Intermountain Gas 260804-6 Meridian Construction Construction
IPUC Construction Inspection Inspector(s): Perkins 1 Date(s): 260804-6 Company/Owner: Intermountain Gas Company(IGC) I Unit/OPID: 8160 Address: 203 E Tower Lane City/District: Meridian Contractor/Job#: W012674425 Foreman: Dasco Operator Supervisor: N/A Jose Garcilazo Job Description: 4" Service Line/2" riser System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026312578 Total Inspection Days: 3.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 Unsat 48 inches/struck communications OPS 322 conduit and did not immediately identify utility owner. 3. Bedding/Backfill OPS 308 SAT Bedding/shaded with sand and SF 418 backfilled with native soil. 4. Pipe Installation (Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M Unsat IGC procedures followed, Idaho dig- line procedures not followed. 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 SAT Pigging 18. Safety Equipment SF 418 Unsat Fire extinguisher on site was not SF 422 charged correctly, and got a new one off truck IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 Unsat Did not excavate carefully and struck another utility owners line. 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 -Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (Intersection of Lake Hazel and Meridian): Safety equipment(fire extinguisher not charged, valid dig ticket,material verification, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper roll back of completed butt fusions, observed butt fusion process, pigging, tracer wire, shading,bedding with sand and backfilling. All observed procedures were followed in accordance with IGC procedures. Procedures required by Idaho's Guide to Safe Digging 2026- 2027 were not followed correctly. During excavation to locate a 4-inch PE main, an IGC contractor struck and damaged an unmarked purple conduit that was later identified as belonging to Lumen Technologies. Following the strike, the operator did not immediately cease excavation activities or notify the affected utility, as required, and instead continued excavating. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202612 Lead Inspector: Perkins Date: Reviewer: Brooks Date: 260804-6 �6090q Signature:j, Signature: IPUC Form 4 Rev. 12/08/2025