HomeMy WebLinkAboutIntermountain Gas 260901 Nampa Construction Construction IPUC Construction Inspection Inspector(s): Perkins Date(s): 260901 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 3614 Skyline Drive City/District: Nampa Contractor/Job #: W012686042 Foreman: C. Operator Supervisor: NONE Ballantyne Job Description: 3/4" Service System Type: X❑ GD ❑ GT ❑ GG One-Call Ticket: 2026353550 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 91 PSI 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Purged and sealed abandoned Aldy-A service line. 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 1 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to expose service stub, repaired 2 irrigation lines that were unlocated. 21. Plastic Pipe OPS 307 SAT Mechanical Fitting(Con-stab), -Joiner(s) Qualified OPS 309 Squeeze off -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (3614 Skyline Dr, Nampa, ID) Safety equipment, JSA, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1200, tracer wire, bedding with sand, pressure test, squeeze off, mechanical fitting (con-stab) and backfill. Relocated 3/"Adyl-A gas line to the side of the new garage with PE pipe. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260901 a6 ioo6 Signature: / z %� Signature: 4 IPUC Form 4 Rev. 12/08/2025