Loading...
HomeMy WebLinkAboutIntermountain Gas 260901 Caldwell Construction Construction IPUC Construction Inspection Inspector(s): Galli, Green Date(s): 260901 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: Element Ridge/Verbena Ranch Subdivisions City/District: Caldwell Contractor/Job#: W012720022, Foreman: Operator Supervisor: None W012661788 Crown/Dasco Job Description: 2" Main Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: Element Ridge/Verbena Ranch Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 UNS Observed completed butt fusions, - Joiner(s) Qualified OPS 309 electrofusion saddles. - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (Element Ridge/Verbena Ranch Subdivisions, Caldwell, ID) Safety equipment, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1200, tracer wire, verified proper rollback of completed butt fusions and bedding with sand. Discrepancies: -Staff observed completed fusions using a damaged and dirty heat fusion element. Contract employees stopped fusion when questioned about maintenance of fusion equipment. Staff identified three dirty/ damaged heating elements. These were found at the Element Ridge location. W012720022 •In the Verbena Ranch subdivision, staff identified several unsatisfactory fusions in a staging area. No work was being done in the area at the time. Corrective Action Required: ® Yes ❑ No Compliance Letter#: LOC I202617 Lead Inspector: Galli/Green Date: Reviewer: Brooks Date: 260902 �4� Signature: � Signature: IPUC Form 4 Rev. 12/08/2025