Loading...
HomeMy WebLinkAboutAvista 260820 NTSB & IM Safety IPUC Pipeline Safety Inspection Inspector(s): Galli Date(s): 260820 Company/Owner: Avista Utilities, Enbridge Gas, Unit/OPID: 31232, 12876, 39370, 31442 Northwest Gas Processing, Douglas Pipeline Standard: ® Training: ❑ TIMP/DIMP: ❑ OQ: ❑ Incident: ❑ Damage Prevention: ❑ Drug & Alcohol: ❑ Inspection Days: 1.0 Inspection Sununary 2026 NTSB Recommendations and IM Implementations August 20, 2026: (1.0 Standard) (Galli 1.0) IPUC inspector Galli reviewed the 2026 NTSB Recommendations and IM Implementations for Avista Utilities, Enbridge Gas, Northwest Gas Processing, Douglas Pipeline. All applicable sections have been found in compliance. Corrective Action Required: ❑ Yes ® No Compliance Letter#: NA Lead Inspector: Galli Date: Reviewer: Brooks Date: Signature: 260820 Signature: IPUC Form 1 Rev. 12/08/2025