HomeMy WebLinkAboutI202616 NOPV Response EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
September 24,2026
Mr.Jeff Brooks,Programs Manager
Idaho Public Utility Commission
PO Box 83720
Boise,ID 83720-0074
Subject:Response to the Notice of Probable Violation dated August 21,2026(Report#I202616)
Dear Mr.Brooks,
This letter is intended to address one(1)notice of probable violation stemming from a construction inspection
conducted by the Idaho Public Utilities Commission(IPUC)on August 19,2026,at 660 S Cassandra Ave,in Kuna
Idaho within the Intermountain Gas Company(IGC)Boise District pursuant of Chapter 601 Title,49,United States
Code.
PROBABLE VIOLATION
1. 49 CFR§192,605 Procedural manual for operations.maintenance,and emergencies.
General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for
conducting operations and maintenance activities and for emergency response.For transmission lines,the
manual must also include procedures for handling abnormal operations. This manual must be reviewed
and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year.
This manual must be prepared before operations of a pipeline system commence.Appropriate parts of the
manual must be kept at locations where operations and maintenance activities are conducted.
2. 55-2205. PERMIT COMPLIANCE — NOTICE OF EXCAVATION — RESPONSE TO
NOTICE—COMPENSATION FOR FAILURE TO COMPLY—EXEMPTIONS.
(1)Before commencing excavation,the excavator shall:
(a)Comply with other applicable law or permit requirements of any public agency issuing permits;
(b) Pre-mark on-site the path of excavation with white paint or, as the circumstances require, other
reasonable means that will set out clearly the path of excavation. An excavator need not pre-mark as
required in this subsection if-
(i)The underground facility owner or its agent can determine the location of the proposed excavation by
street address or lot and block by referring to locate ticket;or
(ii) The excavator and underground facility owner have had a meeting prior to the beginning of the
proposed excavation at the excavation site for the exchange of information required under this subsection.
(c) Provide notice of the scheduled commencement of excavation to all underground facility owners
through a one-number notification service.If no one-number notification service is available,notice shall
be provided individually to those owners of underground facilities known to have or suspected of having
underground facilities within the area of proposed excavation. The notice shall be communicated by the
excavator to the one-number notification service or,if no one-number notification service is available,to
the owners of underground facilities not less than two(2)business days nor more than ten(10)business
days before the scheduled date for commencement of excavation,unless otherwise agreed in writing by
the parties.
(2)Upon receipt of the notice provided for in this section,the underground facility owner or the owner's
agent shall locate and mark its locatable underground facilities with reasonable accuracy, as defined in
section 55-2202,Idaho Code,by surface-markings the location of the facilities.If there are identified but
unlocatable underground facilities,the owner of such facilities or the owner's agent shall locate and mark
the underground facilities in accordance with the best information available to the owner of the
underground facilities. The owner of the underground facility or the owner's agent providing the
information shall respond no later than two(2)business days after the receipt of the notice or before the
excavation time set forth in the excavator's notice,at the option of the underground facility owner,unless
otherwise agreed in writing by the parties. Excavators shall not excavate until all know facilities have
been marked. Once marked by the owner of the underground facility or the owner's agent,the excavator
is responsible for maintaining the markings.
EXECUTIVE OFFICES
INTERMOUNTAIN GAS COMPANY
555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097
3. OPS 611 Line Locating and Marking
2.LOCATING AND MARKING
2.1.Underground facilities within the area of proposed excavation shall be marked within
reasonable accuracy and within the time limits per the requirements of the applicable state dig law.
Findinds)•
During excavation activities for gas pipeline service installation,locate markings were not maintained or
present for the electric facilities within the excavation path for the gas line.
Reference Photos 1
0106°E(T) 43.28'57"N,116°25'35"W t13ft ♦2687ft 02561W(T) 43°28'57'N,116"25'34"W±9ft •2692ft
OL
i 1
Active Excavation Overview Facin East Active Excavation Overview Facing West
Intermountain Gas Resgonse
IGC acknowledges the findings brought for the by the IPUC. After the missing locates were identified, Das-Co did
not continue excavation at that location. IGC will communicate with Das-Co regarding the importance of verifying
locates before beginning excavation.
Please contact Josh Sanders at(701)222-7773 with questions or comments.
Respectfully Submitted,k-lja-64--C�
Pat Darras
Vice President,Engineering&Operations Services
Intermountain Gas Company