HomeMy WebLinkAboutIntermountain Gas 260914-17 Boise Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260914/16/17 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: W Amity Rd and S Maverick Way and City/District: Boise Arrowhead Contractor/Job#: WO 3298549 Foreman: J. Operator Supervisor: Ron Sanders/QCI 329881 Grove Job Description: 2" Main replacement System Type: ® GD ❑ GT ❑ GG One-Call Ticket: 2026371998 Total Inspection Days: 3.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT SF 418 4. Pipe Installation(Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 100PSI for 2 hours 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT In File 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher, JSA SF 422 IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 SAT Already exposed 21. Plastic Pipe OPS 307 SAT Verified proper rollback of completed - Joiner(s) Qualified OPS 309 butt fusions and electrofusion's - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (W Amity Rd and S Maverick Way and Arrowhead, Boise, ID) Safety equipment, JSA, material verification, verified operator qualifications, correct trench depth, verified proper rollback of completed butt fusion, hydro vac located all lines unmarked, electro-fusions and 2 hour pressure test. Job included: 2"PE install across W Amity Rd/and tie into Aldyl-A. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260917 �L_6 10eb Signature: Signature: #14-- IPUC Form 4 Rev. 12/08/2025