Loading...
HomeMy WebLinkAboutI202612 NOPV Response EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 September 10,2026 Mr.Jeff Brooks,Programs Manager Idaho Public Utility Commission PO Box 83720 Boise,ID 83720-0074 Subject:Response to the Notice of Probable Violation dated August 6,2026(Report#I202612) Dear Mr.Brooks, This letter is intended to address one(1)notice of probable violation stemming from a construction inspection conducted by the Idaho Public Utilities Commission(IPUC)on August 6,2026,at 203 E Tower Lane,Meridian,ID (WO12674425)within the Intermountain Gas Company(IGC)Boise District pursuant of Chapter 601 Title,49, United States Code. PROBABLE VIOLATION 1. 49 CFR 6192,605 Procedural Manual for ORerations.Maintenance.and Emergencies (a) General. Each operator shall prepare and follow for each pipeline,a manual of written procedures for conducting operations and maintenance activities and for emergency response.For transmission lines,the manual must also include procedures for handling abnormal operations.This manual must be reviewed and updated by the operator at intervals not exceeding 15 months,but at least once each calendar year.This manual must be prepared before operations of a pipeline system commence. Appropriate parts of the manual must be kept at locations where operations and maintenance activities are conducted. 2. OPS 614 Damage Prevention Program PURPOSE To enhance public safety and protection of MDU Utilities Group(MDUG)gas,electric,and other owned and operated underground facilities from excavation damages through educational outreach and implementation of safe excavation best practices. REFERENCES External References: 49 CFR§ 192.614 Damage Prevention Program ID 55 Chapter 22 Underground Facilities Damage Prevention 3. Idaho's Guide to Safe Digging 2026-2027 55-2205.PERMIT COMPLIANCE—NOTICE OF EXCAVATION—RESPONSE TO NOTICE— COMPENSATION FOR FAILURE TO COMPLY—EXEMPTIONS. (5)If the excavator,while performing the excavation,discovers underground facilities(whether active or abandoned)that are no identified or were not located in accordance with subsection(2)of this section,the excavator shall cease excavating in the vicinity of the facility and immediately notify the owner or operator of such facilities,or the one-number notification service. FindinE(s)• During excavation to locate a 4-inch PE main,an IGC contractor struck and damaged an unmarked purple conduit that was later identified as belonging to Lumen Technologies.Following the strike,the operator did not immediately cease excavation activities or notify the affected utility,as required,and instead continued excavating. EXECUTIVE OFFICES INTERMOUNTAIN GAS COMPANY 555 SOUTH COLE ROAD-P.O.BOX 7608• BOISE,IDAHO 83707•(208)377-6000•FAX:377-6097 Reference P1181N(M) t_gra hs 011"N(M) *43"32'37"N,116°23'21"W t9tt •2685ft Iik,43*32'37"N,116'23'21'W tl3ft •2680tt or r rya Comms Strike Overview f Comms Strike Close Up Intermountain Gas ResUonse IGC acknowledges the finding brought forth by the IPUC. Das-Co was performing work under a valid locate ticket. The conduit was not located by Lumen Technologies and did not contain any facilities.Das-Co is also contracted to perform work on behalf of Lumen Technologies,which authorized Das-Co to complete the applicable repairs while onsite.Based on these circumstances,no additional notification was made to Lumen Technologies. Although Das-Co is authorized by Lumen Technologies to make repairs,IGC will further educate Das-Co that when performing work on behalf of IGC they must notify the owner or operator of any damaged facilities as required per ID 55 Chapter 22 Underground Facilities Damage Prevention. Please contact Josh Sanders at(701)222-7773 with questions or comments. Respectfully Submitted, Pat Darras Vice President,Engineering&Operations Services Intermountain Gas Company