HomeMy WebLinkAbout20120320Exergy 1-8 to PAC.pdfPeter J. FUchardson
Gregory M. Adams
FUchardson & O'Lear, PLLC
515 N. 27th Street
P.O. Box 7218
Boise, Idaho 83702
Telephone: (208) 938-7901
Fax: (208) 938-7904
peter(ichardsonandolear.com
greg~richardsonandoleary.com
RECEIVED
2012 MAR 20 PH 4: 08
Attorneys for Exergy Development Group of Idaho, LLC
BEFORE THE
IDAHO PUBLIC UTILITIES COMMISSION
IN THE MATTER OF THE COMMISSION'S )
REVIEW OFPURPA QF CONTRACT )
PROVISIONS INCLUDING THE )
SURROGATE AVOIDED RESOURCE )
PLANING (IRP) METHODOLOGIES FOR )
CALCULATING PUBLISHED AVOIDED )CaSTRATES )
)
CASE NO. GNR-E-II-03
FIRST PRODUCTION REQUEST OF
EXERGY DEVELOPMENT GROUP
OF IDAHO TO ROCKY POWER
POWER COMPANY
Pursuat to Rule 225 of the Rules of Procedure of the Idaho Public Utilities Commission
(the "Commission"), Exergy Development Group of Idaho, LLC hereby requests that Rocky
Mountain Power (or the "Company") provide responses to the following with supporting
documents, where applicable, as soon as possible, but no later than April 10,2012.
This production request is to be considered as continuing, and Rocky Mountan Power is
requested to provide by way of supplementa responses additional documents that it or any
person acting on its behalfmny later obtain that will augment the responses or documents
produced.
Please provide one physical copy of your responses to the address above, and electronic
copies, if available, to Mr. FUchardson and Mr. Adas at the addresses noted above, and one
copy to Dr. Reading at 6070 Hil Road, Boise, Idao 83703. Please provide Dr. Reading's copy
in electronic format, if available, to dreading~indsprig.com. Please begin each response on
a separate page and provide page numbers on responses longer than one page.
For each item, please indicate the name of the person(s) preparng the answers, along
with the job title of such person(s) and the witness at hearing who can sponsor the answer.
REQUEST FOR PRODUCTION NO.1:
Please provide a copy for the PowerPoint presentation the Company presented at the meeting to
present and discuss IRP Models at the Idaho Public Utilties Commission on December 15,2011.
Include all work papers, spreadsheets in electronic format with formulas intact, and model
outputs used in producing the PowerPoint presentation.
REQUEST FOR PRODUCTION NO.2:
For each of the five QF confguations presented in Table A of Kelcey Brown's Direct
Testimony, please provide work papers, spreadsheets in electronic format with formulas intact,
and model outputs used in producing the values found in Table A. For each of Company's gas-
fired generation plants, please list the anual capacity factor, by year, beginning in 2013 though
the end of the 20 year analysis period found in the model rus for each of the five QF
configurations.
REQUEST FOR PRODUCTION NO.3:
If the Company were to offer a Qualifying Facilty (QF) a contract with IRP Methodology
contract pricing with the methodology in effect on the date of this request, please state if the
assumptions in the rate calculation would be consistent with the assumptions included in the
2011 IRP Addendum to the 2011 IRP fied with the Idaho Public Utilties Commission on April
1,2011 (PAC-E-ll-lO). Please provide the following inputs that would be used in offering a QF
contract and indicate if the inputs are consistent with the 2011 IRP Addendum:
(a) Natural gas fuel forecast,
(b) Firm load forecast,
(c) Resource stack,
Page 2 - FIRST PRODUCTION REQUEST OF EXERGY
TO ROCKY MOUNTAIN POWER - GNR-E-II-03
(d) Forecast of the year and month of first futue peak load deficit.
REQUEST FOR PRODUCTION NO.4:
Reference the Resource Portfolio contained in1the Company's 2011 IRP Addendum (Table 3, p.
8), stating the Company plans to add a 625 MW CCCT in 2014. Please provide the prices the
Company would offer a QF that would provide power in the same configuration as the CCCT.
In other words, please ru the projected output of the 625 MW CCCT through the Company's
IRP Methodology as though it were a QF requesting contract pricing.
REQUEST FOR PRODUCTION NO.5:
According to the Commission's accepted "IRP Methodology" (IPUC Order No. 26576, IPC-E-
95-9) and IPUC Staff Witness FUck Sterling's direct testimony Exhibit 101, ''the avoided cost of
the QF project is the difference in the present value of the revenue requirements (PVRR)
between the base case resource plan and a modified resource plan that includes the QF resource."
(Exhibit 101, IPC-E-95-9, R. Sterling, page 14.) Please explain in detail how the Company
incorporates the "revenue requirement" as it would in filing for a certificate of public
convenience and necessity (i.e. retur of and on investment, all taes, etc.) in the calculation of
rates offered in contracts to QFs.
REQUEST FOR PRODUCTION NO.6:
Reference Direct Testimony of Kelcey Brown, pp. 9-10, stating,
The first simulation (the Base Simulation) calculates the PVR of the preferred portfolio.
The second simulation (the Avoided Cost Simulation) calculates the PVR of a modified
version of the preferred portfolio that includes the QF at no cost and includes the energy
impact associated with the deferral of a portion of the next avoidable CCCT in a maner
that maintains resource adequacy and system reliabilty equivalent to that of the Base
Simulation. The difference in PVRR from the GRID studies between the A voided Cost.
Simulation and the Base Simulation is used to determine the avoided energy cost. The
avoided energy cost does not include the benefit of deferrng the fixed costs of the next
avoidable CCCT.
Please provide an electronic copy of the GRID model along with an example, including all inputs
and outputs, of the above described method of finding avoided energy cost.
REQUEST FOR PRODUCTION NO.7:
Reference Direct Testimony of Kelcey Brown, p. 13, stating, "The Company updates the GRID
model based on the most recently available information each time a QF requests avoided cost
pricing. This includes updates related to new contracts, fuel prices, forward price cures, load
Page 3 - FIRST PRODUCTION REQUEST OF EXERGY
TO ROCKY MOUNTAIN POWER- GNR-E-II-03
forecasts and other assumptions." Please provide the curent updates to the GRID model that
would be applied to a QF requesting avoided cost pricing on the date of this production request.
REQUEST FOR PRODUCTION NO.8:
Please provide all data and work papers used to develop the capacity contrbutions of the five
generation types displayed in the table found on page 1 of Exhbit 201 (Techncal Appendix to
Kelcey Brown's direct testimony).
DATED:March 20,2012
Peter J. FUchardson
Gregory M. Adams
RICHARSON & O'LEARY PLLC
Page 4 - FIRST PRODUCTION REQUEST OF EXERGY
TO ROCKY MOUNTAIN POWER- GNR-E-II-03
CERTIFICATE OF SERVICE
I HEREBY CERTIFY that on the 20th day of March, 2012, a tre and correct copy of the
within and foregoing FIRST PRODUCTION REQUEST OF EXERGY DEVELOPMENT
GROUP OF IDAHO, LLC. TO PACIFICORP/dba ROCKY MOUNTAIN POWER was served
as shown to:
Jean D. Jewell, Secreta
Idaho Public Utilties Commission
472 West Washington
Boise, Idaho 83702
j ean.jewell(ßuc.idaho. gov
lL Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
X Electronic Mail
Donald Howell
Krs Sasser
Idaho Public Utilties Commission
472 West Washington
Boise, Idaho 83702
donald.howelltgpuc.idaho. gov
krisine.sasser~uc.idaho.gov
lL Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Donovan E. Walker
Lisa D. Nordstrom
Idaho Power Company
POBox 70
Boise, ID 83707-0070
dwalker(g1idahopower.com
lnordstromtgidahopower.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Michael G. Andrea
A vista Corporation
P.O. Box 3727
Spokane, W A 99220
michael.andrea~avistacorp.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Electronic Copies Ony:
Ken Kaufman
Lovinger Kaufman LLP
825 NE Multnomah Ste 925
Portland, OR 97232
Kaufantglklaw.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Daniel Solander
PacifiCorp/dba Rocky Mountain Power
201 S Main St Ste 2300
Salt Lake City, UT 84111
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
daniel.solander~pacificorp.com
Dean J. Miler
McDevitt & Miler, LLP
420 W. Banock St.
Boise, ID 83702
j oe($cdevitt-miler.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Thomas H. Nelson
Renewable Energy Coalition
PO Box 1211
Welches, OR 97067-1211
nelsontgthelson.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
JohnR. Lowe
Consultat
Renewable Energy Coalition
12050 SW Tremont St
Portand, OR 97225
jravenesanarcostgyahoo.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
R. Greg Ferney
Mimura Law Offices PLLC
Interconnect Solar Development, LLC
2176 E Franin Rd Ste 120
Meridian, ID 83642greg~uraw.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Bil Piske, Manager
Interconnect Solar Development, LLC
1303 E. Carer
Boise, ID 83706
bilpisketgcableone.net
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Ronald L. Wiliams
Wiliams Bradbur, PC
10 15 W. Hays Street
Boise, ID 83702
rontgwillamsbradbury.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Wade Thomas
General Counsel
Dynamis Energy, LLC
776 W. FUverside Dr., Ste 15
Eagle, ID 83616
wtomas~dynamisenergy.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Shelley M. Davis
Barker Rosholt & Simpson LLP
1010 W. Jefferson St (83702)
PO Box 2139
Boise, ID 83701
smd~idahowaters.com
Brian Olmstead
General Manager
Twi Falls Canal Company
POBox 326
Twin Falls, ID 83303
olmsteadtgtfcanal.com
Robert A. Paul
Grand View Solar II
15690 Vista Circle
Desert Hot Sprigs, CA 92241
robertpaul08~gmaii.com
James Carkuis
Exergy Development Group of Idaho, LLC
802 W. Banock, Ste 1200
Boise, ID 83702
jcarkulis~exergydevelopment.com
Arron F. Jepson
Blue FUbbon Energy, LLC
10660 South 540 East
Sandy, UT 84070
aronesq~aoi.com
M.J. Humphres
Blue FUbbon Energy, LLC
4515 S. Amon Rd.
Amon, ID 83406
blueribbonenergytg gmail. com
Ted Diehl
General Manager
Nort Side Canal Company
921 N. Lincoln St.
Jerome, ID 83338
nscanal~cableone.net
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre.;paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
.. Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
Bil Brown
Adams County Board of Commissioners
PO Box 48
Council, IT 83612
bdbrowntgfrontiernet.net
Ted S. Sorenson, PE
Birch Poer Company
5203 South 11th East
Idaho Falls, ID 83404
ted(ßtsorenson.net
Glenn Ikemoto
Margaret Rueger
Idaho Windfars, .LLC
6762 Blair Avenue
Piedmont, CA 94611
glenni(ßenvisionwid.com
margaret(ßenvisionwind.com
Megan Walseth Decker
Senior Staf Counsel
Renewable Nortwest Project
917 SW Oak Street Ste 303
Portand, OR 97205
megan~rnp.org
Benjamin J. Oto
Idaho Conservation League
710 N. Sixt Street (83702)
POBox 844
Boise, ID 83701
botto(ßidahoconservation.org
Ken Miler
Snake FUver Allance
PO Box 1731
Boise, ID 83701
kmiler(ßsnakeriveralliance.org
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
.. Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
.. Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
.. Electronic Mail
~ .
Robert D. Kah
Executive Director
Nortwest & Intermountain Power Producers
Coalition
1117 Minor Ave., Ste 300
Seattle, W A 98101
rkah~ippc.org
Don Stuevant
Energy. Director
J.R. Simplot Company
POBox 27
Boise, ID 83707-0027
don. stuevant(ßsimplot. com
Mar Lewallen
Clearater Paper Corporation
601 W FUverside Ave Ste 1100
Spokane W A 99201
mar.lewallen(ßclearaterpaper.com
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
-- Electronic Mail
_ Hand Delivery
_U.S. Mail, postage pre-paid
Facsimile
i ctronic Mail
ßL