Intermountain Gas 260813-14 Rigby Construction Construction
IPUC Construction Inspection Inspector(s): Perkins Date(s): 260813-14 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 KV Utilities Address: 189 N. Yellowstone Hwy Trailer#14 City/District: Rigby Contractor/Job #: KV-Utilities . Foreman: Operator Supervisor: FOC-Justin Wood W012675886 J. Sitterud Job Description: 2" Main & 3/4" Service Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026301765 Total Inspection Days: 2.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Sand/Native soil/3/4" road mix SF 418 4. Pipe Installation (Tracer Wire) OPS 308 SAT OPS 322 5. Valve Installation OPS 703 SAT Tapping Tee Valve 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 SAT 21. Plastic Pipe OPS 307 SAT Fusing - Joiner(s) Qualified OPS 309 -Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Replace approximately 75' of 2" Aldyl-A that currently runs under trailer house with 2" MDPE in row and tie back in on eastside of trailer on the westside of the service tee. Relo for service going in across the road to #4. See attached job ticket for explanation. Additional Comments: Observations included: (189 N Yellowstone Hwy Trailer#14 Rigby, ID): Safety equipment, valid dig ticket, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper rollback of 3/4"butt fusion, bedding, backfill, 1200 EFV, tracer wire, installation of V bypass. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Parkins Date: Reviewer: Brooks Date: 260814 k6 0q 69 Signature: f Signature: #L__ IPUC Form 4 Rev. 12/08/2025