HomeMy WebLinkAbout20230525AVU to IFG 73 Attachment B.pdfActivity ID ctivity Name Original Duration Start Finish Resources Westside SubstatWestside Substation Re-Build, Pro ress U date 710 01-Dec-17 A 15-Sep-20 Plannin PhasePlannin Phase 456 01-Dec-17 A 17-Sep-19 Desi nDesin 456 01-Dec-17 A 17-Sep-19 DESIGN-1000 Physical Transmittal Design 125 01-Dec-17 A 30-May-18 A Sara Koeff, Aaron Henson DESIGN-1010 Electrical Transmittal Design 2.2 60 30-May-18 A 22-Aug-18 A Sara Koeff DESIGN-1020 Procure Autotransformer 122 30-May-18 A 19-Nov-18 A Scott Wislon DESIGN-1120 Procure Steel for 230kV 80 30-May-18 A 20-Sep-18 A aron Henson DESIGN-1030 Electrical Transmittal Design 2.7 & 2.11 145 06-Jul-18 A 28-Feb-19 Sara Koeff DESIGN-1040 Communications Design 15 03-Dec-18 21-Dec-18 Communications Project Lead DESIGN-1050 Communications Design (Nine Mile Substation)15 24-Dec-18 15-Jan-19 Communications Project Lead DESIGN-1060 Communications Design (Nine Mile Remote End)15 16-Jan-19 05-Feb-19 Communications Project Lead DESIGN-1070 Communications Design (Northwest Substation)1 06-Feb-19 06-Feb-19 Communications Project Lead DESIGN-1080 Communications Design (Northwest Remote End)1 07-Feb-19 07-Feb-19 Communications Project Lead DESIGN-1090 Electrical Transmittial Design 2.8, 2.9 & 2.12 120 01-Mar-19 19-Aug-19 Sara Koeff DESIGN-1100 Electrical Design (Remote End - Nine Mile)10 20-Aug-19 03-Sep-19 Sara Koeff DESIGN-1110 Electrical Design (Remote End - Northwest)10 04-Sep-19 17-Sep-19 Sara Koeff Execution PhaseExecution Phase 710 24-Apr-18 A 15-Sep-20 Pre-workPre-work 345 24-Apr-18 A 10-Apr-19 OUTAGE - Main OUTAGE - Main 230kV Bus Prefer Se tember 282 28-Jun-18 A 15-Mar-19 PRE-W O-1000 ux Bus 230kV Outage (Removal)1 28-Jun-18 A 28-Jun-18 A System Operations, Sara Koeff PRE-W O-1010 230kV Main Bus Outage (Replace Old Auto 2 DE)5 11-Mar-19*15-Mar-19 System Operations, Sara Koeff Mechanical Pre-Mechanical Pre-work 345 24-Apr-18 A 10-Apr-19 PRE-W M-1130 Fabricate Steel Structures (230kV)30 24-Apr-18 A 05-Jun-18 A Duane Kurtz PRE-W M-1010 Mobilize Mechanical Crew 5 01-Jun-18 A 08-Jun-18 A Duane Kurtz PRE-W M-1020 Excavation, Ftgs & Concrete (115kV)40 11-Jun-18 A 06-Aug-18 A Duane Kurtz PRE-W M-1030 Remove Ftgs & Steel Aux Bus 5 25-Jun-18 A 29-Jun-18 A Duane Kurtz PRE-W M-1050 Install Trenwa (115kV)7 07-Aug-18 A 15-Aug-18 A Duane Kurtz PRE-W M-1060 Excavation, Ftgs & Concrete (Auto 2 Pad)25 31-Aug-18 A 09-Nov-18 A Duane Kurtz PRE-W M-1000 Fabricate Steel Structures (115kV)100 03-Sep-18 A 30-Nov-18 A Duane Kurtz PRE-W M-1040 Install Steel Structures (115kV)5 12-Dec-18 18-Dec-18 Duane Kurtz PRE-W M-1070 Mechanical Work Complete (115kV)0 18-Dec-18 PRE-W M-1160 Excavation, Ftgs & Concrete (Deadend Foundations)10 19-Dec-18 03-Jan-19 PRE-W M-1170 Excavation, Ftgs & Concrete (Remaining 230kV Foundations)20 04-Jan-19 31-Jan-19 PRE-W M-1140 Remove Old Auto 2 Deadend 1 12-Mar-19 12-Mar-19 Duane Kurtz PRE-W M-1150 Erect Auto 2 Coulee Deadend 1 13-Mar-19 13-Mar-19 Duane Kurtz PRE-W M-1080 Remove Old Auto 1 Deadend 4 14-Mar-19 19-Mar-19 Duane Kurtz PRE-W M-1100 Install Steel Structures (230kV)15 20-Mar-19 09-Apr-19 Duane Kurtz PRE-W M-1090 Install Concrete (New Auto 2 Deadend)4 20-Mar-19 25-Mar-19 Duane Kurtz PRE-W M-1110 Install Trenwa (230kV)1 10-Apr-19 10-Apr-19 Duane Kurtz PRE-W M-1120 Mechanical Work Complete (230kV)0 10-Apr-19 Transmission PreTransmission Pre-work 4 11-Mar-19 14-Mar-19 PRE-W T-1010 Remove 230kV Old Auto 2 Conductor 1 11-Mar-19 11-Mar-19 Transmission Construction PRE-W T-1000 Remove 230kV Old Auto 1 Conductor 1 12-Mar-19 12-Mar-19 Transmission Construction PRE-W T-1020 Erect 230kV Old Auto 2 Conductor 1 14-Mar-19 14-Mar-19 Transmission Construction Electrical Pre-workElectrical Pre-work 28 06-Feb-19 15-Mar-19 PRE-W E-1000 Remove Partial Aux Bus 230kV 5 06-Feb-19 12-Feb-19 Justin Louie PRE-W E-1010 Connect to R-385 Air Switch 1 15-Mar-19 15-Mar-19 Justin Louie Build Sunset A-956Build Sunset A-956 83 03-Dec-18 29-Mar-19 OUTAGESOUTAGES 13 20-Feb-19 08-Mar-19 SUN O-1000 115 kV SW Bus Outage 1 20-Feb-19*20-Feb-19 System Operations SUN O-1010 Sunset 115kV Outage 10 25-Feb-19*08-Mar-19 System Operations Mechanical WorkMechanical Work 0 18-Dec-18 18-Dec-18 SUN M-1000 Mechcanical Work Complete (Pre-Outage)0 18-Dec-18 Electrical WorkElectrical Work 27 07-Jan-19 12-Feb-19 SUN E-1000 Install Air Switches A-956 5 07-Jan-19 11-Jan-19 Justin Louie SUN E-1030 Construct Relay Panel A-956 10 10-Jan-19 23-Jan-19 Justin Louie SUN E-1010 Install Breaker A-956 5 14-Jan-19 18-Jan-19 Justin Louie J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 15 17-Sep-19, Planning Phase 17-Sep-19, Design 30-May-18 A, Sara Koeff, Aaron Henson 30-May-18 A 22-Aug-18 A, Sara Koeff 30-May-18 A 19-Nov-18 A, Scott Wislon 30-May-18 A 20-Sep-18 A, Aaron Henson 06-Jul-18 A 28-Feb-19, Sara Koeff 03-Dec-18 21-Dec-18, Communications Project Lead 24-Dec-18 15-Jan-19, Communications Project Lead 16-Jan-19 05-Feb-19, Communications Project Lead 06-Feb-19 06-Feb-19, Communications Project Lead 07-Feb-19 07-Feb-19, Communications Project Lead 01-Mar-19 19-Aug-19, Sara Koeff 20-Aug-19 03-Sep-19, Sara Koeff 04-Sep-19 17-Sep-19, Sara Koeff 15 10-Apr-19, Pre-work 15-Mar-19, OUTAGE - Main 230kV Bus (Prefer September) 28-Jun-18 A 28-Jun-18 A, System Operations, Sara Koeff 11-Mar-19* 15-Mar-19, System Operations, Sara Koeff 10-Apr-19, Mechanical Pre-work 24-Apr-18 A 05-Jun-18 A, Duane Kurtz 01-Jun-18 A 08-Jun-18 A, Duane Kurtz 11-Jun-18 A 06-Aug-18 A, Duane Kurtz 25-Jun-18 A 29-Jun-18 A, Duane Kurtz 07-Aug-18 A 15-Aug-18 A, Duane Kurtz 31-Aug-18 A 09-Nov-18 A, Duane Kurtz 03-Sep-18 A 30-Nov-18 A, Duane Kurtz 12-Dec-18 18-Dec-18, Duane Kurtz Mechanical Work Complete (115kV) 19-Dec-18 03-Jan-19, 04-Jan-19 31-Jan-19, 12-Mar-19 12-Mar-19, Duane Kurtz 13-Mar-19 13-Mar-19, Duane Kurtz 14-Mar-19 19-Mar-19, Duane Kurtz 20-Mar-19 09-Apr-19, Duane Kurtz 20-Mar-19 25-Mar-19, Duane Kurtz 10-Apr-19 10-Apr-19, Duane Kurtz Mechanical Work Complete (230kV) 14-Mar-19, Transmission Pre-work 11-Mar-19 11-Mar-19, Transmission Construction 12-Mar-19 12-Mar-19, Transmission Construction 14-Mar-19 14-Mar-19, Transmission Construction 15-Mar-19, Electrical Pre-work 06-Feb-19 12-Feb-19, Justin Louie 15-Mar-19 15-Mar-19, Justin Louie 29-Mar-19, Build Sunset A-956 08-Mar-19, OUTAGES 20-Feb-19* 20-Feb-19, System Operations 25-Feb-19* 08-Mar-19, System Operations 18-Dec-18, Mechanical Work Mechcanical Work Complete (Pre-Outage) 12-Feb-19, Electrical Work 07-Jan-19 11-Jan-19, Justin Louie 10-Jan-19 23-Jan-19, Justin Louie 14-Jan-19 18-Jan-19, Justin Louie 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 1 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 1 of 7 Activity ID ctivity Name Original Duration Start Finish Resources SUN E-1020 Grounding 5 21-Jan-19 25-Jan-19 Justin Louie SUN E-1040 Field Wiring A-956 10 28-Jan-19 08-Feb-19 Justin Louie SUN E-1050 Gas Breaker A-956 1 11-Feb-19 11-Feb-19 Justin Louie SUN E-1060 Breaker Commissioning Testing A-956 1 12-Feb-19 12-Feb-19 lbert Sisk SUN E-1070 Electrical Work Complete A-956 0 12-Feb-19 Relay Tech WorkRela Tech Work 57 03-Dec-18 21-Feb-19 SUN R-1000 Protection Settings (A-956)5 03-Dec-18 07-Dec-18 Relay & Protection Design SUN R-1020 Points List (A-956)5 10-Dec-18 14-Dec-18 Relay & Protection Design SUN R-1080 SCADA Programming Sunset A-956 45 17-Dec-18 19-Feb-19 SCADA SUN R-1010 Yellow Lining Sunset 5 03-Jan-19 09-Jan-19 Mark Babin SUN R-1030 Program Relays 5 24-Jan-19 30-Jan-19 Mark Babin SUN R-1050 Relay Panel Checkout 5 11-Feb-19 15-Feb-19 Mark Babin SUN R-1040 PT/CT Testing 5 12-Feb-19 18-Feb-19 Mark Babin SUN R-1060 Relay & SCADA Checkout 2 20-Feb-19 21-Feb-19 Mark Babin SUN R-1070 Relay Work Complete 0 21-Feb-19 Transmission WoTransmission Work 28 20-Feb-19 29-Mar-19 SUN T-1010 dd First Span Sunset 115kV 1 20-Feb-19 20-Feb-19 Transmission Construction SUN T-1020 Complete Sunset 115kV Trans 1 25-Feb-19 25-Feb-19 Transmission Construction SUN T-1000 Construct Sunset 115kV Trans - Pre-work 5 25-Mar-19 29-Mar-19 Transmission Construction CommissioningCommissionin 8 25-Feb-19 06-Mar-19 SUN C-1000 PT/CT Testing 5 25-Feb-19 01-Mar-19 Mark Babin SUN C-1010 End to End Testing 3 04-Mar-19 06-Mar-19 Mark Babin SUN C-1020 Commissioning Complete 0 06-Mar-19 CommunicationsCommunications 7 11-Feb-19 19-Feb-19 SUN COM-1000 Fiber Termination Support 1 11-Feb-19 11-Feb-19 Enterprise Technology PMO SUN COM-1010 Ruggedcom Configuration 1 18-Feb-19 18-Feb-19 Enterprise Technology PMO SUN COM-1020 Communications Complete Sunset A-956 1 19-Feb-19 19-Feb-19 Enterprise Technology PMO Build Auto 2, N BBuild Auto 2 N Bus 230kV SE Bus 115kV 286 19-Nov-18 A 07-Jan-20 OUTAGESOUTAGES 60 19-Sep-19 13-Dec-19 uto 2 O-1010 utotransformer 1 Outage R-630 10 19-Sep-19 02-Oct-19 System Operations, Sara Koeff uto 2 O-1050 115kV Bus Outage 2 01-Oct-19 02-Oct-19 System Operations, Sara Koeff uto 2 O-1020 230kV Main Bus Outage (Auto 2 Conductor)2 02-Dec-19 03-Dec-19 System Operations, Sara Koeff uto 2 O-1030 Old Auto 2 Outage 10 02-Dec-19 13-Dec-19 System Operations, Sara Koeff Mechanical WorkMechanical Work 6 13-Mar-19 20-Mar-19 uto 2 M-1000 Remove Ftgs & Steel (Old Sunset, A-410)3 13-Mar-19 15-Mar-19 Duane Kurtz uto 2 M-1010 Install Ftgs & Steel Structures (A-964)3 18-Mar-19 20-Mar-19 Duane Kurtz Electrical WorkElectrical Work 286 19-Nov-18 A 07-Jan-20 uto 2 E-1010 Pre-work for Receive/Comm Auto 2 1 19-Nov-18 A 19-Nov-18 A Justin Louie uto 2 E-1020 Receive Autotransformer 2 (Manufacturer)1 20-Nov-18 A 20-Nov-18 A uto 2 E-1030 Manufacturer Transformer Commissioning/Testing 15 07-Feb-19 27-Feb-19 uto 2 E-1000 Remove OCB A-410 (Old Sunset Line)4 07-Mar-19 12-Mar-19 Justin Louie uto 2 E-1040 Construct Auto 2 5 13-Mar-19 19-Mar-19 Justin Louie uto 2 E-1050 uto 2 Station Service 10 20-Mar-19 02-Apr-19 Justin Louie uto 2 E-1060 Grounding Auto 2 1 03-Apr-19 03-Apr-19 Justin Louie uto 2 E-1070 Field Wiring Auto 2 including Serveron 10 04-Apr-19 17-Apr-19 Justin Louie uto 2 E-1080 Serveron Commissioning 2 18-Apr-19 19-Apr-19 lbert Sisk uto 2 E-1090 Electrical Work Complete (Auto 2)0 19-Apr-19 uto 2 E-1100 Construct 115kV Southeast Bus 15 22-Apr-19 10-May-19 Justin Louie uto 2 E-1140 Construct Relay Panel N Bus 10 26-Apr-19 09-May-19 Justin Louie uto 2 E-1150 Construct Relay Panels Auto 2 20 10-May-19 07-Jun-19 Justin Louie uto 2 E-1110 Install 115kV Air Switches 10 13-May-19 24-May-19 Justin Louie uto 2 E-1120 Install 115kV Breakers (A-962 & A-964)10 28-May-19 10-Jun-19 Justin Louie uto 2 E-1160 Construct Realy Panel SE Bus 10 10-Jun-19 21-Jun-19 Justin Louie uto 2 E-1130 Grounding 115kV Side 10 11-Jun-19 24-Jun-19 Justin Louie uto 2 E-1200 Control Enclosure Wiring 10 24-Jun-19 08-Jul-19 Justin Louie uto 2 E-1170 Field Wiring (115kV Equipment)20 25-Jun-19 23-Jul-19 Justin Louie uto 2 E-1180 Gas Breakers A-962 and A-964 2 24-Jul-19 25-Jul-19 Justin Louie uto 2 E-1190 Breaker Commissioning Testing A-962 & A-964 2 26-Jul-19 29-Jul-19 lbert Sisk J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 21-Jan-19 25-Jan-19, Justin Louie 28-Jan-19 08-Feb-19, Justin Louie 11-Feb-19 11-Feb-19, Justin Louie 12-Feb-19 12-Feb-19, Albert Sisk Electrical Work Complete A-956 21-Feb-19, Relay Tech Work 03-Dec-18 07-Dec-18, Relay & Protection Design 10-Dec-18 14-Dec-18, Relay & Protection Design 17-Dec-18 19-Feb-19, SCADA 03-Jan-19 09-Jan-19, Mark Babin 24-Jan-19 30-Jan-19, Mark Babin 11-Feb-19 15-Feb-19, Mark Babin 12-Feb-19 18-Feb-19, Mark Babin 20-Feb-19 21-Feb-19, Mark Babin Relay Work Complete 29-Mar-19, Transmission Work 20-Feb-19 20-Feb-19, Transmission Construction 25-Feb-19 25-Feb-19, Transmission Construction 25-Mar-19 29-Mar-19, Transmission Construction 06-Mar-19, Commissioning 25-Feb-19 01-Mar-19, Mark Babin 04-Mar-19 06-Mar-19, Mark Babin Commissioning Complete 19-Feb-19, Communications 11-Feb-19 11-Feb-19, Enterprise Technology PMO 18-Feb-19 18-Feb-19, Enterprise Technology PMO 19-Feb-19 19-Feb-19, Enterprise Technology PMO 07-Jan-20, Build Auto 2, N Bus 230k 13-Dec-19, OUTAGES 19-Sep-19 02-Oct-19, System Operations, Sara Koeff 01-Oct-19 02-Oct-19, System Operations, Sara Koeff 02-Dec-19 03-Dec-19, System Operations, Sara Ko 02-Dec-19 13-Dec-19, System Operations, Sara K 20-Mar-19, Mechanical Work 13-Mar-19 15-Mar-19, Duane Kurtz 18-Mar-19 20-Mar-19, Duane Kurtz 07-Jan-20, Electrical Work 19-Nov-18 A 19-Nov-18 A, Justin Louie 20-Nov-18 A 20-Nov-18 A, 07-Feb-19 27-Feb-19, 07-Mar-19 12-Mar-19, Justin Louie 13-Mar-19 19-Mar-19, Justin Louie 20-Mar-19 02-Apr-19, Justin Louie 03-Apr-19 03-Apr-19, Justin Louie 04-Apr-19 17-Apr-19, Justin Louie 18-Apr-19 19-Apr-19, Albert Sisk Electrical Work Complete (Auto 2) 22-Apr-19 10-May-19, Justin Louie 26-Apr-19 09-May-19, Justin Louie 10-May-19 07-Jun-19, Justin Louie 13-May-19 24-May-19, Justin Louie 28-May-19 10-Jun-19, Justin Louie 10-Jun-19 21-Jun-19, Justin Louie 11-Jun-19 24-Jun-19, Justin Louie 24-Jun-19 08-Jul-19, Justin Louie 25-Jun-19 23-Jul-19, Justin Louie 24-Jul-19 25-Jul-19, Justin Louie 26-Jul-19 29-Jul-19, Albert Sisk 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 2 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 2 of 7 Activity ID ctivity Name Original Duration Start Finish Resources uto 2 E-1210 Electrical Work Complete (115kV)1 30-Jul-19 30-Jul-19 uto 2 E-1260 Build 230kV N Bus 15 31-Jul-19 20-Aug-19 Justin Louie uto 2 E-1220 Install 230kV Air Switch (R-630 & R-638)10 21-Aug-19 04-Sep-19 Justin Louie uto 2 E-1230 Install Breaker R-630 & R-638 10 05-Sep-19 18-Sep-19 Justin Louie uto 2 E-1240 Grounding 230kV Side 10 19-Sep-19 02-Oct-19 Justin Louie uto 2 E-1250 Field Wiring 230kV Equipment 20 03-Oct-19 30-Oct-19 Justin Louie uto 2 E-1370 uto 2 Final Connections (115kV Side)2 04-Oct-19 07-Oct-19 Justin Louie uto 2 E-1270 Gas Breaker R-630 2 31-Oct-19 01-Nov-19 Justin Louie uto 2 E-1280 Breaker Commissioning Testing R-630 & R-638 2 04-Nov-19 05-Nov-19 lbert Sisk uto 2 E-1340 Electrical Work Complete (230kV)0 05-Nov-19 uto 2 E-1360 uto 2 Final Connections (230kV Side)2 05-Dec-19 06-Dec-19 Justin Louie uto 2 E-1380 Remove Old Auto 2 Transformer (Phase 3?)15 16-Dec-19 07-Jan-20 Justin Louie Relay Tech WorkRela Tech Work 186 01-Mar-19 20-Nov-19 uto 2 R-1010 Protection Settings (Auto 2, 230kV N Bus, 115kV SE Bus)20 01-Mar-19 28-Mar-19 Relay & Protection Design uto 2 R-1000 Yellow Lining Auto 2, N Bus 230kV, SE Bus 115kV 20 29-Mar-19 25-Apr-19 Mark Babin uto 2 R-1020 Points List (Auto 2, 230kV N Bus, 115kV SE Bus)20 29-Mar-19 25-Apr-19 Relay & Protection Design Design-133 SCADA Programming Auto 2, N Bus 230kV, SE Bus 115kV 45 26-Apr-19 28-Jun-19 SCADA uto 2 R-1030 Program Relays 230kV N Bus 10 10-May-19 23-May-19 Mark Babin uto 2 R-1060 Program Relays Auto 2 5 10-Jun-19 14-Jun-19 Mark Babin uto 2 R-1040 Program Relays SE Bus 5 24-Jun-19 28-Jun-19 Mark Babin uto 2 R-1050 PT/CT Testing SE Bus 5 26-Jul-19 01-Aug-19 Mark Babin uto 2 R-1070 Relay Panel Checkout SE Bus 10 02-Aug-19 15-Aug-19 Mark Babin uto 2 R-1120 PT/CT Testing 230kV N Bus 10 21-Aug-19 04-Sep-19 Mark Babin uto 2 R-1130 Relay Panel Checkout 230kV N Bus 10 05-Sep-19 18-Sep-19 Mark Babin uto 2 R-1140 Relay Work Complete 230kV N Bus 0 18-Sep-19 uto 2 R-1190 Relay & SCADA Checkout N Bus, SE Bus, Auto 2 15 31-Oct-19 20-Nov-19 Mark Babin uto 2 R-1150 Relay & SCADA Checkout R-630 5 31-Oct-19 06-Nov-19 Mark Babin uto 2 R-1160 PT/CT Testing Auto 2 5 04-Nov-19 08-Nov-19 Mark Babin uto 2 R-1170 Relay Panel Checkout Auto 2 5 11-Nov-19 15-Nov-19 Mark Babin uto 2 R-1180 Relay Work Complete Auto 2 & SE Bus 0 15-Nov-19 Transmission WoTransmission Work 168 10-Apr-19 06-Dec-19 uto 2 T-1020 dd First Span to Bell 230kV 5 10-Apr-19 16-Apr-19 Transmission Construction uto 2 T-1040 Erect 115kV Side Auto 2 Conductor 1 03-Oct-19 03-Oct-19 Transmission Construction uto 2 T-1030 Remove 115 kV Old Auto 1 Conductor 1 04-Oct-19 04-Oct-19 Transmission Construction uto 2 T-1010 Erect 230kV Side Auto 2 Conductor 1 04-Dec-19 04-Dec-19 Transmission Construction uto 2 T-1000 Remove 230kV Old Auto 2 Conductor 1 05-Dec-19 05-Dec-19 Transmission Construction uto 2 T-1050 dd First Span to Coulee 230kV 1 06-Dec-19 06-Dec-19 Transmission Construction CommissioningCommissionin 60 19-Sep-19 13-Dec-19 uto 2 C-1020 PT/CT Testing 230kV N Bus 5 19-Sep-19 25-Sep-19 Mark Babin uto 2 C-1000 PT/CT Testing R-630 5 19-Sep-19 25-Sep-19 Mark Babin uto 2 C-1040 End to End Testing R-630 5 26-Sep-19 02-Oct-19 Mark Babin uto 2 C-1030 PT/CT Testing SE Bus 5 01-Oct-19 07-Oct-19 Mark Babin uto 2 C-1060 Commissioning Complete R-630 0 02-Oct-19 uto 2 C-1010 PT/CT Testing Auto 2 5 02-Dec-19 06-Dec-19 Mark Babin uto 2 C-1050 End to End Testing Auto 2 5 09-Dec-19 13-Dec-19 Mark Babin uto 2 C-1070 Commissioning Complete Auto 2, N Bus, SE Bus 0 13-Dec-19 CommunicationsCommunications 20 31-Oct-19 29-Nov-19 uto 2 COM-1000 Fiber Termination Support 20 31-Oct-19 29-Nov-19 Enterprise Technology PMO uto 2 COM-1010 Ruggedcom Configuration 1 18-Nov-19 18-Nov-19 Enterprise Technology PMO uto 2 COM-1020 Communications Work Complete Auto 2, 230kV, 115kV 1 29-Nov-19 29-Nov-19 Enterprise Technology PMO Build Nine Mile A-Build Nine Mile A-968 308 18-Dec-18 05-Mar-20 OUTAGESOUTAGES 30 24-Jan-20 05-Mar-20 NMS O-1000 Nine Mile 115kV Outage 30 24-Jan-20 05-Mar-20 System Operations NMS O-1010 115kV Southeast Bus Outage 1 24-Feb-20 24-Feb-20 System Operations Mechanical WorkMechanical Work 289 18-Dec-18 07-Feb-20 NMS M-1000 Mechanical Pre-work Complete A-968 0 18-Dec-18 NMS M-1010 Remove Ftgs & Steel (A-411 & A-413)5 27-Jan-20 31-Jan-20 Duane Kurtz NMS M-1020 Install Ftgs & Steel Structures (A-968 & A-970)5 03-Feb-20 07-Feb-20 Duane Kurtz J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 30-Jul-19 30-Jul-19, 31-Jul-19 20-Aug-19, Justin Louie 21-Aug-19 04-Sep-19, Justin Louie 05-Sep-19 18-Sep-19, Justin Louie 19-Sep-19 02-Oct-19, Justin Louie 03-Oct-19 30-Oct-19, Justin Louie 04-Oct-19 07-Oct-19, Justin Louie 31-Oct-19 01-Nov-19, Justin Louie 04-Nov-19 05-Nov-19, Albert Sisk Electrical Work Complete (230kV) 05-Dec-19 06-Dec-19, Justin Louie 16-Dec-19 07-Jan-20, Justin Louie 20-Nov-19, Relay Tech Work 01-Mar-19 28-Mar-19, Relay & Protection Design 29-Mar-19 25-Apr-19, Mark Babin 29-Mar-19 25-Apr-19, Relay & Protection Design 26-Apr-19 28-Jun-19, SCADA 10-May-19 23-May-19, Mark Babin 10-Jun-19 14-Jun-19, Mark Babin 24-Jun-19 28-Jun-19, Mark Babin 26-Jul-19 01-Aug-19, Mark Babin 02-Aug-19 15-Aug-19, Mark Babin 21-Aug-19 04-Sep-19, Mark Babin 05-Sep-19 18-Sep-19, Mark Babin Relay Work Complete 230kV N Bus 31-Oct-19 20-Nov-19, Mark Babin 31-Oct-19 06-Nov-19, Mark Babin 04-Nov-19 08-Nov-19, Mark Babin 11-Nov-19 15-Nov-19, Mark Babin Relay Work Complete Auto 2 & SE Bus 06-Dec-19, Transmission Work 10-Apr-19 16-Apr-19, Transmission Construction 03-Oct-19 03-Oct-19, Transmission Construction 04-Oct-19 04-Oct-19, Transmission Construction 04-Dec-19 04-Dec-19, Transmission Construction 05-Dec-19 05-Dec-19, Transmission Construction 06-Dec-19 06-Dec-19, Transmission Construction 13-Dec-19, Commissioning 19-Sep-19 25-Sep-19, Mark Babin 19-Sep-19 25-Sep-19, Mark Babin 26-Sep-19 02-Oct-19, Mark Babin 01-Oct-19 07-Oct-19, Mark Babin Commissioning Complete R-630 02-Dec-19 06-Dec-19, Mark Babin 09-Dec-19 13-Dec-19, Mark Babin Commissioning Complete Auto 2, N Bu 29-Nov-19, Communications 31-Oct-19 29-Nov-19, Enterprise Technology PMO 18-Nov-19 18-Nov-19, Enterprise Technology PMO 29-Nov-19 29-Nov-19, Enterprise Technology PMO 05-Mar-20, Build Nine Mile 05-Mar-20, OUTAGES 24-Jan-20 05-Mar-20, System Operatio 24-Feb-20 24-Feb-20, System Operation 07-Feb-20, Mechanical Work Mechanical Pre-work Complete A-968 27-Jan-20 31-Jan-20, Duane Kurtz 03-Feb-20 07-Feb-20, Duane Kurtz 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 3 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 3 of 7 Activity ID ctivity Name Original Duration Start Finish Resources Electrical WorkElectrical Work 104 25-Sep-19 21-Feb-20 NMS E-1000 Construct Relay Panel A-968 10 25-Sep-19 08-Oct-19 Justin Louie NMS E-1010 Install Air Switch A-968 5 16-Dec-19 20-Dec-19 Justin Louie NMS E-1020 Install Breaker A-968 5 23-Dec-19 30-Dec-19 Justin Louie NMS E-1030 Grounding 5 31-Dec-19 07-Jan-20 Justin Louie NMS E-1040 Field Wiring A-986 10 08-Jan-20 21-Jan-20 Justin Louie NMS E-1050 Gas Breaker A-968 1 22-Jan-20 22-Jan-20 Justin Louie NMS E-1060 Breaker Commissioning Testing A-968 1 23-Jan-20 23-Jan-20 lbert Sisk NMS E-1070 Electrical Work Complete A-968 0 23-Jan-20 NMS E-1080 Remove A4-11 (Old Auto 1)4 24-Jan-20 29-Jan-20 Justin Louie NMS E-1090 Remove A-413 (Old Nine Mile)4 30-Jan-20 04-Feb-20 Justin Louie NMS E-1100 Install Air Switches (A-1069 & Bus)10 10-Feb-20 21-Feb-20 Justin Louie Relay Tech WorkRela Tech Work 112 20-Aug-19 29-Jan-20 NMS R-1000 Protection Settings (Nine Mile A-968)5 20-Aug-19 26-Aug-19 Relay & Protection Design NMS R-1010 Points List (Nine Mile A-968)5 27-Aug-19 03-Sep-19 Relay & Protection Design NMS R-1020 SCADA Programming Nine Mile A-968 45 04-Sep-19 05-Nov-19 SCADA NMS R-1030 Program Relays 5 09-Oct-19 15-Oct-19 Mark Babin NMS R-1040 Relay Panel Checkout 5 16-Oct-19 22-Oct-19 Mark Babin NMS R-1050 Relay & SCADA Checkout 2 22-Jan-20 23-Jan-20 Mark Babin NMS R-1060 PT/CT Testing 5 23-Jan-20 29-Jan-20 Mark Babin NMS R-1070 Relay Work Complete 0 29-Jan-20 Transmission WoTransmission Work 22 24-Jan-20 24-Feb-20 NMS T-1000 Remove Nine Mile Conductor 1 24-Jan-20 24-Jan-20 Transmission Construction NMS T-1010 Construct Nine Mile 115kV Trans 5 10-Feb-20 14-Feb-20 Transmission Construction NMS T-1020 Northwest Span to Deadend 1 24-Feb-20 24-Feb-20 Transmission Construction NMS T-1030 Nine Mile Span to Deadend 1 24-Feb-20 24-Feb-20 Transmission Construction CommissioningCommissionin 25 24-Jan-20 27-Feb-20 NMS C-1000 PT/CT Testing 5 24-Jan-20 30-Jan-20 Mark Babin NMS C-1010 End to End Testing 3 25-Feb-20 27-Feb-20 Mark Babin NMS C-1020 Commissioning Complete 0 27-Feb-20 Remote End WorkRemote End Work 131 20-Aug-19 25-Feb-20 Electrical WorkElectrical Work 1 04-Sep-19 04-Sep-19 NMS REW-1020 Electrical Work at Remote End Nine Mile A-968 1 04-Sep-19 04-Sep-19 Electric Shop Relay Tech WorkRelay Tech Work 131 20-Aug-19 25-Feb-20 NMS REW-1000 Protection Settings for Remote End Nine Mile A-968 1 20-Aug-19 20-Aug-19 Relay & Protection Design NMS REW-1010 Points List for Remote End Nine Mile A-968 1 21-Aug-19 21-Aug-19 Relay & Protection Design NMS REW-1030 SCADA Programming for Remote End Nine Mile A-968 1 22-Aug-19 22-Aug-19 SCADA NMS REW-1050 Relay Tech Work at Remote End Nine Mile A-968 (Inc SCAD 1 25-Feb-20 25-Feb-20 Mark Babin Communications Communications Work 1 23-Jan-20 23-Jan-20 NMS REW-1040 Communications Work at Remote End Nine Mile A-968 1 23-Jan-20 23-Jan-20 Enterprise Technology PMO CommunicationsCommunications 63 23-Oct-19 23-Jan-20 NMS COM-1000 Ruggedcom Configuration 1 23-Oct-19 23-Oct-19 Enterprise Technology PMO NMS COM-1020 Comm Equipment Installation 1 22-Jan-20 22-Jan-20 Enterprise Technology PMO NMS COM-1010 Fiber Termination Support 1 22-Jan-20 22-Jan-20 Enterprise Technology PMO NMS COM-1030 Comms Path Test 1 23-Jan-20 23-Jan-20 Enterprise Technology PMO NMS COM-1040 Communications Work Complete Nine Mile A-968 0 23-Jan-20 Build Bell R-636Build Bell R-636 276 10-Apr-19 11-May-20 OUTAGEOUTAGE 10 13-Apr-20 24-Apr-20 BEL O-1000 Bell R-636 Outage 10 13-Apr-20 24-Apr-20 System Operations Mechanical WorkMechanical Work 0 10-Apr-19 10-Apr-19 BEL M-1000 Mechanical Work Complete (R-636)0 10-Apr-19 Electrical WorkElectrical Work 135 25-Sep-19 06-Apr-20 BEL E-1000 Construct Relay Panel R-636 10 25-Sep-19 08-Oct-19 Justin Louie BEL E-1010 Install Air Switch R-636 5 28-Feb-20 05-Mar-20 Justin Louie BEL E-1020 Install Breaker R-636 5 06-Mar-20 12-Mar-20 Justin Louie BEL E-1030 Grounding 5 13-Mar-20 19-Mar-20 Justin Louie BEL E-1040 Field Wiring R-636 10 20-Mar-20 02-Apr-20 Justin Louie BEL E-1050 Gas Breaker R-636 1 03-Apr-20 03-Apr-20 Justin Louie J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 21-Feb-20, Electrical Work 25-Sep-19 08-Oct-19, Justin Louie 16-Dec-19 20-Dec-19, Justin Louie 23-Dec-19 30-Dec-19, Justin Louie 31-Dec-19 07-Jan-20, Justin Louie 08-Jan-20 21-Jan-20, Justin Louie 22-Jan-20 22-Jan-20, Justin Louie 23-Jan-20 23-Jan-20, Albert Sisk Electrical Work Complete A-968 24-Jan-20 29-Jan-20, Justin Louie 30-Jan-20 04-Feb-20, Justin Louie 10-Feb-20 21-Feb-20, Justin Louie 29-Jan-20, Relay Tech Work 20-Aug-19 26-Aug-19, Relay & Protection Design 27-Aug-19 03-Sep-19, Relay & Protection Design 04-Sep-19 05-Nov-19, SCADA 09-Oct-19 15-Oct-19, Mark Babin 16-Oct-19 22-Oct-19, Mark Babin 22-Jan-20 23-Jan-20, Mark Babin 23-Jan-20 29-Jan-20, Mark Babin Relay Work Complete 24-Feb-20, Transmission Wor 24-Jan-20 24-Jan-20, Transmission Construc 10-Feb-20 14-Feb-20, Transmission Const 24-Feb-20 24-Feb-20, Transmission Con 24-Feb-20 24-Feb-20, Transmission Con 27-Feb-20, Commissioning 24-Jan-20 30-Jan-20, Mark Babin 25-Feb-20 27-Feb-20, Mark Babin Commissioning Complete 25-Feb-20, Remote End Wor 04-Sep-19, Electrical Work 04-Sep-19 04-Sep-19, Electric Shop 25-Feb-20, Relay Tech Work 20-Aug-19 20-Aug-19, Relay & Protection Design 21-Aug-19 21-Aug-19, Relay & Protection Design 22-Aug-19 22-Aug-19, SCADA 25-Feb-20 25-Feb-20, Mark Babin 23-Jan-20, Communications Work 23-Jan-20 23-Jan-20, Enterprise Technology 23-Jan-20, Communications 23-Oct-19 23-Oct-19, Enterprise Technology PMO 22-Jan-20 22-Jan-20, Enterprise Technology 22-Jan-20 22-Jan-20, Enterprise Technology 23-Jan-20 23-Jan-20, Enterprise Technology Communications Work Complete 11-May-20, Build B 24-Apr-20, OUTAGE 13-Apr-20 24-Apr-20, System O 10-Apr-19, Mechanical Work Mechanical Work Complete (R-636) 06-Apr-20, Electrical W 25-Sep-19 08-Oct-19, Justin Louie 28-Feb-20 05-Mar-20, Justin Louie 06-Mar-20 12-Mar-20, Justin Louie 13-Mar-20 19-Mar-20, Justin Louie 20-Mar-20 02-Apr-20, Justin Louie 03-Apr-20 03-Apr-20, Justin Louie 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 4 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 4 of 7 Activity ID ctivity Name Original Duration Start Finish Resources BEL E-1060 Breaker Commissioning Testing R-636 1 06-Apr-20 06-Apr-20 lbert Sisk BEL E-1070 Electrical Work Complete R-636 0 06-Apr-20 Relay Tech WorkRela Tech Work 164 20-Aug-19 10-Apr-20 BEL R-1000 Protection Settings (Bell R-636)5 20-Aug-19 26-Aug-19 Relay & Protection Design BEL R-1010 Yellow Lining Bell, Coulee, NW, Nine Mile 20 27-Aug-19 24-Sep-19 Mark Babin BEL R-1020 Points List (Bell R-636)5 27-Aug-19 03-Sep-19 Relay & Protection Design BEL R-1025 SCADA Programming Bell R-636 (Inc AGC Modeling)45 04-Sep-19 05-Nov-19 SCADA BEL R-1040 Program Relays 5 09-Oct-19 15-Oct-19 Mark Babin BEL R-1050 Relay Panel Checkout 5 16-Oct-19 22-Oct-19 Mark Babin BEL R-1060 Relay & SCADA Checkout 2 03-Apr-20 06-Apr-20 Mark Babin BEL R-1070 PT/CT Testing 5 06-Apr-20 10-Apr-20 Mark Babin BEL R-1080 Bell Interchange Meter Common Meter Testing (Coordinate 1 08-Apr-20 08-Apr-20 Mark Babin BEL R-1090 Relay Work Complete 0 10-Apr-20 Transmission WoTransmission Work 252 17-Apr-19 13-Apr-20 BEL T-1000 Prep Bell 230kV Line 5 17-Apr-19 23-Apr-19 Transmission Construction BEL T-1010 Complete Bell R-636 Trans 1 13-Apr-20 13-Apr-20 Transmission Construction CommissioningCommissionin 11 27-Apr-20 11-May-20 BEL C-1000 PT/CT Testing 5 27-Apr-20 01-May-20 Mark Babin BEL C-1010 End to End Testing 5 04-May-20 08-May-20 Mark Babin BEL C-1020 Bell Interchange Meter Commissioning 1 11-May-20 11-May-20 Mark Babin BEL C-1030 Commissioning Complete 0 11-May-20 Remote End WorkRemote End Work 180 20-Aug-19 04-May-20 Relay Tech WorkRelay Tech Work 180 20-Aug-19 04-May-20 BEL REW-1000 Protection Settings for Remote End Bell R-636 (Coordinate 1 20-Aug-19 20-Aug-19 Relay & Protection Design BEL REW-1020 Relay Tech Work at Remote End Bell R-636 (Coordinate w B 1 04-May-20 04-May-20 Mark Babin Communications Communications Work 1 06-Apr-20 06-Apr-20 BEL REW-1010 Communications Work at Remote End Bell R-636 (Coordinat 1 06-Apr-20 06-Apr-20 Enterprise Technology PMO CommunicationsCommunications 116 23-Oct-19 07-Apr-20 BEL COM-1000 Ruggedcom Configuration 1 23-Oct-19 23-Oct-19 Enterprise Technology PMO BEL COM-1020 Comm Equipment Installation 1 03-Apr-20 03-Apr-20 Enterprise Technology PMO BEL COM-1010 Fiber Termination Support 1 03-Apr-20 03-Apr-20 Enterprise Technology PMO BEL COM-1030 Comms Path Test (Coordinate w BPA)1 06-Apr-20 06-Apr-20 Enterprise Technology PMO BEL COM-1040 Communications Work Complete Bell R-636 1 07-Apr-20 07-Apr-20 Enterprise Technology PMO Build Coulee R-634Build Coulee R-634 235 20-Aug-19 22-Jul-20 OUTAGEOUTAGE 10 25-Jun-20 09-Jul-20 COU O-1000 Coulee R-634 Outage 10 25-Jun-20 09-Jul-20 System Operations Mechanical WorkMechanical Work 15 20-Dec-19 13-Jan-20 uto 2 M-1020 Remove Ftgs & Steel (R-385, Old Auto 2)5 20-Dec-19 27-Dec-19 Duane Kurtz uto 2 M-1040 Install Conc & Steel (Coulee, R-634)10 30-Dec-19 13-Jan-20 Duane Kurtz COU M-1000 Mechcanical Work Complete (Coulee, R-634)0 13-Jan-20 Electrical WorkElectrical Work 187 25-Sep-19 18-Jun-20 COU E-1000 Construct Relay Panel R-634 10 25-Sep-19 08-Oct-19 Justin Louie COU E-1080 Remove R-385 (Old Auto 2)4 16-Dec-19 19-Dec-19 Justin Louie COU E-1010 Install Air Switch R-634 5 12-May-20 18-May-20 Justin Louie COU E-1020 Install Breaker R-634 5 19-May-20 26-May-20 Justin Louie COU E-1030 Grounding 5 27-May-20 02-Jun-20 Justin Louie COU E-1040 Field Wiring R-634 10 03-Jun-20 16-Jun-20 Justin Louie COU E-1050 Gas Breaker R-634 1 17-Jun-20 17-Jun-20 Justin Louie COU E-1060 Breaker Commissioning Testing R-634 1 18-Jun-20 18-Jun-20 lbert Sisk COU E-1070 Electrical Work Complete R-634 0 18-Jun-20 Relay Tech WorkRela Tech Work 216 20-Aug-19 24-Jun-20 COU R-1000 Protection Settings (Coulee R-634)5 20-Aug-19 26-Aug-19 Relay & Protection Design COU R-1010 Points List (Coulee R-634)5 27-Aug-19 03-Sep-19 Relay & Protection Design COU R-1020 SCADA Programming Coulee R-634 (Inc AGC Modeling)45 04-Sep-19 05-Nov-19 SCADA COU R-1030 Program Relays 5 09-Oct-19 15-Oct-19 Mark Babin COU R-1040 Relay Panel Checkout 5 16-Oct-19 22-Oct-19 Mark Babin COU R-1050 Relay & SCADA Checkout 2 17-Jun-20 18-Jun-20 Mark Babin COU R-1060 PT/CT Testing 5 18-Jun-20 24-Jun-20 Mark Babin J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 06-Apr-20 06-Apr-20, Albert Sisk Electrical Work Complet 10-Apr-20, Relay Tech 20-Aug-19 26-Aug-19, Relay & Protection Design 27-Aug-19 24-Sep-19, Mark Babin 27-Aug-19 03-Sep-19, Relay & Protection Design 04-Sep-19 05-Nov-19, SCADA 09-Oct-19 15-Oct-19, Mark Babin 16-Oct-19 22-Oct-19, Mark Babin 03-Apr-20 06-Apr-20, Mark Babin 06-Apr-20 10-Apr-20, Mark Babin 08-Apr-20 08-Apr-20, Mark Babin Relay Work Complete 13-Apr-20, Transmissio 17-Apr-19 23-Apr-19, Transmission Construction 13-Apr-20 13-Apr-20, Transmissio 11-May-20, Commi 27-Apr-20 01-May-20, Mark Ba 04-May-20 08-May-20, Mark B 11-May-20 11-May-20, Mark B Commissioning Co 04-May-20, Remote 04-May-20, Relay Te 20-Aug-19 20-Aug-19, Relay & Protection Design 04-May-20 04-May-20, Mark Ba 06-Apr-20, Communicati 06-Apr-20 06-Apr-20, Enterprise Te 07-Apr-20, Communicati 23-Oct-19 23-Oct-19, Enterprise Technology PMO 03-Apr-20 03-Apr-20, Enterprise Te 03-Apr-20 03-Apr-20, Enterprise Te 06-Apr-20 06-Apr-20, Enterprise Te 07-Apr-20 07-Apr-20, Enterprise Te 22-Jul-20, 09-Jul-20, 25-Jun-20 09-Jul-20, 13-Jan-20, Mechanical Work 20-Dec-19 27-Dec-19, Duane Kurtz 30-Dec-19 13-Jan-20, Duane Kurtz Mechcanical Work Complete (Coule 18-Jun-20, Ele 25-Sep-19 08-Oct-19, Justin Louie 16-Dec-19 19-Dec-19, Justin Louie 12-May-20 18-May-20, Justin 19-May-20 26-May-20, Justin 27-May-20 02-Jun-20, Justi 03-Jun-20 16-Jun-20, Jus 17-Jun-20 17-Jun-20, Jus 18-Jun-20 18-Jun-20, Alb Electrical Wor 24-Jun-20, R 20-Aug-19 26-Aug-19, Relay & Protection Design 27-Aug-19 03-Sep-19, Relay & Protection Design 04-Sep-19 05-Nov-19, SCADA 09-Oct-19 15-Oct-19, Mark Babin 16-Oct-19 22-Oct-19, Mark Babin 17-Jun-20 18-Jun-20, Ma 18-Jun-20 24-Jun-20, M 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 5 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 5 of 7 Activity ID ctivity Name Original Duration Start Finish Resources COU R-1070 Coulee Interchange Meter Common Meter Testing (Coordinat 1 19-Jun-20 19-Jun-20 Mark Babin COU R-1080 Relay Work Complete 0 24-Jun-20 Transmission WoTransmission Work 141 09-Dec-19 25-Jun-20 COU T-1000 Prep Coulee 230kV Line 5 09-Dec-19 13-Dec-19 Transmission Construction COU T-1010 Complete Coulee R-634 Trans 1 25-Jun-20 25-Jun-20 Transmission Construction CommissioningCommissionin 9 10-Jul-20 22-Jul-20 COU C-1000 PT/CT Testing 5 10-Jul-20 16-Jul-20 Mark Babin COU C-1010 End to End Testing 3 17-Jul-20 21-Jul-20 Mark Babin COU C-1020 Coulee Interchange Meter Commissioning 1 22-Jul-20 22-Jul-20 Mark Babin COU C-1030 Commissioning Complete 0 22-Jul-20 Remote End WorkRemote End Work 227 27-Aug-19 17-Jul-20 Relay Tech WorkRelay Tech Work 227 27-Aug-19 17-Jul-20 COU REW-1000 Protection Settings for Remote End Coulee R-634 (Coordina 1 27-Aug-19 27-Aug-19 Relay & Protection Design COU REW-1020 Relay Tech Work at Remote End Coulee R-634 (Coordinate 1 17-Jul-20 17-Jul-20 Mark Babin Communications Communications Work 1 19-Jun-20 19-Jun-20 COU REW-1010 Communications Work Complete at Remote End Coulee R-6 1 19-Jun-20 19-Jun-20 Enterprise Technology PMO CommunicationsCommunications 167 23-Oct-19 18-Jun-20 COU COM-1000 Ruggedcom Configuration 1 23-Oct-19 23-Oct-19 Enterprise Technology PMO COU COM-1020 Comms Equipment Installation 1 17-Jun-20 17-Jun-20 Enterprise Technology PMO COU COM-1010 Fiber Termination Support 1 17-Jun-20 17-Jun-20 Enterprise Technology PMO COU COM-1030 Comms Path Test (Coordinate w BPA)1 18-Jun-20 18-Jun-20 Enterprise Technology PMO COU COM-1040 Communications Work Complete Coulee R-634 0 18-Jun-20 Build Northwest Build Northwest A-970 444 18-Dec-18 15-Sep-20 OUTAGESOUTAGES 5 04-Sep-20 10-Sep-20 NW O-1000 Northwest 115kV Outage 5 04-Sep-20 10-Sep-20 System Operations NW O-1010 Construct Northwest A-970 2 04-Sep-20 07-Sep-20 System Operations Mechanical WorkMechanical Work 0 18-Dec-18 18-Dec-18 NW M-1000 Mechanical Work Complete A-970 0 18-Dec-18 Electrical WorkElectrical Work 237 25-Sep-19 28-Aug-20 NW E-1000 Construct Relay Panel A-970 10 25-Sep-19 08-Oct-19 Justin Louie NW E-1020 Install Air Switch A-970 5 23-Jul-20 29-Jul-20 Justin Louie NW E-1030 Install Breaker A-970 5 30-Jul-20 05-Aug-20 Justin Louie NW E-1040 Install Air Switches A-1070 & Bus 5 30-Jul-20 05-Aug-20 Justin Louie NW E-1050 Grounding 5 06-Aug-20 12-Aug-20 Justin Louie NW E-1060 Field Wiring A-970 10 13-Aug-20 26-Aug-20 Justin Louie NW E-1070 Gas Breaker A-970 1 27-Aug-20 27-Aug-20 Justin Louie NW E-1080 Breaker Commissioning Testing A-970 1 28-Aug-20 28-Aug-20 lbert Sisk NW E-1010 Electrical Work Complete A-970 0 28-Aug-20 Relay Tech WorkRela Tech Work 266 20-Aug-19 03-Sep-20 NW R-1000 Protection Settings (NW A-970)5 20-Aug-19 26-Aug-19 Relay & Protection Design NW R-1010 Points List (NW A-970)5 27-Aug-19 03-Sep-19 Relay & Protection Design NW R-1020 SCADA Programming Northwest A-970 45 04-Sep-19 05-Nov-19 SCADA NW R-1030 Program Relays 5 09-Oct-19 15-Oct-19 Mark Babin NW R-1040 Relay Panel Checkout 5 16-Oct-19 22-Oct-19 Mark Babin NW R-1050 Relay & SCADA Checkout 2 27-Aug-20 28-Aug-20 Mark Babin NW R-1060 PT/CT Testing 5 28-Aug-20 03-Sep-20 Mark Babin NW R-1070 Relay Work Complete 0 03-Sep-20 CommissioningCommissionin 8 04-Sep-20 15-Sep-20 NW C-1000 PT/CT Testing 5 04-Sep-20 10-Sep-20 Mark Babin NW C-1010 End to End Testing 3 11-Sep-20 15-Sep-20 Mark Babin NW C-1020 Commissioning Complete 0 15-Sep-20 Remote End WorkRemote End Work 272 20-Aug-19 11-Sep-20 Electrical WorkElectrical Work 1 18-Sep-19 18-Sep-19 NW REW-1030 Electrical Work NW A-970 1 18-Sep-19 18-Sep-19 Relay Tech WorkRelay Tech Work 272 20-Aug-19 11-Sep-20 NW REW-1010 Protection Settings for Remote End NW A-970 1 20-Aug-19 20-Aug-19 Relay & Protection Design NW REW-1020 Points List for Remote End NW A-970 1 21-Aug-19 21-Aug-19 Relay & Protection Design NW REW-1040 SCADA Programming for Remote End NW A-970 1 22-Aug-19 22-Aug-19 SCADA J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 19-Jun-20 19-Jun-20, Ma Relay Work C 25-Jun-20, Tr 09-Dec-19 13-Dec-19, Transmission Construction 25-Jun-20 25-Jun-20, Tr 22-Jul-20, 10-Jul-20 16-Jul-20, 17-Jul-20 21-Jul-20, 22-Jul-20 22-Jul-20, Commissi 17-Jul-20, 17-Jul-20, 27-Aug-19 27-Aug-19, Relay & Protection Design 17-Jul-20 17-Jul-20, 19-Jun-20, Co 19-Jun-20 19-Jun-20, En 18-Jun-20, Co 23-Oct-19 23-Oct-19, Enterprise Technology PMO 17-Jun-20 17-Jun-20, Ent 17-Jun-20 17-Jun-20, Ent 18-Jun-20 18-Jun-20, En Communicatio 15 10- 04-Sep-20 10- 04-Sep-20 07- 18-Dec-18, Mechanical Work Mechanical Work Complete A-970 28-A 25-Sep-19 08-Oct-19, Justin Louie 23-Jul-20 29-Jul-20 30-Jul-20 05-Aug- 30-Jul-20 05-Aug- 06-Aug-20 12-Aug 13-Aug-20 26-A 27-Aug-20 27-A 28-Aug-20 28-A Elect 03- 20-Aug-19 26-Aug-19, Relay & Protection Design 27-Aug-19 03-Sep-19, Relay & Protection Design 04-Sep-19 05-Nov-19, SCADA 09-Oct-19 15-Oct-19, Mark Babin 16-Oct-19 22-Oct-19, Mark Babin 27-Aug-20 28-A 28-Aug-20 03- Rel 15 04-Sep-20 10- 11-Sep-20 15 C 11- 18-Sep-19, Electrical Work 18-Sep-19 18-Sep-19, 11- 20-Aug-19 20-Aug-19, Relay & Protection Design 21-Aug-19 21-Aug-19, Relay & Protection Design 22-Aug-19 22-Aug-19, SCADA 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 6 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 6 of 7 Activity ID ctivity Name Original Duration Start Finish Resources NW REW-1050 Relay Tech Work at Remote End NW A-970 (Inc SCADA Ch 1 11-Sep-20 11-Sep-20 Mark Babin Communications Communications Work 1 28-Aug-20 28-Aug-20 NW REW-1000 Communications Work Complete at Remote End NW A-970 1 28-Aug-20 28-Aug-20 Enterprise Technology PMO CommunicationsCommunications 217 23-Oct-19 28-Aug-20 NW COM-1010 Ruggedcom Configuration 1 23-Oct-19 23-Oct-19 Enterprise Technology PMO NW COM-1040 Comm Equipment Install 1 27-Aug-20 27-Aug-20 Enterprise Technology PMO NW COM-1030 Fiber Termination Support 1 27-Aug-20 27-Aug-20 Enterprise Technology PMO NW COM-1020 Comms Path Test 1 28-Aug-20 28-Aug-20 Enterprise Technology PMO NW COM-1000 Communications Work Complete NW A-970 0 28-Aug-20 Install South Bus Install South Bus 230kV Rela in 27 25-Jun-20 03-Aug-20 OUTAGEOUTAGE 5 24-Jul-20 30-Jul-20 S. Bus Relaying-1 230kV Main Bus Outage (Separate Busses)5 24-Jul-20 30-Jul-20 System Operations Electrical WorkElectrical Work 21 25-Jun-20 24-Jul-20 S. Bus Relaying-1 Construct Relay Panel S. Bus 10 25-Jun-20 09-Jul-20 Justin Louie S. Bus Relaying-1 Remove Pipe Section on 230kV Main and S. Bus 1 24-Jul-20 24-Jul-20 Justin Louie Relay Tech WorkRela Tech Work 10 10-Jul-20 23-Jul-20 S. Bus Relaying-1 Program Relays 5 10-Jul-20 16-Jul-20 Mark Babin S. Bus Relaying-1 Relay Panel Checkout 5 17-Jul-20 23-Jul-20 Mark Babin S. Bus Relaying-1 Relay Work Complete 0 23-Jul-20 CommissioningCommissionin 7 24-Jul-20 03-Aug-20 S. Bus Relaying-1 PT/CT Testing 1 24-Jul-20 24-Jul-20 Mark Babin S. Bus Relaying-1 Relay & SCADA Checkout 2 27-Jul-20 28-Jul-20 Mark Babin S. Bus Relaying-1 End to End Testing 3 29-Jul-20 31-Jul-20 Mark Babin S. Bus Relaying-1 Commissioning Complete South Bus 230kV 1 03-Aug-20 03-Aug-20 CommunicationsCommunications 3 29-Jul-20 31-Jul-20 3150 Communications Work Complete S Bus 230kV Relaying 3 29-Jul-20 31-Jul-20 Enterprise Technology PMO CloseoutCloseout 0 15-Sep-20 15-Sep-20 2910 Substantial Completion 0 15-Sep-20 J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S 11-Sep-20 11- 28-A 28-Aug-20 28-A 28-A 23-Oct-19 23-Oct-19, Enterprise Technology PMO 27-Aug-20 27-A 27-Aug-20 27-A 28-Aug-20 28-A Com 03-Aug- 30-Jul-2 24-Jul-20 30-Jul-2 24-Jul-20, 25-Jun-20 09-Jul-20, J 24-Jul-20 24-Jul-20, 23-Jul-20, 10-Jul-20 16-Jul-20, 17-Jul-20 23-Jul-20, Relay Wo 03-Aug- 24-Jul-20 24-Jul-20, 27-Jul-20 28-Jul-20 29-Jul-20 31-Jul-2 03-Aug-20 03-Aug- 31-Jul-2 29-Jul-20 31-Jul-2 15 S 05-Dec-18 12:31 Remaining Level of Effort ctual Level of Effort ctual Work Remaining Work Critical Remaining Work Milestone Summary Page 7 of 7 Date Revision Checked Approved 01-Dec-18 Westside Phase 2, Progress Update KA IFG_PR_073 Attachment B Page 7 of 7