HomeMy WebLinkAboutAmeriGas 260902-08 AmeriGas Propane Procedure Audit IPUC Pipeline Safety Inspection
Inspector(s): Perkins, Green, Galli Date(s): 260902, 260908
Company/Owner: AmeriGas Propane Unit/OPID: 32013
Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ❑ Damage Prevention: ❑ Drug&Alcohol: ❑ Inspection Days: 1.5
Inspection Summary
2026 AmeriGas Propane—Procedures Audit
September 2,2026: (1.0 Standard) (0.5 Perkins) (0.5 Green)
Audit consisted of Idaho Public Utilities Commission(IPUC)inspector Perkins and Green auditing
AmeriGas Propane Operations and Maintenance Manual's for compliance with applicable regulations of
CFR Part 192.
September 8, 2026: (0.5 Standard) (0.5 Galli)
Completed the review of AmeriGas Propane Operations and Maintenance Manual against IA question set
for compliance with 49 CFR Part 192. Wrote IPUC Form 1 and sent Post-Inspection Written Preliminary
Findings to Chad Krouse, Compliance Manager.
Discrepancies:
None.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Lead Inspector: Galli Date: Reviewer: Brooks Date:
260916
Signature: Signature:
IPUC Form 1 Rev. 12/08/2025