Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260818 Star Construction Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 260818 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 6405 Buena Vista Lane, 6135 Chateau Place City/District: Star Contractor/Job #: W012650799 Foreman: Dasco Operator Supervisor: N/A W012678622 J. Garcilazo Job Description: 3/4" Service Stub System Type: 0 GD ❑ GT ❑ GG One-Call Ticket: 2026310641, 2026320863 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 SAT 98 PSI 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1800 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher and JSA SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT Hand dig to expose service stub 21. Plastic Pipe OPS 307 SAT Butt Fusion, Mechanical Fitting - Joiner(s) Qualified OPS 309 (Con-stab), Squccze off - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (6405 Buena Vista Lane, Star, ID) Safety equipment, JSA, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1800, tracer wire, verified proper rollback of completed butt fusions, mechanical fitting(con-stab), bedding with sand, pressure test, squeeze off, backfill and continuity test. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Observations included: (6135 Chateau Place, Star, ID) Safety equipment, JSA, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1200, tracer wire, verified proper rollback of completed butt fusions and observed butt fusion process. All observed procedures were followed in accordance with IGC Operations and Maintenance Manual. Corrective Action Required: ❑ Yes ® No Compliance Letter#: Lead Inspector: Galli Date: Reviewer: Brooks Date: Signature: 260818 Signature: IPUC Form 4 Rev.12/08/2025