fired
units, please provide copies of all available manufacturer documents showing the operating
parameters and specifications for the unit including cold start, warm start, and hot start times,
minimum up times, minimum down times, minimum capacity levels and planned maintenance
parameters (for example, number of start-ups or running time hours).
REQUEST FOR PRODUCTION NO. 26: With regard to the AURORA simulation used
to create the confidential EXCEL workbook file provided as Attachment I in response to
Commission Staff's First Production Request, Request No. 2 (partial title: "IPCO Hourly
Incremental Cost Wrkbk.xlsx"), please provide an EXCEL file containing the IPC hourly loads at
the generation level (including losses) for each of the planning years (2013 —2030).
REQUEST FOR PRODUCTION NO. 27: With regard to the EXCEL files provided as
Attachments 3-6 in response to Commission Staff's First Production Request, Request No.2 (partial
title: "PURPA Project Pricing... MW.xlsx"), please provide all workpapers and other supporting
documents for the values contained in the worksheet entitled Capacity Cost 2016.
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -3
REQUEST FOR PRODUCTION NO. 28: With regard to the EXCEL files provided as
Attachments 3-6 in response to Commission Staff's First Production Request, Request No.2 (partial
title: 'PURPA Project Pricing.. . MW.xlsx"), the worksheet entitled Notes references the fact that the
avoided capacity values exclude the value of RECs. Please provide IPC's most recent projection of
the value of RECs for each planning year (2013-2030).
REQUEST FOR PRODUCTION NO. 29: With regard to the EXCEL files provided as
Attachments 3-6 in response to Commission Staff's First Production Request, Request No.2 (partial
title: "PURPA Project Pricing.. .MW.xlsx"), the worksheet entitled Cost ofCapacity distributes the
avoided capacity value across all expected generation for an equal $/MWh rate. Please explain if
other alternative methods were considered for assigning the avoided capacity cost to time periods
(such as assigning the avoided capacity cost to just heavy load hours) and why IPC believes the
proposed method is the most reasonable.
AD
DATED this(D day of April, 2012.
CAPITOL LAW GROUP, PLLC
By
C. Thomas Aiio'h, Of the Firm
Attorneys for Twin Falls Canal Company, Inc. and North
Side Canal Company, Inc.
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -4
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on this(t&ttay of April, 2012, I served a true and correct copy
of the foregoing upon each of the following individuals by causing the same to be delivered by the
method and to the addresses indicated below:
Jean Jewell, Commission Secretary U.S. Mail, postage prepaid
Idaho Public Utilities Commission Hand-Delivered
427 W. Washington St. Overnight Mail
Boise, Idaho 83702 Facsimile
_X_ Via E-Mail jean.iewelh2Iipuc.idaho.ov
Daniel Solander U.S. Mail, postage prepaid
Rocky Mountain Power Hand-Delivered
201 S. Main St., Ste. 300 Overnight Mail
Salt Lake City, UT 84111 Facsimile
_X_ Via E-Mail daniel.solaner@pacificorp.com
Ronald L. Williams
Williams Bradbury PC
1015 W. Hays St.
Boise, Idaho 83702
Bill Piske, Manager
Interconnect Solar Development, LLC
1303 E. Carter
Boise, Idaho 83706
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
_X_ Via E-Mail ron@williamsbradburv.com
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
_X_ Via E-Mail robertpau108gmail.com
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
X_ Via E-Mail gregmimura1aw.com
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
_X_ Via E-Mail billoiske@cableone.net
Robert A. Paul
Grand View Solar II
15690 Vista circle
Desert Hot Springs, CA 92241
R. Greg Ferney
Mimura Law Offices, PLLC
2176 E. Franklin Rd., Ste. 120
Meridian, Idaho 83642
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -5
Robert D. Kahn, Executive Director
Northwest and Intermountain Power
Producers Coalition
1117 Minor Ave., Ste. 300
Seattle, WA 98101
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
_X_ Via E-Mail rkahnnippc.org
Michael G. Andrea U.S. Mail, postage prepaid
Avista Corporation Hand-Delivered
1411 East Mission Ave. Overnight Mail
Spokane, WA 99202 Facsimile
X_ Via E-Mail michael.andrea@avistacorv.com
Dean J. Miller
McDevitt & Miller, LLP
P.O. Box 2564
Boise, Idaho 83701
Don Sturtevant, Energy Director
J.R. Simplot Company
P.O. Box 27
Boise, Idaho 83707
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
X_ Via E-Mail joe@mcdevitt-miller.com
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
_X Via E-Mail don.sturtevan@simulot.com
James Carkulis, Managing Member U.S. Mail, postage prepaid
Exergy Development Group of ID, LLC Hand-Delivered
802 W. Bannock St., Ste. 1200 Overnight Mail
Boise, Idaho 83702 Facsimile
X Via E-Mail
jcarkulisexergvdevelopment.com
M.J. Humphries U.S. Mail, postage prepaid
Blue Ribbon Energy LLC Hand-Delivered
4515 S. Ammon Rd. Overnight Mail
Ammon, Idaho 83406 Facsimile
_X_ Via E-Mail blueribbonenergvgmail.com
Brian Olmstead, General Manager
Twin Falls Canal Company
P.O. Box 326
Twin Falls, Idaho 83303
U.S. Mail, postage prepaid
Hand-Delivered
Overnight Mail
Facsimile
Via E-Mail o1mstead(jcanal.com
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -6
John R. Lowe U.S. Mail, postage prepaid
Consultant to Renewable Energy - Hand-Delivered
Coalition Overnight Mail
12050 SW Tremont St. Facsimile
Portland, OR 97225 _X_ Via E-Mail jravenesanmarcosvahoo.com
Donovan E. Walker U.S. Mail, postage prepaid
Jason B. Williams Hand-Delivered
Idaho Power Company Overnight Mail
P.O. Box 70 Facsimile
Boise, Idaho 83707-0700 X Via E-Mail dwalker(Jidahopower.com
williams@idahonower.com
Ted Sorensen PE U.S. Mail, postage prepaid
Birch Power Company Hand-Delivered
5203 South I 1k" East - Overnight Mail
Idaho Falls, Idaho 83404 Facsimile
X_ Via E-Mail ted(â.itsorenson.net
Bill Brown, Chair U.S. Mail, postage prepaid
Board of Commissioners of Adams Hand-Delivered
County, ID Overnight Mail
P.O. Box 48 Facsimile
Council, Idaho 83612 _X_ Via E-Mail bdbrownfrontiernet.net
Donald L. Howell, II U.S. Mail, postage prepaid
Kristine A. Sasser Hand-Delivered
Deputy Attorneys General Overnight Mail
Idaho Public Utilities Commission Facsimile
472 W. Washington St. _X_ Via E-Mail don.howellpuc.idaho.gov
Boise, Idaho 83702 kris.sasserouc.idaho.gov
Ken Miller U.S. Mail, postage prepaid
Snake River Alliance Hand-Delivered
P.O. Box 1731 Overnight Mail
Boise, Idaho 83701 Facsimile
_X_ Via E-Mail kmilIer(äsnakeriveralliance.org
Arron F. Jepsen U.S. Mail, postage prepaid
Blue Ribbon Energy, LLC Hand-Delivered
10660 South 540 East Overnight Mail
Sandy, UT 84070 Facsimile
_X_ Via E-Mail arrones@aol.com
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -7
Wade Thomas, General Counsel U.S. Mail, postage prepaid
Dynamis Energy, LLC Hand-Delivered
776 W. Riverside Dr., Ste. 15 Overnight Mail
Eagle, Idaho 83616 Facsimile
Via E-Mail wthomas@dvnamisenerSY.COm
Glenn Ikemoto U.S. Mail, postage prepaid
Margaret Rueger Hand-Delivered
Idaho Windfarms, LLC Overnight Mail
672 Blair Ave. Facsimile
Piedmont, CA 94611 _X_ Via E-Mail glennienvisionwind.com
margaretenvisionwind.com
Ted Diehl, General Manager - U.S. Mail, postage prepaid
North Side Canal Company Hand-Delivered
921 N. Lincoln St. Overnight Mail
Jerome, Idaho 83338 Facsimile
Via E-Mail nscanal@cableone.net
Megan Walseth Decker U.S. Mail, postage prepaid
Senior Staff Counsel Hand-Delivered
Renewable Northwest Project Overnight Mail
917 SW Oak St., Ste. 303 Facsimile
Portland, OR 97205 _X_ Via E-Mail meganrnp.org
Peter J. Richardson U.S. Mail, postage prepaid
Gregory M. Adams Hand-Delivered
Richardson & O'Leary, PLLC Overnight Mail
P.O. Box 7218 Facsimile
Boise, Idaho 83702 _X_ Via E-Mail peter@richardsonandolearv.com
gregrichardsonandolearv.com
Mary Lewallen U.S. Mail, postage prepaid
Clearwater Paper Corporation Hand-Delivered
601 W. Riverside Ave., Ste. 1100 Overnight Mail
Spokane, WA 99201 Facsimile
Via E-Mail
marv.lewallen@clearwaterpaper.com
Benjamin J. Otto U.S. Mail, postage prepaid
Idaho Conservation League Hand-Delivered
P.O. Box 844 Overnight Mail
Boise, Idaho 83701 Facsimile
_X_ Via E-Mail botto(idahoconservation.org
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -8
Thomas H. Nelson U.S. Mail, postage prepaid
Attorney at Law Hand-Delivered
P.O. Box 1211 Overnight Mail
Weiches, OR 97067-1211 Facsimile
_X_ Via E-Mail nelson@thnelson.com
-)
C. Thomas Arkoosh"
SECOND PRODUCTION REQUESTS OF TWIN FALLS CANAL COMPANY AND NORTH SIDE CANAL
COMPANY TO IDAHO POWER -9