This letter is intended to address one(1)area of concern stemming from a construction inspection conducted by the
Idaho Public Utilities Commission(IPUC)on September 1,2026,in the Element Ridge Subdivision and Verbena
Ranch Subdivision,in Caldwell Idaho within the Intermountain Gas Company(IGC)Nampa District pursuant of
Chapter 601 Title,49,United States Code.
AREA OF CONCERN
1. 49 CFR§192.605 Procedural manual for operations.maintenance,and emergencies.
General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for
conducting operations and maintenance activities and for emergency response.For transmission lines,the
manual must also include procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year.
This manual must be prepared before operations of a pipeline system commence.Appropriate parts of the
manual must be kept at locations where operations and maintenance activities are conducted.
2. 49 CFR$192.756 Joining plastic sine by heat fusion eouiument maintenance and calibration.
Each operator must maintain equipment used in joining plastic pipe in accordance with the
manufacturer's recommended practices or with written procedures that have been proven by test and
experience to produce acceptable joints.
3. OPS 307 Polvethvlene WE)Main and Service Construction
4. Cleaning
4.1. Cleaning shall be performed per the manufacturer's instructions,or when butt fusing per TR-33
Appendix A.
5.11.Butt fusions shall be made in accordance with TR-33 Appendix A.
NOTE: TR-33 was used to develop ASTM 2620-19,making the level of safety in TR-33 equivalent to
that of ASTM 2620-19.
7.Care and Maintenance of Tools
7.1.Equipment used in joining PE pipe shall be maintained in accordance with the manufacturer's
recommended practices or procedures.
7.2.Heat fusion equipment shall be free of rust,corrosion,dirt,and/or molten plastic residue that can
impair the quality of fusion joints.
7.3.After each use,remove melt residue from the heater surface with a soft wooden stick or by wiping
with a clean dry,lint-free,non-synthetic cloth such as cotton or paper towel.
4. TR-33 (2012 edition)—Generic Butt Fusion Joining Procedure for Field Joining of Polvethvlene
E L
4.0.MELT—Heating tools that simultaneously heat both pipe ends are used to accomplish this operation.
These heating tools are normally furnished with thermometers to measure internal heater temperature so the
operator can monitor the temperature before each joint is made.However,the thermometer can be used only as
a general indicator because there is some heat loss from internal to external surfaces,depending on factors such
as ambient temperatures and wind conditions.A pyrometer or other surface temperature-measuring device
should be used before the first joint of the day is made and periodically throughout the day to ensure proper
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608 a BOISE,IDAHO 83707 a(208)377-6000 a FAX:377-6097
temperature of the heating tool face that contacts the pipe or fitting ends.Additionally,heating tools
are usually equipped with suspension and alignment guides that center them on the pipe ends. The
heater faces that come into contact with the pipe should be clean,oil-free and coated with a nonstick
coating as recommended by the manufacturer to prevent molten plastic from sticking to heater
surfaces.Remaining molten plastic can interfere with fusion quality and must be removed according to
the tool manufacturer's instructions.Never use chemical cleaner or solvents to clean heating tool
surfaces.
7.0.VISUAL INPSECTION
Visually inspect and compare the joint against the manufacturer's recommended appearance
guidelines.Visually,the width of butt fusion beads should be approximately 2-2 'h times the bead
height above the pope and the beads should be rounded and uniformly sized all around the pipe
circumference.The v-groove between the beads should not be deeper than half the bead height above
the pipe surface.When butt fusing to molded fittings,the fitting-side bead may display shape
irregularities such as minor indentations,deflections and non-uniform bead rollover from molded part
cooling and knit lines.In such cases,visual evaluation is based mainly on the size and shape of the
pipe-side bead. (See Appendix D for bead configuration).Visually unacceptable joints should be cut
out and refused using the correct procedure.(See manufacturer's visual inspection guidelines).
5. McElroy Operator's Manual— 1 LC Fusion Machine
Clean Heater Surfaces 01/
Ti.hwt.r—be keep dean wd leas of ar,y yf.a'w toy awe
convmnanon and=vanes
Before each keen is mode,the surface of the heater must be
—p.d weh a cban,non synthetic cloth
1 LC Fusion Machine Checklist
hen,to Check Samsfoctory Needs R.par Cemmenh
Repair
uNR
Mochm is dean
Clomp knob bearing.knbrfwt.d and mow hooly
M—abls pw moves Freely
lading caw woks propedy
G3oide rods an rql domaged
Cloerping iow and in erl gtoows are dean
All net.and bats on tight
FACER
Check I«ploy in blade holder
F—ar does na wobble when kopped betty lows
Blades awe in good condition
latch hand4 locks owe guide nod kooly
Faces maws an guide .&withal escen-lance
Facet is clean and tree of grease an blade holder
solace
NEATER
Heater—face is dean and in good condi lion
Th.—no.r a in good working ends
Surk—rampaduw checked-rh pytornew
Finding(s)•
e Staff observed completed fusions that had been made using damaged and dirty heating
elements. Contractor employees stopped fusion when questioned about maintenance of their
fusion equipment. There were three dirty/damaged heating elements. These were found at
the Element Ridge location(WO12720022).
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608-BOISE,IDAHO 83707-(208)377-6000-FAX:377-6097
• In the Verbena Ranch location staff identified several unsatisfactory fusions in a staging area
which appeared to be prefab work for future installation.
FWerm Phatm
11C3
Contaminated Imn'W'in use side.A Contaminated Iron'/."in use Side B
Gou ed S '''N"iron side A Goo ed S "iron side B
Dania ed 4"iron side A Dania cd 4"iron side B
Reference Photos
enrme.esrxww-a..r..:.rn eaem• 1lef�
Fusion I Fusion 2
aP� y
DC t Reference
Intermountain Gas Response
Finding/Bullet No. 1: Upon further investigation, IGC verified with the contractor, Crown, that the fusion heater
plates identified by the IPUC operated properly and the fusions that were completed passed. IGC understands the
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
importance of maintaining equipment and verifying that it is in good working condition before use.IGC will provide
communication to the contractor on proper equipment maintenance and pre-use verification. Additionally, IGC has
contacted the manufacturer for validation and additional guidance regarding acceptable condition of used fusion
equipment.
Finding/Bullet No. 2: Upon further investigation, IGC verified that the fusions identified by the IPUC were not
intended for use and were not installed. The fusions had been cut out and set aside after the fuser deemed them
unsatisfactory. IGC will provide communication to the contractor, Das-Co, on the identification and/or prompt
disposal of such materials to eliminate the risk of inadvertent installation.
Please contact Josh Sanders at(701)222-7773 with questions or comments.
Respectfully Submitted,
Pat Darras
Vice President,Engineering&Operations Services