Loading...
HomeMy WebLinkAboutIntermountain Gas 260805 Nampa Construction Construction IPUC Construction Inspection Inspector(s): Galli Date(s): 260805 Company/Owner: Intermountain Gas Company (IGC) Unit/OPID: 8160 Address: 7752 & 7740 E Bullhead St City/District: Nampa Contractor/Job#: WO 12339649 Foreman: Dasco Operator Supervisor: N/A WO 12339598 A. Rodriguez Job Description: 3/4" Service Stub System Type: © GD ❑ GT ❑ GG One-Call Ticket: 2026310677 & 2026310676 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 UNS 98 PSI (See comments) 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 SAT 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 SAT 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 SAT EFV 1200 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A IPUC Form 4 Rev. 12/08/2025 IPUC Construction Inspection 20. Line Locating OPS 611 N/A 21. Plastic Pipe OPS 307 SAT - Joiner(s) Qualificd OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pipe OPS 200 N/A - Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 -Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (7752 & 7740 E Bullhead St, Nampa) Safety equipment, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, EFV 1200, tracer wire, bedding with sand, pressure test, squeeze off(observed release), backfill. A contractor was observed performing a pressure test at 98 psi. After the pressure test, the contractor fused on approximately a three-foot pup to the service line (extending the service line) and did not conduct a secondary pressure test prior to releasing the squeeze. Corrective Action Required: ® Yes ❑ No Compliance Letter#: I202611 Lead Inspector: Galli Date: Reviewer: Brooks Date: _ 260805 Signature: Signature: IPUC Form 4 Rev.12/08/2025