HomeMy WebLinkAboutAmeriGas 260902-14 AmeriGas Propane DIMP Audit IPUC Pipeline Safety Inspection
Inspector(s): Gatti, Brooks Date(s): 260902, 260914
Company/Owner: AmeriGas Propane Unit/OPID: 32013
Standard: ❑ Training: ❑ TIMP/DIMP: ® OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 1.0
Inspection Summary
2026 AmeriGas Propane—DIMP Audit
September 2, 2026: (0.5 Standard) (0.5 Galli)
Audit consisted of Idaho Public Utilities Commission (IPUC) inspector Galli auditing AmeriGas Propane
Distribution Integrity Management Program for compliance with applicable regulations of CFR Part 192.
September 14,2026: (0.5 Standard) (0.25 Galli) (0.25 Brooks)
Completed the review of AmeriGas Propane Distribution Integrity Management Program (DIMP) against
IA question set for compliance with 49 CFR Part 192. Wrote IPUC Form 1 and sent Post-Inspection
Written Preliminary Findings to Chad Krouse, Compliance Manager.
Discrepancies:
AmeriGas Tamarack identifies both vaporizers as DIMP threats but could not provide documentation
showing effective mitigation, such as annual inspections or contractor-performed preventative
maintenance.
Corrective Action Required: ® Yes ❑ No Compliance Letter#: NOPV AG202601
Lead Inspector: Gatti Date: Reviewer: Brooks Date:
Signature: 260916 t � Signature:
1
IPUC Form 1 Rev. 12/08/2025