Loading...
HomeMy WebLinkAboutIntermountain Gas 260810 & 260811 Idaho Falls Safety IPUC Pipeline Safety Inspection Inspector(s): Galli, Perkins Date(s): 260810 & 260811 Company/Owner: Unit/OPID: 08160 Intermountain Gas Company (IGC) Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug& Alcohol: ❑ Inspection Days: 3.5 Inspection Summary IGC Idaho Falls Field Inspection August 10 & 11, 2026: (2.0 Standard MG) (1.0 Standard BP) IPUC inspectors traveled to and met with IGC company representatives at the Idaho Falls District Office for an in-brief, reviewed OQ records for all personnel and began the field audit. Regulator Stations: 24 regulator stations and 1 large industrial meter set were inspected for proper operation, regulator lock-up, relief device operation, cathodic protection pipe-to-soil readings, pipe-to soil interface wrap protection, station warning signs and right-of-way clearances. 14 casing-to-carrier isolation checks, 8 cathodic protection rectifiers, 19 pipeline patrol, 34 emergency/isolation valves and 15 HPSSs were inspected, 25 HPSSs were reinspected for non-compliance items from the 2025 Field Inspection. Observations are listed below. An exit interview was performed following the district inspection with field personnel of Intermountain Gas Company and MDU Compliance Manager Colby Lundstrom. August 17, 2026: (0.5 Standard MG) Completed and attached audit forms: PHMSA IA question set with OQ Protocol 9, IPUC Form 1, Post- Inspection Preliminary Written Findings and attached inspection documents. Discrepancies: Regulator station 48741-RS-60824 primary regulator failed due to a small amount of metal shavings in the main diaphragm. The regulator locked up as normal after being disassembled and cleaned. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202615 Lead Inspector: Galli Date: Reviewer: Brooks Date: 260817 Signature: { Signature: f� IPUC Form I Rev. 12/08/2025