Loading...
HomeMy WebLinkAboutAmeriGas 260916 AmeriGas NFPA 58 IPUC Pipeline Safety Inspection Inspector(s): GaW, Brooks Date(s): 260916 Company/Owner: AmeriGas Propane Unit/OPID: 32013 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 1.0 Inspection Summary 2026 AmeriGas—NFPA 58 September 16, 2026: (1.0 Standard) (0.5 Brooks) (0.5 Galli) Inspectors Galli and Brooks reviewed AmeriGas's safety and training policies against the IA question set for compliance with applicable regulations regarding NFPA 58 standards. Wrote IPUC Form 1 and sent Post-Inspection Written Preliminary Findings to Chad Krouse, Compliance Manager. Discrepancies: 6.29.4.3 Emergency controls shall be conspicuously marked, and the controls shall be located so as to be readily accessible in emergencies. Key Valve Procedure (Page 2 of 3) - Underground valves must have a unique valve number in the valve box to ensure operation of the proper valve during emergencies or regular maintenance. None of the emergency valves had unique identifiers in the valve box per the Key Valve procedure in the AmeriGas Operations and Maintenance Manual. Additionally, NFPA 6.29.4.3 broadly references emergency controls and the Key Valve procedure limits the unique identification to only underground valves. Staff recommends the Key Valve procedure be updated to match NFPA standards. Corrective Action Required: ® Yes ❑ No Compliance Letter#: NOPV AG202601 Lead Inspector: GaW Date: Reviewer: Brooks Date: 260917 Signature: Signature: a.L i0 a 6 IPUC Form 1 Rev. 12/08/2025