Loading...
HomeMy WebLinkAboutAmeriGas 260915-17 AmeriGas Records Inspection IPUC Pipeline Safety Inspection Inspector(s): Galli,Brooks Date(s): 260915, 260917 Company/Owner: AmeriGas Propane Unit/OPID: 32013 Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug &Alcohol: ❑ Inspection Days: 2.5 Inspection Summary 2026 AmeriGas —Records Inspection September 15, 2026: (2.0 Standard) (1.0 Galli) (1.0 Brooks) Inspectors Galli and Brooks reviewed AmeriGas Tamarack records against the IA question set for compliance with applicable regulations. September 17, 2026: (0.5 Standard) (0.5 Galli) Wrote IPUC Form 1 and sent Post-Inspection Written Preliminary Findings to Chad Krouse, Compliance Manager. Discrepancies: 1. AmeriGas was unable to provide applicable PQRs. AmeriGas will be transitioning to a different contract for welding with UGI. If welding is conducted under acceptance criteria API 1104 and ASME section 9 the procedures need to be updated to state both criteria. At the time of inspection, only API 1104 was referenced. 2. An accurate emergency valve list was not provided. 3. A unique identifier for each emergency valve in accordance with NFPA 58, Section 6.29.4.3, and the AmeriGas Key Valve Procedure was not provided. 4. Regulator inspection records for calendar years 2022, 2023, and 2024 indicate outlet pressures range from 10.5 to 12 psi vs 10 psi MAOP. 5. No records were available documenting the replacement or maintenance of relief devices in accordance with NFPA 58 or as required by manufacture recommendations. 6. Bi-monthly rectifier inspections were not being consistently performed and documented as required by 49 CFR § 192.465. Corrective Action Required: ® Yes ❑ No Compliance Letter#: AG202601 Lead Inspector: Galli Date: Reviewer: Brooks Date: 260917 Signature: Signature: IPUC Form 1 Rev.12/08/2025