Intermountain Gas 260810 Pocatello Construction Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 260810 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 KV Utilities Address: 1315 Falcon Ridge Rd City/District: Pocatello Contractor/Job#: KV-Utilities Foreman: Operator Supervisor: None W012691330 M. Doig Job Description: 3/4" Service Line System Type: ❑x GD ❑ GT ❑ GG One-Call Ticket: 2026313041 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Native soil SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 100 PSI 15min 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT Fusing, electro fuse - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (1315 Falcon Ridge Rd. Pocatello, ID): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of 3/" butt fusion, electro fuse, 1200 EFV, tracer wire, and pressure test. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260810 l610 a6 Signature: .j' Signature: IPUC Form 4 Rev. 12/08/2025