HomeMy WebLinkAbout20230525AVU to IFG 76 Attachment B.pdf#Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 1 MASTER SCHEDULE ‐ MASTER SCHEDULE ‐ Jan 2021 (DD 31‐Jan‐21)705 518 04-May-20 A 16-Feb-23 130 2 Electrical Engineering Electrical Engineering Project Delivery Projects 705 518 04-May-20 A 16-Feb-23 130 3 Othello City SOthello City Substaon - New 705 518 04-May-20 A 16-Feb-23 130 4 PLANNING & DESIGPLANNING & DESIGN PHASE 419 232 04-May-20 A 29-Dec-21 290 5 Environmental & PerEnvironmental & Perming 167 84 04-May-20 A 27-May-21 192 6 OTH02-2030 Obtain Permits 167 84 69%04-May-20 A 27-May-21 192 Proj.Real Estate 7 Physcial DesignPhyscial Design 136 97 03-Dec-20 A 16-Jun-21 194 8 OTH02-23040 Prepare 60% Physical Design - ECI 30 10 80%03-Dec-20 A 12-Feb-21 199 Contract.ECI 9 OTH02-23050 Complete 60% Drafting - AVA 44 34 46%17-Dec-20 A 18-Mar-21 194 Drafting 10 OTH02-23060 Submit 60% Physical Design - ECI 2 2 0%19-Mar-21 22-Mar-21 194 Contract.ECI 11 OTH02-23070 Review 60% Design - Owner 15 15 0%23-Mar-21 12-Apr-21 194 Design.Site Civil 12 OTH02-23080 Prepare 90% Physical Design - ECI 20 20 0%13-Apr-21 10-May-21 194 Contract.ECI 13 OTH02-23090 Complete 90% Drafting - AVA 15 15 0%20-Apr-21 10-May-21 194 Drafting 14 OTH02-23100 Submit 90% Physical Design (Includes design calcs) 2 2 0%11-May-21 12-May-21 194 Contract.ECI 15 OTH02-23110 Review 90% Design - Owner 15 15 0%13-May-21 03-Jun-21 194 Design.Site Civil 16 OTH02-23120 Complete 100% design - ECI 3 3 0%04-Jun-21 08-Jun-21 194 Contract.ECI 17 OTH02-23130 Complete Drafting - AVA 3 3 0%09-Jun-21 11-Jun-21 194 Drafting 18 OTH02-37260 Order Steel - AVA 20 5 74%11-Jan-21 A 05-Feb-21 271 Design.Struct 19 OTH02-23140 Transmit Physical Design - ECI 3 3 0%14-Jun-21 16-Jun-21 194 Contract.ECI 20 Electrical DesignElectrical Design 183 183 12-Feb-21 29-Oct-21 126 21 OTH02-24000 Prepare 30% Electrical Design - ECI 15 15 0%12-Feb-21 04-Mar-21 99 Contract.ECI 22 OTH02-24010 Complete 30% Drafting - AVA 15 15 0%19-Feb-21 11-Mar-21 99 Drafting 23 OTH02-24020 Prepare Feeder Protection Maps - ECI 5 5 0%05-Mar-21 11-Mar-21 289 Contract.ECI 24 OTH02-24030 Submit 30% Electrical Design to AVA 1 1 0%12-Mar-21 12-Mar-21 99 Contract.ECI J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 1 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 1 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 25 OTH02-24040 Transmit 1 Line Diagram to SCADA - ECI 1 1 0%12-Mar-21 12-Mar-21 253 Contract.ECI 26 OTH02-24050 Review 30% Electrical Design - AVA 10 10 0%15-Mar-21 26-Mar-21 99 Design.Elect 27 OTH02-24060 Prepare 60% Electrical Design - ECI 30 30 0%29-Mar-21 07-May-21 99 Contract.ECI 28 OTH02-24070 Complete 60% Drafting - AVA 40 40 0%12-Apr-21 07-Jun-21 99 Drafting 29 OTH02-24080 Submit 60% Electrical Design to AVA 2 2 0%08-Jun-21 09-Jun-21 99 Contract.ECI 30 OTH02-24090 Review 60% Electrical Design - AVA 20 20 0%10-Jun-21 08-Jul-21 99 Design.Elect 31 OTH02-24100 Prepare 90% Electrical Design - ECI 40 40 0%09-Jul-21 02-Sep-21 99 Contract.ECI 32 OTH02-24110 Prepare 90% Drafting - AVA 35 35 0%23-Jul-21 10-Sep-21 99 Contract.ECI 33 OTH02-24120 Submit 90% Electrical Design to AVA 2 2 0%13-Sep-21 14-Sep-21 99 Drafting 34 OTH02-24130 Review 90% Electrical Design - AVA 20 20 0%15-Sep-21 12-Oct-21 99 Design.Elect 35 OTH02-24140 Complete Electrical Design - ECI 5 5 0%13-Oct-21 19-Oct-21 99 Contract.ECI 36 OTH02-24150 Complete Electrical Drafting - AVA 5 5 0%20-Oct-21 26-Oct-21 99 Contract.ECI 37 OTH02-24160 Transmit 100% Electricals 3 3 0%27-Oct-21 29-Oct-21 99 Contract.ECI 38 OTH02-24170 Project Execution Plan Approved (PG-2) - Electricl Design Complete 0 0 0%29-Oct-21 99 Contract.ECI 39 Protecon & IntegraProtecon & Integraon Design 156 125 15-Dec-20 A 27-Jul-21 327 40 OTH02-2220 Prepare Protection Design 40 9 78%15-Dec-20 A 11-Feb-21 99 R&P.Chapman, C 41 OTH02-2240 Prepare Integration Design 24 9 72%28-Dec-20 A 11-Feb-21 279 R&P.Chapman, C 42 OTH02-2260 Generate Points List 10 10 0%22-Mar-21 02-Apr-21 253 R&P.Chapman, C 43 OTH02-2270 Points List Complete 0 0 0%02-Apr-21 328 R&P.Chapman, C 44 OTH02-2280 Create Integration Settings 20 20 0%05-Apr-21 30-Apr-21 253 R&P.Chapman, C 45 OTH02-2300 Integration Settings Complete 0 0 0%30-Apr-21 308 R&P.Chapman, C J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Project Execution Plan Approved (PG-2) - Electricl Design Points List Complete Integration Settings Complete Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 2 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 2 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 46 OTH02-2290 Create Relay Settings 40 40 0%03-May-21 28-Jun-21 253 R&P.Chapman, C 47 OTH02-37270 Review Relay (PRC-027)15 15 0%29-Jun-21 20-Jul-21 253 R&P.Chapman, C 48 OTH02-2310 Relay Settings Complete 0 0 0%20-Jul-21 253 R&P.Chapman, C 49 OTH02-2320 Finalize Protection Points List 5 5 0%21-Jul-21 27-Jul-21 253 R&P.Chapman, C 50 OTH02-2330 Protection Settings Delployed 0 0 0%27-Jul-21 327 R&P.Chapman, C 51 SCADA DesignSCADA Design 130 130 15-Mar-21 15-Sep-21 218 52 OTH02-2350 Prepare and Transmit Points List Template to Relay & Protection 5 5 0%15-Mar-21 19-Mar-21 253 SCADA 53 OTH02-2360 Prepare SCADA Design Configuration (see Steps) 45 45 0%05-Apr-21 07-Jun-21 283 SCADA 54 OTH02-2370 Implement DMS Configuration 5 5 0%03-May-21 07-May-21 308 SCADA 55 OTH02-2380 Prepare SCADA Comm Configuration 10 10 0%01-Sep-21 15-Sep-21 218 SCADA 56 Enterprise Technology Enterprise Technology (ET) Design 80 80 10-May-21 31-Aug-21 218 57 OTH02-2390 Prepare ET Design 80 80 0%10-May-21 31-Aug-21 218 ET - DSN 58 Planning & Design CoPlanning & Design Complete 0 0 29-Oct-21 29-Oct-21 186 59 OTH02-2400 Design Complete 0 0 0%29-Oct-21 186 Proj.Lead 60 Procure Staon EquipProcure Staon Equipment 363 332 01-Jan-21 A 29-Dec-21 420 61 OTH02-2410 Procure Major Equipment 363 332 9%01-Jan-21 A 29-Dec-21 420 Supply Chain 62 EXECUTION PHASEEXECUTION PHASE 447 447 22-Feb-21 23-Nov-22 70 63 Support Services DuriSupport Services During Construcon 2 2 24-Jun-21 25-Jun-21 351 64 OTH02-3020 Hold Pre-Construction Meeting 2 2 0%24-Jun-21 25-Jun-21 351 Proj.Lead 65 OutagesOutages 52 52 06-Sep-22 16-Nov-22 70 66 OTH02-3170 Hold Planned Outage - Power for Commissioning 115kV 1 1 0%06-Sep-22 06-Sep-22 65 SysOps.Outage 67 OTH02-3180 Hold Planned Outage/Energization Date 115kV 1 1 0%16-Nov-22 16-Nov-22 70 SysOps.Outage 68 Transmission WorkTransmission Work 406 406 01-Mar-21 04-Oct-22 106 69 OTH02-3190 Perform Transmission Construction - Pre-Checkout Complete 120 120 0%01-Mar-21 17-Aug-21 382 Trans Const 70 OTH02-3195 Complete 115kV Transmission Work - Finalize Integration 10 10 0%21-Sep-22 04-Oct-22 106 Trans Const J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Relay Settings Complete Protection Settings Delployed Design Complete Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 3 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 3 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 71 Grading & Fence ConstGrading & Fence Construcon 65 65 22-Feb-21 21-May-21 199 72 OTH02-3060 Fabricate Steel (Includes Galvanizing)60 60 0%01-Mar-21 21-May-21 199 Mech.UA 73 OTH02-3055 Install Site Fence (Idaho Fence)50 50 0%22-Feb-21 30-Apr-21 211 Contract.ID Fence 74 Structural/Mechanical Structural/Mechanical Work 210 210 30-Nov-21 27-Sep-22 111 75 OTH02-3100 Excavate, form, Rebar and Pour New foundations 50 50 0%30-Nov-21*10-Feb-22 65 Mech.UA 76 OTH02-3110 Install Steel 10 10 0%11-Feb-22 24-Feb-22 102 Mech.UA 77 OTH02-3160 Install Trenwa 30 30 0%11-Feb-22 24-Mar-22 65 Mech.UA 78 OTH02-3165 Complete Final Gravel & Grade 5 5 0%21-Sep-22 27-Sep-22 111 Mech.UA 79 Panel HousePanel House 80 80 05-Apr-21 27-Jul-21 132 80 OTH02-3200 Build Panel House (Contract)80 80 0%05-Apr-21 27-Jul-21 132 Contract 81 Electrical WorkElectrical Work 220 220 01-Nov-21 20-Sep-22 102 82 OTH02-37000 Mobilize Electrical 5 5 0%01-Nov-21 05-Nov-21 95 Contract.Michels 83 OTH02-37010 Site Layout - Marking - Establish Laydown 5 5 0%08-Nov-21 12-Nov-21 95 Contract.Michels 84 OTH02-37020 Below Grade Conduit - Excavate/Place/Backfill 45 45 0%15-Nov-21 20-Jan-22 95 Contract.Michels 85 OTH02-37030 Erect Steel 10 10 0%21-Jan-22 03-Feb-22 95 Contract.Michels 86 OTH02-37040 Install Air Switches 60 60 0%04-Mar-22 26-May-22 102 Contract.Michels 87 OTH02-37050 Install Buss and Jumpers 80 80 0%27-May-22 20-Sep-22 102 Contract.Michels 88 OTH02-37060 Electrical Work Complete 0 0 0%20-Sep-22 102 Contract.Michels 89 OTH02-37070 Install/Set Transformer 5 5 0%15-Mar-22 21-Mar-22 121 Contract.Michels 90 OTH02-37080 Dress Panel House 60 60 0%01-Nov-21 27-Jan-22 150 Contract.Michels 91 OTH02-37090 Dress Transformers 60 60 0%22-Mar-22 14-Jun-22 121 Contract.Michels 92 OTH02-37100 Cable Trench 50 50 0%25-Mar-22 03-Jun-22 65 Contract.Michels 93 OTH02-37110 Above Grade Gounding and Conduits 30 30 0%06-Jun-22 18-Jul-22 65 Contract.Michels J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Electrical Work Com Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 4 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 4 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 94 OTH02-37120 Field Wiring 30 30 0%19-Jul-22 29-Aug-22 65 Contract.Michels 95 OTH02-37130 Complete 72 hours - Soak Transformer 3 3 0%30-Aug-22 01-Sep-22 65 Contract.Michels 96 OTH02-37140 Energize 115kV 1 1 0%02-Sep-22 02-Sep-22 65 Contract.Michels 97 OTH02-37150 Construct Relay Panels 20 20 0%02-Dec-21 30-Dec-21 156 Contract.Michels 98 OTH02-37160 Ground Grid - Excavate/Place/Backfill 25 25 0%10-Dec-21 17-Jan-22 110 Contract.Michels 99 OTH02-37170 Dress Panelhouse & Low Voltage Wiring 60 60 0%03-Jan-22 01-Apr-22 156 Contract.Michels 100 OTH02-37180 Install HVAC at Panelhouse 20 20 0%07-Mar-22 01-Apr-22 196 Contract.Michels 101 OTH02-37190 Install Relay Panels & Wiring 40 40 0%04-Apr-22 27-May-22 156 Contract.Michels 102 OTH02-37200 Rack and Panel Internal Wiring to Term Frame 25 25 0%31-May-22 05-Jul-22 156 Contract.Michels 103 OTH02-37210 Install Breakers 10 10 0%27-May-22 10-Jun-22 142 Contract.Michels 104 OTH02-37220 Install PT/CT - Lineup 10 10 0%13-Jun-22 24-Jun-22 162 Contract.Michels 105 OTH02-37230 Station Service Installation 10 10 0%13-Jun-22 24-Jun-22 142 Contract.Michels 106 OTH02-37240 Install Batteries & Charger 20 20 0%27-Jun-22 25-Jul-22 142 Contract.Michels 107 OTH02-37250 Perimiter Grounding 20 20 0%19-Jul-22 15-Aug-22 127 Contract.Michels 108 Relay Tech WorkRelay Tech Work 317 317 28-Jul-21 08-Nov-22 66 109 OTH02-3070 Prepare Yellow Lines - Unassigned 10 10 0%28-Jul-21 10-Aug-21 318 Relay.UA 110 OTH02-3140 Program Relays - Unassigned 10 10 0%03-Jan-22 14-Jan-22 245 Relay.UA 111 OTH02-3420 Checkout Relay Panels - Unassigned 10 10 0%17-Jan-22 28-Jan-22 245 Relay.UA 112 OTH02-3430 Checkout Relay & SCADA - Unassigned 5 5 0%19-Oct-22 25-Oct-22 66 Relay.UA 113 OTH02-3440 Test Interchange Meter Common Meter (If Necessary) - Unassigned 5 5 0%26-Oct-22 01-Nov-22 66 Relay.UA 114 OTH02-3450 Complete PT/CT Tes ng - Unassigned 5 5 0%02-Nov-22 08-Nov-22 66 Relay.UA 115 ET Field WorkET Field Work 332 332 28-Jun-21 18-Oct-22 65 J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 5 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 5 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 116 OTH02-3300 Review Construction Schedule (CRS) Developed 1 1 0%28-Jun-21 28-Jun-21 351 ET.Field Work 117 OTH02-3340 Substation Panel House construction Complete (Pre-Requisite) 0 0 0%27-Jul-21 331 ET.Field Work 118 OTH02-3350 Site Construction complete 0 0 0%24-Mar-22 180 ET.Field Work 119 OTH02-3360 Substation Power Available at Site (Pre-Requisite) 0 0 0%06-Sep-22 65 ET.Field Work 120 OTH02-3370 Complete ET Fiber Terminations and Certifications 15 15 0%28-Jul-21 17-Aug-21 331 ET.Field Work 121 OTH02-3380 Install and Configure ET Panel House Equipment 15 15 0%07-Sep-22 27-Sep-22 65 ET.Field Work 122 OTH02-3390 Install and Configure Other ET Equipment 15 15 0%28-Sep-22 18-Oct-22 65 ET.Field Work 123 OTH02-3400 ET Network Go-Live 0 0 0%18-Oct-22 65 ET.Field Work 124 Comm Tesng & ComComm Tesng & Commissioning 5 5 09-Nov-22 15-Nov-22 70 125 OTH02-3230 Commission Fiber Comms 5 5 0%09-Nov-22 15-Nov-22 70 Relay 126 OTH02-3240 Complete Comms Commissioning (Ruggedcom Configuration and 5 5 0%09-Nov-22 15-Nov-22 70 Relay 127 OTH02-3250 Comms Path Test 5 5 0%09-Nov-22 15-Nov-22 70 Relay 128 OTH02-3260 Comm Commissioning - Complete & 2 0 0 0%15-Nov-22 70 Relay 129 SCADASCADA 26 26 19-Oct-22 23-Nov-22 70 130 OTH02-3245 Perform SCADA Comm Checkout 5 5 0%19-Oct-22 25-Oct-22 86 SCADA 131 OTH02-3255 Perform DMS Comm Checkout (If Necessary) 5 5 0%19-Oct-22 25-Oct-22 86 SCADA 132 OTH02-3290 Complete SCADA Checkout 5 5 0%17-Nov-22 23-Nov-22 70 SCADA 133 OTH02-3265 Complete DMS Checkout (If Necessary)5 5 0%17-Nov-22 23-Nov-22 70 SCADA 134 Target Energizaon DaTarget Energizaon Date 5 5 17-Nov-22 23-Nov-22 70 135 OTH02-3500 Energize Substation 115kV side 5 5 0%17-Nov-22 23-Nov-22 70 SysOps.Outage 136 OTH02-3510 ‐Target Energization Date Place in Service - Phase 1 0 0 0%23-Nov-22 70 SysOps.Outage 137 OTH02-3600 Release to Operations Approved ("In-Service"/TTP Date) (PG-3) 0 0 0%23-Nov-22 70 Exec Lead 138 CLOSEOUT PHASECLOSEOUT PHASE 56 56 28-Nov-22 16-Feb-23 130 J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 Substation Panel House construction Complete ( Site Construction complete Substation Power Avail ET Network Go-Li Comm Commi Target Energi Release to O Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 6 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 6 of 7 #Acvity ID Acvity Name Orig Dur Rem Dur PCT Complete Start Finish Total Float Responsibility 139 OTH02-4000 Soft Close Project (Begin six month period) 1 1 0%28-Nov-22 28-Nov-22 70 Proj.Lead 140 OTH02-4010 Perform SCADA Demo (see Steps)20 20 0%28-Nov-22 23-Dec-22 165 SCADA 141 OTH02-4040 SCADA Closeout Complete 0 0 0%23-Dec-22 165 SCADA 142 OTH02-4020 Complete Redline Drawings 5 5 0%28-Nov-22 02-Dec-22 126 Relay 143 OTH02-4030 Complete As-Built Drawings 40 40 0%05-Dec-22 01-Feb-23 130 Proj.Lead 144 OTH02-4050 Hold Closout Meeting (Lessons Learned)1 1 0%16-Feb-23 16-Feb-23 130 Proj.Lead J F M A M J Jul A S O N D Jan F M A M J Jul A S O N D J F M Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 Qtr 2 Qtr 3 Qtr 4 Qtr 1 2021 2022 2023 SCADA Cl Project Manager ‐ Crystal Lewis PL-205 - Crystal Lewis (Othello City) TASK filter: PL-205 - Crystal Lewis (Othello City). Actual Work Remaining Work Planned Outage Bar Scheduled Outage Bar Crical Remaining Work Milestone Completed Milestone Crical Milestone Baseline Bar Baseline Milestone SUBSTATION MASTER SCHEDULE POTENTIAL NON PUBLIC TRANSMISSION FUNCTION INFORMATION. DO NOT DISCLOSE TO MARKETING FUNCTION EMPLOYEES OF AVISTA CORPORATION - FERC Standards of Conduct 18 CFR 358 Data Date 31-Jan-21 Print Date 10-Feb-21 Page 7 of 7 MASTER SCHEDULE - Jan 2021 (DD 31-Jan-21) IFG_PR_076 Attachment B Page 7 of 7