Loading...
HomeMy WebLinkAboutI202616 NOPV Response EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 September 24,2026 Mr.Jeff Brooks,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to the Notice of Probable Violation dated August 21,2026(Report#I202616) Dear Mr.Brooks, This letter is intended to address one(1)notice of probable violation stemming from a construction inspection conducted by the Idaho Public Utilities Commission(IPUC)on August 19,2026,at 660 S Cassandra Ave,in Kuna Idaho within the Intermountain Gas Company(IGC)Boise District pursuant of Chapter 601 Title,49,United States Code. PROBABLE VIOLATION 1. 49 CFR§192,605 Procedural manual for operations.maintenance,and emergencies. General. Each operator shall prepare and follow for each pipeline, a manual of written procedures for conducting operations and maintenance activities and for emergency response.For transmission lines,the manual must also include procedures for handling abnormal operations. This manual must be reviewed and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year. This manual must be prepared before operations of a pipeline system commence.Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. 2. 55-2205. PERMIT COMPLIANCE — NOTICE OF EXCAVATION — RESPONSE TO NOTICE—COMPENSATION FOR FAILURE TO COMPLY—EXEMPTIONS. (1)Before commencing excavation,the excavator shall: (a)Comply with other applicable law or permit requirements of any public agency issuing permits; (b) Pre-mark on-site the path of excavation with white paint or, as the circumstances require, other reasonable means that will set out clearly the path of excavation. An excavator need not pre-mark as required in this subsection if- (i)The underground facility owner or its agent can determine the location of the proposed excavation by street address or lot and block by referring to locate ticket;or (ii) The excavator and underground facility owner have had a meeting prior to the beginning of the proposed excavation at the excavation site for the exchange of information required under this subsection. (c) Provide notice of the scheduled commencement of excavation to all underground facility owners through a one-number notification service.If no one-number notification service is available,notice shall be provided individually to those owners of underground facilities known to have or suspected of having underground facilities within the area of proposed excavation. The notice shall be communicated by the excavator to the one-number notification service or,if no one-number notification service is available,to the owners of underground facilities not less than two(2)business days nor more than ten(10)business days before the scheduled date for commencement of excavation,unless otherwise agreed in writing by the parties. (2)Upon receipt of the notice provided for in this section,the underground facility owner or the owner's agent shall locate and mark its locatable underground facilities with reasonable accuracy, as defined in section 55-2202,Idaho Code,by surface-markings the location of the facilities.If there are identified but unlocatable underground facilities,the owner of such facilities or the owner's agent shall locate and mark the underground facilities in accordance with the best information available to the owner of the underground facilities. The owner of the underground facility or the owner's agent providing the information shall respond no later than two(2)business days after the receipt of the notice or before the excavation time set forth in the excavator's notice,at the option of the underground facility owner,unless otherwise agreed in writing by the parties. Excavators shall not excavate until all know facilities have been marked. Once marked by the owner of the underground facility or the owner's agent,the excavator is responsible for maintaining the markings. EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608•BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 3. OPS 611 Line Locating and Marking 2.LOCATING AND MARKING 2.1.Underground facilities within the area of proposed excavation shall be marked within reasonable accuracy and within the time limits per the requirements of the applicable state dig law. Findinds)• During excavation activities for gas pipeline service installation,locate markings were not maintained or present for the electric facilities within the excavation path for the gas line. Reference Photos 1 0106°E(T) 43.28'57"N,116°25'35"W t13ft ♦2687ft 02561W(T) 43°28'57'N,116"25'34"W±9ft •2692ft OL i 1 Active Excavation Overview Facin East Active Excavation Overview Facing West Intermountain Gas Resgonse IGC acknowledges the findings brought for the by the IPUC. After the missing locates were identified, Das-Co did not continue excavation at that location. IGC will communicate with Das-Co regarding the importance of verifying locates before beginning excavation. Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted,k-lja-64--C� Pat Darras Vice President,Engineering&Operations Services Intermountain Gas Company