Loading...
HomeMy WebLinkAboutAvista 260826 Sandpoint Construction Construction IPUC Construction Inspection Inspector(s): Galli (1.0), Green (0.5) Date(s): 260826 Company/Owner: Avista Utilities Unit/OPID: 31232 Address: 1207 Ontario Street,318 Huppert Lane City/District: Sandpoint Contractor/Job#: Foreman: Operator Supervisor: None 10368273, 1036856347 L. Huber Job Description: %" Service Line System Type: © GD One-Call Ticket: Customer provide trench, 262300015 Total Inspection Days: 1.5 Tasks: Procedure# Rating Comments 1. Materials-Handling, Storage, Labeling 3.12-3.13 SAT 2" dated 09/2025 and 08/2025 2. Trenching/Boring-Depth, Clearance 3.15 SAT 3. Bedding/Backfill 3.15 SAT Bedding with sand 4. Pipe Installation(Tracer Wire) 3.13 SAT 14-gauge in open trench312 5. Valve Installation 2.14 N/A 6. Coating Condition 2.12 N/A 7. Manuals-Field Procedures, O & M 1.4 SAT All procedures followed 8. Testing-Pressure, Duration, Type 2.12-13/3.18 SAT 100 psi for 1 hour 9. OQ Qualifications 4.31 SAT Verified 10. Casing Seal/Installation 3.42 N/A 11. Service Line Installation 3.16 SAT 12. Tie-In/Hot Tapping 3.32 N/A 13. Meter Location/Regulator Testing 2.22 SAT 14. Equipment Calibration Verification 5.11,14,21 SAT Verified 15. EFV Installation 3.16 SAT EFV 1200 16. MAOP 4.15 N/A 17. Purge 3.17 N/A 18. Safety Equipment GESH 4 SAT Fire Extinguisher and JSA 19. Abandonment 5.16 N/A 20. Line Locating 4.13 N/A 21. Plastic Pipe 3.23-25 SAT Mechanical fittings - Joiner(s) Qualified 3.34 (coupler and bolt-on tapping tee) - Squeeze - Fusion Tools - Heat Plate - Joining Procedure IPUC Form 4 Re,,. 12/08/2025 IPUC Construction Inspection 22. Steel Pipe N/A - Welder(s) Qualified 3.22 Pipe/Coating—Inspected/Repaired 2.12 - Cathodic Protection 2.32 -Non-Destructive Testing 3.12 - Welding Procedures - Removal of asbestos wrap - Exothermic Welding Additional Comments: Observations included(1207 Ontario Street, Sandpoint, ID) (Main Line): Safety equipment, JSA, customer provided trench, verified operator qualifications, verified equipment calibration, correct trenchibore depth, mechanical fitting (couplers and bolt-on tapping tee), EFV 1200 installed with bolt-on tapping tee, tracer wire and bedding with sand and successful pressure test. All observed procedures were followed in accordance with Avista procedures. Observations included (318 Huppert Lane, Sandpoint, ID) (Service Line): Safety equipment, JSA, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, thumper bore, mechanical fitting(coupler), tracer wire and bedding with native soil. All observed procedures were followed in accordance with Avista procedures. Corrective Action Required: ❑ Yes N No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: 260826 Signature: Signature: IPUC Form 4 Rev. 12/08/2025