Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Intermountain Gas 260804 Meridian Construction Construction
IPUC Construction Inspection Inspector(s): Galli Date(s): 260804 Company/Owner: Intermountain Gas Company(IGC) Unit/OPID: 8160 Address: Intersection of Lake Hazel and Meridian City/District: Meridian Contractor/Job#: W012645023, Foreman: Dasco Operator Supervisor: N/A K.Vo son Job Description: 4" Main Line System Type: ❑X GD ❑ GT ❑ GG One-Call Ticket: 2026303501 Total Inspection Days: 1.0 Tasks: Procedure Rating Comments 1. Materials—Handling, Storage, OPS 11 SAT Labeling 2. Trenching/Boring—Depth, Clearance OPS 308 SAT 48 inches OPS 322 3. Bedding/Backfill OPS 308 SAT Bedding with sand SF 418 4. Pipe Installation(Tracer Wire) OPS 308 SAT 14-gauge in open trench OPS 322 5. Valve Installation OPS 703 N/A 6. Coating Condition OPS 401 N/A OPS 402 OPS 403 7. Manuals—Field Procedures, O & M SAT IGC procedures followed 8. Testing—Pressure, Duration, Type OPS 505 N/A 9. OQ Qualifications OPS 800 SAT Verified 10. Casing Seal/Installation OPS 325 N/A 11. Service Line Installation OPS 302 N/A 12. Tie-In/Hot Tapping OPS 600 N/A 13. Meter Location/Regulator Testing OPS 302 N/A 14. Equipment Calibration Verification OPS 501 SAT Verified 15. EFV Installation OPS 301 N/A 16. MAOP OPS 602 N/A OPS 606 OPS 900 OPS 1000 17. Purge OPS 603 N/A 18. Safety Equipment SF 418 SAT Fire Extinguisher SF 422 19. Abandonment OPS 607 N/A 20. Line Locating OPS 611 N/A IPUC Form 4 Rev.12/08/2025 IPUC Construction Inspection 21. Plastic Pine OPS 307 SAT - Joiner(s) Qualified OPS 309 - Fusion Tools OPS 325 - Squeezing OPS 800 - Heat Plate - Joining Procedure 22. Steel Pine OPS 200 N/A -Welder(s) Qualified OPS 201 Pipe/Coating—Inspected/Repaired OPS 202 - Cathodic Protection OPS 306 - Non-Destructive Testing OPS 401 - Welding Procedures OPS 407 - Removal of asbestos wrap OPS 402 - Exothermic Welding OPS 403 Additional Comments: Observations included: (Intersection of Lake Hazel and Meridian): Safety equipment, valid dig ticket, material verification, verified operator qualifications, verified equipment calibration, correct trench depth, verified proper roll back of completed butt fusions, observed butt fusion process, tracer wire and bedding with sand. Observed crew identify anomalies greater than 10%, cut out and refuse. All observed procedures were followed in accordance with IGC procedures. Corrective Action Required: ❑ Yes ® No Compliance Letter#: N/A Lead Inspector: Galli Date: Reviewer: Brooks Date: 260804 Signature: Signature: �Go`IdR IPUC Form 4 Rev. 12/08/2025