Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260910 Nampa Construction Construction
IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260910 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 4280 E Flamingo City/District: Nampa Contractor/Job#: W012717075 Foreman: Dasco Operator Supervisor: NONE A.Rodriguez Job Description: 2" Service Temp Bypass System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026342372 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 N/A SF 418 4. Pipe Installation (Tracer Wire) OPS 308 N/A OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 N/A 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher, JSA and shore box SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to expose 4" service line 21. Plastic Pipe OPS 307 SAT Verified proper rollback of completed - Joiner(s) Qualified OPS 309 butt fissions - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (4280 E Flamingo,Nampa, ID) Safety equipment, JSA, shore box, material verification, verified operator qualifications, correct trench depth, verified proper rollback of completed butt fusion. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galls Date: Reviewer: Brooks Date: 260910 Signature: r Signature: -.1.61 10 0 6 IPUC Form 4 Rev. 12/08/2025