HomeMy WebLinkAboutIntermountain Gas 260817 Boise Safety IPUC Pipeline Safety Inspection
Inspector(s): Brooks Date(s): 260817
Company/Owner: Intermountain Gas Company Unit/OPID: 08160
Standard: ❑ Training: ❑ TIMP/DIMP: ❑ OQ: ❑
Incident: ® Damage Prevention: ❑ Drug&Alcohol: ❑ Inspection Days: .5
Inspection summary
August 17, 2026: (.5 Incident) (Brooks 0.5)
IPUC Pipeline Safety Program Manager Brooks and Staff met Veolia and IGC staff virtually to follow
up, discuss, and address a state reportable incident and how to prevent it related to valves.
Topics covered:
1. Gas and water mains often share the same utility corridors, which can cause their surface valve
boxes to appear similar when covered by soil or pavement.
2. Valve covers are typically labeled for their respective utilities, with gas valve covers generally
painted yellow for identification.
3. The group noted the high number of gas valves located in proximity to Veolia-managed assets,
increasing the potential for confusion.
4. The seriousness of the incident—and what could have occurred—was acknowledged by all
participants.
5. IGC reiterated that mistakenly shutting off a gas main disrupts service and triggers mandatory
safety testing before service restoration.
6. The operating characteristics of each type of valve were discussed, including the 1/4 turn
common to gas valves versus the multi turn operation of water valves.
7. IGC offered valve identification and operations training for Veolia's field crews, which Veolia
accepted. Scheduling is currently in progress.
8. IGC offered formal valve identification and operations training for Veolia's field crews, which
Veolia accepted. Scheduling is currently in progress.
9. IGC and Veolia both expressed appreciation for having new points of contact to improve
communication and coordination going forward.
Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA
Lead Inspector: Brooks Date: 260819 Reviewer: Date:
Signature: Signature:
IPUC Form 1 Rev. 12/08/2025