Loading...
HomeMy WebLinkAbout20190924Avista to Staff Emmert Cost Est-080414.pdf Clackamas Office: 11811 SE Hwy 212 ~ Clackamas, Oregon 97015 ▪ Phone 503.655.7191▪ Fax 503.650.2289 April 11, 2008 Sara Koeff Avista Utilities 1411 East Mission Ave MSC 51 Spokane, Washington 99220 SENT VIA E-MAIL Re: Transport Transformer – Boardman, Oregon to Gebze, Turkey Emmert International Project C081549 Ms. Koeff, Thank you for considering Emmert International for your upcoming project. With over 40 years in the Engineered Transport and Specialized Rigging Industry, Emmert International has the experience, expert personnel and equipment to get the job done in the safest most efficient manner possible. Emmert International is please to provide a budget estimate of Seven Hundred Seventy Five Thousand Dollars ($775,000.00 USD) to remove one (1) transformer (31.16’ L x 11.48’ W x 16.4’ H 434,400 lbs) from foundation located in Boardman, Oregon, transport to on-site rail spur, load and lash to railcar, transport via rail to the Port of Houston, Texas, offload to ocean heavy- lift ship, transport via heavy lift ship to Turkey, offload directly to a suitable highway transporter, and transport to final destination located in Gebze, Turkey. A detailed route survey will be required to confirm this, and completion of this route survey will require detailed shipping drawings. Please note that the price of performing utility work and removal and reinstallation of overhead obstructions is not included in this price and will be performed on an actual time and materials used plus 15% fee basis. Our price includes permits, escorts, all management, labor, equipment, and material to perform the work and is based upon: ¾ Mutually acceptable purchase order and/or contract terms. 50% payment is due upon loading to ship, 50% due upon arrival at destination. ¾ Performing the work using open shop labor during a standard work week. Price does not include overtime, weekend, or holiday work. ¾ Prices are quoted in today’s values and do not include any amounts for escalation. Emmert International will reevaluate prices 30 days prior to the start of work. ¾ The price quoted assumes formal acceptance by the appropriate agencies using the transporter configuration indicated above. Transport Transformer – Boardman, Oregon to Gebze, Turkey Emmert International Project C081549 Page 2 ¾ Price is subject to current exchange rates at the actual time of all work performed outside of the US. ¾ Duties, customs clearance charges, port charges at destination, port storage costs, customs clearance documentation, marine insurance and import fees are by others. Delays caused by customs, weather or others, is not included. ¾ Project is subject to equipment availability, vessel space allocation and sailing schedule. ¾ The cost of utility work and removing overhead obstructions is not included. This work will be performed on an actual time and materials used plus fee basis. ¾ Tarping and weather protection is not included. ¾ No demurrage time is included. Emmert International’s price is based on receiving cargos on transport and unloading by others immediately upon arrival. Additional mobilizations and demobilizations to perform the offloading work will be performed on an actual time and materials, plus fees, basis. ¾ Published rail rates at the time of quotation. All rail charges are budgetary and will be re- assessed on conditions after clearance and at the actual time of transport. This quotation does not include special train charges, idler cars, counterweights, Rule 11 Charges, or any other additional charges imposed by the railroad. ¾ This price does not include the cost for siding leases or site access costs. ¾ Rail clearances are included. Price to perform is $1,950.00. This amount is non- refundable, but will be applied to the total contract amount stated above if awarded the transportation of the project. ¾ Our standard cargo insurance is for a maximum value up to $1,000,000.00 per load based on declared value. Emmert International maintains insurance up to $1,000,000.00. However; all claims are limited to $2.50 per pound unless otherwise declared on the shipping documents. If additional insurance is required, the cost for such will be quoted separately upon request. Emmert International assumes no liability for cargo in excess of insured amount. Emmert International’s insurance does not cover the cargo during loading to ship or ocean transport. ¾ State, local, use taxes, fees, permits (other than trucking), additional licenses, additional insurances, additional training, infrastructure improvements, overtime, utility charges, fuel surcharges (fuel cost at $ 4.00/gal), liquidated damages, cost of right of way clearances are not included. If you have any questions, or require additional information, please contact me at 503.655.7191 ext. 242. Respectfully, Mark Hefty Project Development Manager