HomeMy WebLinkAboutSteppe EVD 260929-30 Steppe Field Inspection IPUC Pipeline Safety Inspection
Inspector(s): Galli, Green Date(s): 260929-30
Company/Owner: Steppe EVD Dairy LLC Unit/OPID: 40795
Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug &Alcohol: ❑ Inspection Days: 2.5
Inspection Summary
2026 Steppe—Field Inspection
September 29, 2026: (2.0 Standard) (Galli 1.0) (Green 1.0)
Inspectors Galli and Green traveled to Raft River and met with Ensery Solutions company representatives
at the Williams connection point for a briefing and began the field audit. (2) launcher/receiver sites, (8)
cathodic protection test points, (6) emergency control valves, multiple pipeline markers were inspected for
compliance with FAR Part 192. The PHMSA IA question set was used as a guide throughout the audit to
ensure all areas were completed.
September 30,2026: (0.5 Standard) (Galli 0.5)
Completed and attached audit forms: PHMSA IA question set with OQ Protocol 9, IPUC Form 1, Post-
Inspection Preliminary Written Findings and attached inspection documents.
Discrepancies:
1. One of the threaded connections on an 8-bolt flange at the Williams Connection site had
inadequate thread engagement. Ensery Solutions is aware of the issue and will fix the issue during
the annual shutdown.
Corrective Action Required: ❑ Yes ® No Compliance Letter#:
Lead Inspector: Galli Date: Reviewer: Brooks Date:
260930 z aO1;
Signature: Signature:
IPUC Form 1 Rev. 12/08/2025