HomeMy WebLinkAbout20200901Avista to Staff PR5 Attach D.docx4CS2 Single Phase Transformer ER 4206 Project: 61005097, 61005098, 61005099 INTEROFFICE MEMORANDUM To: Andy Vickers, Jacob Reidt, Thomas Dempsey, Mike Mecham, Jason Thackston From: Kara Heatherly Subject: CS2 Budget Analysis and Realignment Date: April 20, 2020 This memorandum is intended to reflect the current understanding of the scope of services and planned expenditures for the CS2 Single Phase Transformer. In December 2019, through the approval of the CS2 Single Phase Transformer Business Case, the Steering Committee elected to replace T4 with four (4) new single-phase transformers (three (3) to be immediately operational and one spare). The anticipated budget for this alternative was derived from Black and Veatch’s cost estimate and augmented with projections for activities not included to produce a total anticipated budget of $15.1M. This budget breakdown is as follows: Project Activity BudgetEngineering (B&V) $621,000 Construction Activities (installation, foundations, steel supports, HVAC) $2,366,038 Transformer (Siemens) $8,152,060 IsoPhase Bus (TBD) $1,480,846 Consulting oversight, Transformer (VPF) $200,000 AvistaExpenses: Internal Project Management and Design, CM, AFUDC and Cap Overheads $1,771,133 Contingency (3%) $500,000 TOTAL $15.1M Year 2020 Budget 2020 $7,000,000 2021 $4,000,000 2022 $1,600,00 TOTAL $12.6M When the 2020 5-year CPG was establishedCS2 Single Phase Transformer was allocated 12.6 Million dollars to be expended over a 3-year period. Recentdevelopments have informed our cost projections and, in some cases, impacted our existing commitments. Expediting civil work to 2020 outageas to not expose power grid to higher risk in 2021. Doing the project in a single year would have required an eight (8) month outage from March 2021 to September 2021. The phased approach we chose allows us to avoid critical high power cost months and also reduce the risk of having to provide temporary storage -and thus multiple handling- for the single phase units. Additionally, the phased approach allows us to further reduce potential downtime by taking concrete pad curing off of the critical path. Transformer layout reconfiguration. After awarding the contract to Siemens Austria, they recommended some design changes over what they had originally proposed that they felt would increase safety margins and decrease the potential for electrical faults. Avista agreed with their proposal but the configuration change required an additional engineering iteration to accommodate the design change. Project Activity Original Business Case Estimate Current Estimate Anticipated VarianceEngineering (B&V) $621,000 $1,235,995 $614,995■ ■ Construction Activities (installation, foundations, steel supports, HVAC) and Electrical Work $2,366,038 $4,800,000 $2,433,962■■ Early Civil Works Package (McMillen) ---- $2,700,000 ---- Anticipated 2021 GCCM Contract ---- $2,100,000 ---- Transformer (Siemens) $8,152,060 $8,347,597 $195,537■ IsoPhase Bus (TBD) $1,480,846 $1,674,000 $193,154 ■ Consulting oversight, Transformer (VPF) $200,000 $337,000 $137,000■■ Avista Expenses: Internal Project Management and Design, CM, AFUDC and Cap Overheads $1,771,133 $2,500,000 $728,867■ CM and Inspection Services ---- $253,000 $253,000 ■ PGE Staff Support Services ---- $100,000 $100,000■ Contingency (3% to 5%) $500,000 $1,000,000 $500,000■ ADD: Firewall Fabrication and Installation ---- $1,168,700 $1,168,700 ■ ■ TOTAL $15.1M $21.4M $6.3M Enhanced accuracy of information based on standard design progression, contracted scopes of work, and improved budgeting protocols. In addition, maintaining design, fabrication, and construction schedules within the environment created by the global pandemic of COVID-19 has increased process and oversight expense. Year 2020 5-Year CPG Anticipated Cash Flow Anticipated Variance 2020 $7,000,000 $9,900,000 $2,900,000 2021 $4,000,000 $11,500,000 $7,500,000 2022 $1,600,000 ---- ($1,600,000) TOTAL $8.8M Applying the new budget projections to the currently approved CPG budget, we are forecasting the following variances: As is standard in cost-benefit considerations, we weigh these changes against the risk they are designed to mitigate. The risk exposure of the original 2021 outage is high. The risk comparison of our current phased outage schedule against the originally proposed single-year outageis presented below: Alternative 1 (phased outage) Risk Exposure: MODERATE Alternative 2 (single-year outage) Risk Exposure: HIGH 2020 Outage 2020 Outage Duration April 20 – June 1 (2 months) Cost April (half) $549,786.83 May $630,259 June (half) $329,230 2021 Outage 2021 Outage Duration March 1 – June 30 (4 months) March 1 – Oct. 30 (8 Months) Cost March $3,434,986 $3,434,986 April $1,384,036 $1,384,036 May $1,008,244 $1,008,244 June $1,051,236 $1,051,236 July ---- $6,062,671 August ---- $7,459,616 September ---- $6,407,563 October ---- $3,862,019 TOTAL COST $8,388,679 $30,671,272 SAVINGS $22,282,592 While it has been a process to gain the full understanding of the cost to maintain grid reliability, the data still continues to demonstrate that the benefits far outweigh the risks. In the next couple of months, the Coyote management team will be procuring the few remaining project components and thus solidifying the remaining budget projections. It is our intention to have this work completed by July and prior to the 2020 5-year CPG process (for 2021-2025) as to provide further cost assurance to Avista leadership at that time. 2020 Budget Impacts Item Original Business Case Estimate Current Estimate Anticipated Variance 2020 Construction $1,300,000 $2,700,000 $1,400,000 CM 2021 $0 $250,000 $250,000 Design Services $500,000 $1,250,000 $750,000 Firewall $0 $450,000 $450,000 Transformer Configuration $0 $56,000 $56,000 TOTAL $2.9M